HomeMy WebLinkAboutHEARTSIDE HILL ODP - ODP210005 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCommunity Development and Neighborhood Services 281 North College AvenuePO Box 580Fort Collins, CO 80522970.221.6689970.224.6134 faxfcgov.com/developmentreviewJanuary 25, 2022Cathy
Mathis TB Group444 Mountain AvenueBerthoud, CO 80513RE: Heartside Hill ODP, ODP210005, Round Number 1Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Heartside Hill ODP. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development
Review Coordinator, Todd Sullivan via phone at 9702216695 or via email at tsullivan@fcgov.com. Comment Summary:Department: Planning ServicesContact: Will Lindsey, , wlindsey@fcgov.comTopic:
GeneralComment Number: 1 Comment Originated: 01/21/202201/21/2022: FOR HEARING: Is Parcel C which includes the Church and the future community building intended for additional
redevelopment in the future? If not please label the area of the site for the future community building as its own parcel separate from the church (which is consistent with the plat
documentation submitted).Comment Number: 2 Comment Originated: 01/21/202201/21/2022: FOR HEARING: The overall development plan shall conform to the Master Street Plan requirements
and the street pattern/connectivity standards both within and adjacent to the boundaries of the plan as required pursuant to Sections 3.6.1 and 3.6.3(A) through (F). Please provide a
narrative with the ODP detailing how this requirement is being met.A separate ODP specific narrative with the next submittal.Comment Number: 3 Comment Originated: 01/21/202201/21/2022:
FOR HEARING: Has there been any discussion with Parks and Recreation about connection to the Fossil Creek Trail running on the east side of S Lemay Ave? Can a pedestrian connection
arrow be added to the ODP indicating howthis site will facilitate connection to the trail and the adjacent neighborhoods?Department: Engineering Development ReviewContact: Dave Betley,
9702216573, dbetley@fcgov.comTopic: GeneralComment Number: 1 Comment Originated: 01/25/202201/25/2022: FOR INFORMATION; Engineering does not have comments on the ODP.
Engineering's comments are concentrated under the PDP submittal.Department: Stormwater Engineering – Erosion and Sediment ControlContact: Jesse Schlam, 9702182932, jschlam@fcgov.comTopic:
Erosion ControlComment Number: 1 Comment Originated: 01/19/202201/19/2022: No Comments for the ODP all erosion control comments will be directed to the PDP210020 and subsequent
submittals under that project documents.Department: Stormwater EngineeringContact: Matt Simpson, (970)4162754, masimpson@fcgov.comTopic: GeneralComment Number: 2 Comment
Originated: 01/21/202201/21/2022: FOR INFORMATION:The ODP drainage concept looks good. Please see comments on the PDP drainage design.Department: WaterWastewater EngineeringContact:
Matt Simpson, (970)4162754, masimpson@fcgov.comTopic: GeneralComment Number: 1 Comment Originated: 01/21/202201/21/2022: FOR INFORMATION:This project site is located
within the Fort Collins Loveland Water District and the South Fort Collins Sanitation District for water and sewer service. Please contact them at (970) 2263104 for development requirements.Department:
Light And PowerContact: Rob Irish, 9702246167, rirish@fcgov.comTopic: GeneralComment Number: 1 Comment Originated: 01/25/202201/25/2022: Information Only: Light & Power
has two large electric duct banks running adjacent to this site along Trilby Rd. and one large electric duct bank adjacent to the site along Lemay Ave. Any Modification or relocation
of these facilities would be very expensive and the responsibility of the developer.Comment Number: 2 Comment Originated: 01/25/202201/25/2022: Information Only: Light & Power
has quite a bit of infrastructure at the Southeast corner of the site. Any relocation or modification to these facilities would be very expensive and the responsibility of the developer.Department:
PFAContact: Marcus Glasgow, 9704162869, marcus.glasgow@poudrefire.orgTopic: GeneralComment Number: 1 Comment Originated: 01/21/202201/21/2022: All comments can be found
on PDPDepartment: Internal ServicesContact: Russell Hovland, 9704162341, rhovland@fcgov.comTopic: Building Insp Plan ReviewComment Number: 1 Comment Originated: 01/16/202201/16/2022:
See comments on PDP210020.Department: Technical ServicesContact: Jeff County, 9702216588, jcounty@fcgov.comTopic: GeneralComment Number: 1 Comment Originated: 01/25/202201/25/2022:
FOR FINAL APPROVAL:Please add to the legal description as marked. See redlines.Comment Number: 2 Comment Originated: 01/25/202201/25/2022: FOR FINAL APPROVAL:Please revise
the street names shown on sheet 2. See redlines.