RESPONSES TO FDP210027, ROUND ONE
COMMENT LETTER DATED DECEMBER 17, 2021
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970-416-2744,
bbethuremharras@fcgov.com
Topic: General
1 12/14/2021: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Response: Understood
2 12/14/2021: INFORMATION:
As part of your resubmittal, you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable, avoiding responses like noted or
acknowledged.
Response: Understood
3 12/14/2021: INFORMATION:
Please follow the Electronic Submittal Requirements and File Naming Standards
found at https://www.fcgov.com/developmentreview/files/electronic submittal
requirements and file naming standards_v1_8 1 19.pdf?1566857888. File
Foothills Unitarian Church
Fort Collins Development Review
names should begin with the file type, followed by the project information, and
round number. Example: UTILITY PLANS_PROJECT NAME_PDP_Rd2.pdf
File type acronyms maybe appropriate to avoid extremely long file names.
Example: TIS for Traffic Impact Study, ECS for Ecological Characterization Study.
*Please disregard any references to paper copies, flash drives, or CDs.
Response: Understood
4 12/14/2021: INFORMATION:
All plans should be saved as optimized/flattened PDFs to reduce file size and
remove layers. Per the Electronic Submittal Requirements AutoCAD SHX
attributes need to be removed from the PDF’s. AutoCAD turns drawing text into
comments that appear in the PDF plan set, and these must be removed prior to
submittal as they can cause issues with the PDF file. The default setting is "1"
("on") in AutoCAD. To change the setting and remove this feature, type
"EPDFSHX" in the command line and enter "0".
Read this article at Autodesk.com for more tips on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdca
rticles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by
-AutoCAD.html
Response: Understood
5 12/14/2021: INFORMATION:
Temporary Service Changes - City of Fort Collins Development Review
In order to continue providing thorough reviews and giving every project the
attention it deserves, the City of Fort Collins is implementing temporary changes
in how we serve our development customers. As you may be aware, we are
experiencing staff shortages in a number of key departments, which has begun
to impact the timeliness of our reviews. We recognize that development and
construction play a critical role in our community’s vibrancy and economic
recovery, and we have been exploring options for mitigating impacts to our
customers. As a result, we will be making some temporary service changes.
Beginning Monday May 10, 2021, one additional week of review time will be
added to all 1st and 2nd round submittals (increase from 3 weeks to 4 weeks).
Response: Understood
6 12/14/2021: INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the
expiration of your project. (LUC 2.211 Lapse, Rounds of Review).
Foothills Unitarian Church
Fort Collins Development Review
Response: Understood
7 12/14/2021: FOR FINAL APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this
project. I will provide a recording checklist and process information when we are
closer to this step.
Response: Understood
8 12/14/2021: INFORMATION:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are ready to resubmit your
plans, please notify me with as much advanced notice as possible.
Response: Understood
Department: Planning Services
Contact: Clark Mapes, 970-221-6225, cmapes@fcgov.com
1 12/14/2021: FOR FINAL APPROVAL:
The Rain Garden planting detail suggests a detailed seeding of "Terrace Grass"
and Bottom Grass". Those grasses should be added to the plant list(s). Staff is
very interested in the concept and whether there's proven experience with it.
Response: Seed mixes for the rain garden have been added to the rain
garden planting plan (L.3). The seed mixes have been designed by a very
experienced landscape architect.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
1 12/14/2021: FOR FINAL APPROVAL:
Please provide confirmation that the retaining wall along the south side of the
building does not directly abut the sidewalk. There appears to be a discrepancy
on the depiction of the wall between the landscape plan (which has the
separation) and the civil plan (which is less apparent).
Foothills Unitarian Church
Fort Collins Development Review
Response: Retaining wall revised to be 2 feet behind the s/w as noted on the
grading detail on sheet C6.
2 12/14/2021: INFORMATION:
It appears the cost of four deeds of dedication were provided. I believe only
three is needed as the emergency access easement dedication can be done on
one document with two legal descriptions. We'll want to confirm the acceptability
of the legal descriptions for PFA, Stormwater, and Light & Power respectively. I
believe the storm drainage easement should just be considered a drainage
easement, and the electric easement should be considered a utility easement.
Response: Understood
3 12/14/2021: INFORMATION:
The Streets Department (Tom Knostman) has confirmed that they are intending
to rehab the pavement to Yorktown this year. They will want to coordinate with
the development on the timing of the construction of the respective projects. It
could be that the sealant application can just be skipped if Streets' work happens
soon after.
Response: We have passed this information along to the contractor.
Department: Traffic Operation
Contact: Spencer Smith 970-221-6820, smsmith@fcgov.com
1 12/14/2021: INFORMATION:
Traffic memo was previously reviewed and accepted. No further comments at
this time.
Response: Understood
Department: Erosion Control
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
1 12/09/2021: FOR FINAL APPROVAL:
How much area is going to be disturbed with your project?
Foothills Unitarian Church
Fort Collins Development Review
Area of Disturbance: Total area at the site where any Construction Activity is
expected to result in disturbance of the ground surface. This includes any activity
that could increase the rate of erosion, including but not limited to, clearing,
grading, excavation, and demolition activities, installation of new or improved
haul roads and access roads, staging areas, heavy vehicle traffic areas,
stockpiling of fill materials, and borrow areas. That will help us better estimate
the Inspection fees.
Please add a note to the plans indicating the area of disturbance.
Note: if the disturbed area is less than an acre but over 10,000 square feet no
Erosion Control report would be required and only erosion and Sediment Control
Plans would be needed. If the disturbed area exceeds one acre an erosion and
Sediment Control report would also be required.
Response: Total area disturbed included on sheet C6. The ero sion control
report is a part of the Drainage Report, see resubmitted Drainage and
Erosion Control Report.
2 12/09/2021: INFORMATION:
The City Manager’s development review fee schedule under City Code 7.5-2 was
updated to include fees for Erosion Control and Stormwater Inspections. As of
January 1st, 2021, these fees will be collected on all projects for such inspections.
The Erosion Control fees are based on; the number of lots, the total site
disturbance, the estimated number of years the project will be active and the
Stormwater Inspection Fees are based on the number of LID/WQ Features that
are designed for on this project.
Based on the proposed site construction associated with this project we are
assuming 1 lots, 0 acres of disturbance, 1 years from demo through build out of
construction and an additional 3 years till full vegetative stabilization due to
seeding. Which results in an Erosion Control Fee estimate of $1116.04.
Based on 1 bioretention/level spreaders, the estimate of the Stormwater
LID/WQ Inspection fee is $315.
Please note that as the plans and any subsequent review modifications of the
above-mentioned values change the fees may need to be modified. I have
provided a copy of the spreadsheet used to arrive at these estimates for you to
review.
Response: Understood
Department: Stormwater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
Foothills Unitarian Church
Fort Collins Development Review
3 12/14/2021: FOR FINAL APPROVAL:
The rain garden forebay should be made of concrete to provide for easy
maintenance and sediment removal. Feel free to contact me for examples from
other projects.
Response: A concrete forebay is now included at the inlet of the raingarden
see sheet C17 for details
4 12/14/2021: FOR FINAL APPROVAL:
For scour protection please use a permanent turf reinforcement mat (TRM) or
scour stop instead of rip-rap. Type VL is small, and the shear stresses could be
mitigated by other methods. The FCSCM discourages use of rip-rap unless
necessary and recommends other methods of scour protection.
Response: Turf reinforcement mats will replace previously designed rip rap
pads.
5 12/14/2021: FOR FINAL APPROVAL:
For the rain garden underdrain, please see if you can connect the underdrain to
the outlet by gravity. Only use the upturned elbow if a gravity outlet for
underdrain is not achievable.
Response: Upturned elbow needs to be used based on existing storm
elevations.
6 12/14/2021: FOR FINAL APPROVAL:
Please review all standard notes on the plans and update to the 2021 Larimer
County Urban Area Street Standards (LCUASS) general notes found in Appendix
E: https://www.larimer.org/urban-area-street-standards-2021
Response: Notes updated to be per the latest as noted.
7 12/14/2021: FOR FINAL APPROVAL:
On the Landscape Plan, please provide clarification of the seed mixes for the
detention pond and rain garden areas.
Response: Rain garden seed information has been added to L.3
Foothills Unitarian Church
Fort Collins Development Review
8 12/14/2021: FOR FINAL APPROVAL:
In the drainage report please address the following items:
- Size the spillway width using the peak inflow (as opposed to the detained
outlet flowrate).
- Add to the drainage map: a) detention pond summary table, b) LID and
WQ summary table.
Response: Comments acknowledged, see revised drainage plan an d report
9 12/14/2021: FOR FINAL APPROVAL:
In the drainage report - please provide evidence that the detention basin is in
compliance with drain times per Colorado Revised Statute 37-92-602(8). More
information on this statute is available at
http://tinyurl.com/RevisedStatuteMemo, and a spreadsheet to show compliance
is available for download at http://tinyurl.com/ComplianceSpreadsheet. Please
contact me with any questions about this requirement or for assistance with the
spreadsheet.
Response: Drainage report has been updated to include drain time
spreadsheet.
10 12/14/2021: FOR FINAL APPROVAL:
Please use City of Fort Collins standard outlet structure detail. D-46
https://citydocs.fcgov.com/index.php?scope=doctype&dn=Utilities&dt=DETAIL+D
RAWINGS&vid=189&q=stormwater&cmd=search
Response: The latest Fort Collins outlet structure detail is now included.
11 12/14/2021: FOR FINAL APPROVAL:
Please see redlines of the Utility Plans, Landscape Plans, and Drainage Report
Response: Redlines have been addressed on drawings. Comment regarding
tree #45; this tree is existing.
Department: Water-Wastewater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
Foothills Unitarian Church
Fort Collins Development Review
1 12/14/2021: FOR FINAL APPROVAL:
Include the sizing calculations with the water service sizing memo.
Response: Calculations have been added to the water service sizing memo.
2 12/14/2021: FOR FINAL APPROVAL:
Trees must provide at least 6-ft (10-ft preferred) separation from the fire service
line. There are 3 trees that need location adjustments – see redlines. Please
revise the plans accordingly. Please add a note or call out to the plans with this
minimum separation.
Response: Water line, gas line and trees have been adjusted to provide all
required clearances.
3 12/14/2021: FOR FINAL APPROVAL:
Irrigation Water Service and Irrigation Plan Requirements -
The next FDP submittal will need to include:
- Preliminary Irrigation Plan (PIP) – plan requirements can be found at:
www.fcgov.com/WCS. Please contact Eric Olson (eolson@fcgov.com or
970-221-6704) with questions regarding the required PIP.
*The PIP only needs to be prepared for the areas that are being revised.
- Water budget (annual usage) and irrigation peak flow (gallons per
minute). This information should be included on the PIP and Landscape Plans.
*The water budget and irrigation peak flow need to be updated for the entire
site.
- Landscape Plan including hydrozone table updated with 2022 values – 3,
8, 14, and 18 gallons/square foot/year for very low, low, medium, and high zones,
respectively. These requirements were mentioned during the Major Amendment
Review with more clarification to come at FDP review. These are the result of
recent changes to Fort Collins Utilities Water Supply Requirements (WSR) and
Plant Investment Fees (PIF) codes which were adopted on Oct. 5, 2021 by City
Council. These changes are to be implemented 1/1/2022; more information can
be found at: www.fcgov.com/wsr-update
Response: Irrigation layout and full site hydrozone layout and water budget
have been completed for the entire site.
4 12/14/2021: INFORMATION:
The existing 1.5 inch commercial water and 1.5 inch irrigation services currently
Foothills Unitarian Church
Fort Collins Development Review
do not have an annual water allotment associated with them. To bring these
services up to current City Code, an annual water use allotment will be added to
each service upon approval of the development project. Please contact our
Utility Fee and Rate Specialists at (970) 416 4252 or UtilityFees@fcgov.com for
more information or questions. We can discuss this further during FDP.
Response: Hydrozone plan for entire site is now included.
5 12/14/2021: FOR FINAL APPROVAL:
Please see redlines of the Utility Plans, Landscape Plans, and Drainage Report
Response: Comments acknowledged, see revised plans
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
1 12/13/2021: FOR FINAL APPROVAL:
Landscape amendments for commercial properties will require an irrigation
review. Please describe in detail, how the existing irrigation system will be
adjusted to accommodate the landscape renovations or additions. Create an
irrigation legend identifying specific zones and methods of converting from turf
watering to drip applications. Please refer to the provisions outlined in Section
3.2.1(J) of the Land Use Code for details. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Response: An irrigation design for the entire site is included, as well as a site
hydrozone key and table.
Department: Light and Power
Contact: Cody Snowdon, 970-416-2306, csnowdon@fcgov.com
1 12/07/2021: FOR FINAL APPROVAL:
Please revise the easement for the electrical facilities per redlined plans to
include the electric primary from the public ROW to the transformer. Please
label the easement as a Utility Easement and not an Electrical Easement.
Response: Comments acknowledged, see revised plans
Department: PFA
Foothills Unitarian Church
Fort Collins Development Review
Contact: Marcus Glasgow, 970-416-2869,
marcus.glasgow@poudre-fire.org
1 12/08/2021: FOR FINAL APPROVAL:
FIRE LANE SURFACE - Fire lanes shall be designed as a flat, hard, all-weather
driving surface capable of supporting 40 tons. A note shall be added to the civil
plans indicating compliance.
Response: Note 6 added to sheet C5
2 12/08/2021: FOR FINAL APPROVAL:
ADDRESS POSTING - LOCAL AMENDMENT
- IFC 505.1.7: Address shall be clearly visible on approach from any street, drive
or fire lane that accesses the site. Buildings, either individually or part of a
multi-building complex, that have fire lanes on sides other than the addressed
street side, shall have address numbers on the side of the building fronting the
roadway from which it is addressed. Buildings that are addressed on one street,
but are accessible from other drives or roads, shall have the address numbers
AND STREET NAME on each side that is accessible from another drive or road.
Response: An existing pedestal sign along Drake will be relocated to a new
location along Drake. 8” tall building numbers will be added for visibility from
Yorktown Avenue and smaller address site signage will be added to parking
entrances on Yorktown Avenue.
Department: Environmental Planning
Contact: Scott Benton, (970)416-4290, sbenton@fcgov.com
1 12/14/2021: INFORMATION:
Thank you for the effort on providing a songbird nesting survey. Unfortunately,
the requirement is for a survey to be conducted if trees are removed during the
nesting season (Feb 1 - July 31), as per Tree Protection Note #9. As Dr. George
mentioned, October is outside of the nesting season, but his reconnaissance
would be helpful if a survey is needed during the nesting season.
For extra clarification, a nesting survey is only needed if tree removal occurs
from Feb 1 through July 31.
Response: Attempts will be made to remove trees outside of the nesting
season. If trees will be removed during the nesting season an updated survey
Foothills Unitarian Church
Fort Collins Development Review
will be provided at that time.
2 12/14/2021: FOR FINAL APPROVAL:
As per Planning Services comment regarding seed mixes, please provide the
details of all seed mixes to be used including common and scientific names,
proportions, and seeding rates.
If native seed mixes are used, please include the standard notes below on the
landscape plan:
NATIVE SEED MIX NOTES
1. THE TIME OF YEAR SEEDING IS TO OCCUR SHOULD BE OCTOBER
THROUGH EARLY MAY.
2. PREPARE SOIL AS NECESSARY AND APPROPRIATE FOR NATIVE SEED
MIX SPECIES THROUGH LOOSENING AND ADDITION OF AMENDMENTS THAT
PROMOTE WATER ABSORPTION AND RELEASE, THEN SEED IN TWO
DIRECTIONS TO DISTRIBUTE SEED EVENLY OVER ENTIRE AREA. DRILL SEED
ALL INDICATED AREAS AS SOON AS POSSIBLE AFTER COMPLETION OF
GRADING OPERATIONS.
3. IF CHANGES ARE TO BE MADE TO SEED MIX BASED ON SITE
CONDITIONS THEN APPROVAL MUST BE PROVIDED BY CITY ENVIRONMENTAL
PLANNER.
4. APPROPRIATE NATIVE SEEDING EQUIPMENT WILL BE USED
(STANDARD TURF SEEDING EQUIPMENT OR AGRICULTURE EQUIPMENT
SHALL NOT BE USED).
5. DRILL SEED APPLICATION RECOMMENDED PER SPECIFIED
APPLICATION RATE TO NO MORE THAN ½ INCH DEPTH. FOR BROADCAST
SEEDING INSTEAD OF DRILL SEEDING METHOD DOUBLE SPECIFIED
APPLICATION RATE. REFER TO NATIVE SEED MIX TABLE FOR SPECIES,
PERCENTAGES AND APPLICATION RATES.
6. PREPARE A WEED MANAGEMENT PLAN TO ENSURE THAT WEEDS ARE
PROPERLY MANAGED BEFORE, DURING AND AFTER SEEDING ACTIVITIES.
7. AFTER SEEDING THE AREA SHALL BE COVERED WITH CRIMPED
STRAW, JUTE MESH, OR OTHER APPROPRIATE METHODS.
8. WHERE NEEDED, TEMPORARY IRRIGATION SHOULD BE PROVIDED
UNTIL SEED IS GERMINATED THEN WEEN THE SEED FROM IRRIGATION. IF
IRRIGATION IS USED, THE IRRIGATION SYSTEM FOR SEEDED AREAS SHALL BE
FULLY OPERATIONAL AT THE TIME OF SEEDING AND SHALL ENSURE 100%
HEAD-TO-HEAD COVERAGE OVER ALL SEEDED AREAS. ALL METHODS AND
REQUIREMENTS IN THE APPROVED IRRIGATION PLAN SHALL BE FOLLOWED.
9. CONTRACTOR SHALL MONITOR SEEDED AREA FOR PROPER
Foothills Unitarian Church
Fort Collins Development Review
IRRIGATION, EROSION CONTROL, GERMINATION AND RESEEDING AS NEEDED
TO ESTABLISH COVER.
10. THE APPROVED NATIVE SEED MIX AREA IS INTENDED TO BE
MAINTAINED IN A NATURAL LIKE LANDSCAPE AESTHETIC. DO NOT MOW
DURING HOT, DRY PERIODS. DO NOT MOW LOWER THAN 6 TO 8 INCHES IN
HEIGHT TO AVOID INHIBITING NATIVE PLANT GROWTH.
11. NATIVE SEED AREA WILL BE CONSIDERED ESTABLISHED WHEN
SEVENTY PERCENT VEGETATIVE COVER IS REACHED WITH LESS THAN TEN
PERCENT OF COVER CONSISTING OF NOXIOUS WEEDS, NO BARE SPOTS
LARGER THAN ONE FOOT SQUARE, AND/OR UNTIL DEEMED ESTABLISHED BY
CITY PLANNING SERVICES AND EROSION CONTROL.
12. THE DEVELOPER AND/OR LANDSCAPE CONTRACTOR IS RESPONSIBLE
FOR ADEQUATE SEEDLING COVERAGE AND GROWTH AT THE TIME OF FINAL
STABILIZATION, AS DEFINED BY STATE AND LOCAL AGENCIES. IF FINAL
STABILIZATION IS NOT ACHIEVED TO THE SATISFACTION OF THE AGENCY,
THE DEVELOPER AND/OR LANDSCAPE CONTRACTOR SHALL BE
RESPONSIBLE FOR ADDITIONAL CORRECTIVE MEASURES TO SATISFY FINAL
VEGETATIVE REQUIREMENTS FOR CLOSEOUT.
Response: These notes have been added to sheet L.4
Department: Forestry
Contact: Christine Holtz, choltz@fcgov.com
1 12/17/2021: FOR FINAL APPROVAL – UPDATED
Thank you for including the tree species and locations for the trees to be planted
offsite. In the proposed Mitigation Tree Count table, it says replacement off-site
3, but in your Tree Removal Feasibility Letter you state that there will be
payment in lieu for one tree. Please adjust the number on the landscape plans
for replacement off-site to 2, and then state on the plan that there will be
payment in lieu for one tree.
Response: Off-site tree information has been updated on the lands cape plan.
2 12/17/2021: FOR FINAL APPROVAL
There are three cockspur hawthorns proposed between the education building
and the new sanctuary. Trees need to be at least 6 ft from water lines, and all
three of these trees are proposed closer than that. Additionally, trees need to be
at least 4 ft from gas lines. I do believe there is just enough room to shift the
trees southeast and maintain these separation requirements. If there is not
Foothills Unitarian Church
Fort Collins Development Review
enough room, please find another location for these trees onsite.
Response: Water line, gas line and trees have been adjusted to provide all
required clearances.
Department: Building Services
Contact: Katy Hand, khand@fcgov.com
1 12/14/2021: BUILDING PERMIT:
Please visit our website for current adopted codes, local amendments, and
submittal requirements. Note: 2021 Building Codes will be adopted early 2022
https://www.fcgov.com/building/application.php
https://www.fcgov.com/building/codes.php
https://www.fcgov.com/building/energycode
Response: Understood
2 12/14/2021: BUILDING PERMIT:
Building air tightness is required for additions to new buildings. Plan air barrier
details accordingly and contact Brad Smith for information on testing protocols.
brsmith@fcgov.com
Response: Understood
3 12/14/2021: BUILDING PERMIT:
The building is over 5,000 sf and will need to be fire sprinkled (if not currently) or
fire contained.
Response: We’ve been in contact with the building department. Fire sprinkler
system will be installed in new construction and most of the existing areas.
4 12/14/2021: BUILDING PERMIT:
A City licensed commercial general contractor is required to construct the
addition.
Response: Understood
Foothills Unitarian Church
Fort Collins Development Review
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
6 12/14/2021: FOR FINAL APPROVAL:
There are text over text issues. See redlines.
Response: Redlines of building elevations were not provided. We believe text
issues have been addressed.
7 12/14/2021: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Response: Redlines of building elevations were not provided. We believe text
issues have been addressed.
Topic: Utility Plans
9 12/14/2021: FOR FINAL APPROVAL:
Please provide the following information for the Benchmark Statement in the
EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM
(PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS
REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE
USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) = NAVD88 DATUM - X.XX’.
Response: Comment acknowledged, see benchmark
10 12/14/2021: FOR FINAL APPROVAL:
There are text over text issues. See redlines.
Foothills Unitarian Church
Fort Collins Development Review
Response: Comments acknowledged, see revised plans.
11 12/14/2021: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Response: Comments acknowledged, see revised plans.
12 12/14/2021: FOR FINAL APPROVAL:
Topic: General
8 12/14/2021: FOR FINAL APPROVAL:
FIRE ACCESS EXHIBIT: There are line over text issues. See redlines.
Response: Comments acknowledged, see revised plans.
Topic: Landscape Plans
5 12/14/2021: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Response: This has been corrected on all Landscape plans.
Topic: Site Plan
1 12/14/2021: FOR FINAL APPROVAL:
Some of the sheet titles in the sheet index do not match the sheet titles on the
noted sheets. See redlines.
Response: Sheet names have been updated.
2 12/14/2021: FOR FINAL APPROVAL:
Please separate the Planning set & Utility Plan set.
Response: Utility plan sheets have been removed from the drawing index on
sheet A.0
3 12/14/2021: FOR FINAL APPROVAL:
There are sheets missing from the sheet index. See redlines.
Response: Sheet list has been updated.
Foothills Unitarian Church
Fort Collins Development Review
4 12/14/2021: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Response: Text issues have been corrected.