Loading...
HomeMy WebLinkAboutPOUDRE VALLEY PLAZA MIXED-USE - FDP220001 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS© 2021 Microsoft Corporation © 2021 TomTom SHEET INDEX 1 C-1 COVER SHEET 2 C-2 STANDARD GENERAL NOTES 3 C-3 HORIZONTAL CONTROL PLAN DESCRIPTION 4 C-5 FINAL GRADING PLAN 5 C-6 FINAL DRAINAGE PLAN Know what's below. before you dig.Call RFINAL DEVELOPMENT PLAN UTILITY PLANS FOR POUDRE VALLEY PLAZA MIXED USE LOT 7, POUDRE VALLEY PLAZA P.U.D.COVER SHEETC-1 1 VICINITY MAP LEGEND OF SYMBOLS JLB FIRE: CIVIL ENGINEER: OWNER: PROJECT CONTACTS GAS/ELECTRIC UTILITY: ARCHITECT: WASTEWATER SYSTEM:WATER SYSTEM: TELECOMMUNICATION: UTILITY CONTACTS SURVEY NOTES CITY OF FORT COLLINS STATEMENT LANDSCAPE ARCHITECT: C-4 OVERALL UTILITY PLAN 6 SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSENGINEER AFFIRMATION STATEMENT LIGHT & POWER: C-77 C-8 EROSION AND SEDIMENT CONTROL PLAN8 C-9 DETAIL SHEET 19 C-10 DETAIL SHEET 210 C-11 DETAIL SHEET 311 C-12 DETAIL SHEET 412 DETAIL SHEET 5 PRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL C-1313 EXISTING CONDITIONS AND DEMOLITION PLAN C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_CV.dwg, 1/11/2022 9:11:42 AM STANDARD GENERAL NOTESC-2 2 “” STANDARD GENERAL NOTES Know what's below. before you dig.Call R STANDARD GENERAL NOTES (CONTINUED) STANDARD GRADING AND EROSION AND SEDIMENT CONTROL NOTES “” “” “” STREET IMPROVEMENT NOTES TRAFFIC SIGNING AND PAVEMENT MARKING NOTES STORM DRAINAGE NOTES WATERLINE NOTE “” SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSPRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_CV.dwg, 1/11/2022 9:11:50 AM LOT 7 TRACT A P0UDRE VALLEY PLAZA P.U.D.PRIVATE ACCESSDRIVELOT 6 EXISTING BUILDING EXISTING RETENTION POND EXISTING TRASH ENCLOSURE ARBOR DRIVE JLB 3 EXISTING CONDITIONS AND DEMOLITION PLANC-3 Know what's below. before you dig.Call R LEGEND OF SYMBOLS SURVEY NOTES: SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSPRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_DM.dwg, 1/11/2022 9:11:31 AM TRACT A P0UDRE VALLEY PLAZA P.U.D. ARBOR DRIVE T EPRIVATE ACCESSDRIVELOT 7 LOT 6 EXISTING BUILDING EXISTING RETENTION POND EXISTING TRASH ENCLOSURE PROPOSED BUILDING FF = 5083.70 PROPOSED BUILDING FF = 5082.45 JLB 4 HORIZONTAL CONTROL PLANC-4 NOTES Know what's below. before you dig.Call R LEGEND OF SYMBOLS SURVEY NOTES: SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSPRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_HC.dwg, 1/11/2022 9:12:19 AM TRACT A P0UDRE VALLEY PLAZA P.U.D. ARBOR DRIVE (54' R/W) T EPRIVATE ACCESSDRIVEPROPOSED BUILDING FF = 5083.70 LOT 6 EXISTING BUILDING EXISTING RETENTION POND EXISTING TRASH ENCLOSURE LOT 7 PROPOSED BUILDING FF = 5082.45 NORTH RIGHT-OF-WAY FOR ARBOR DRIVE 30 LF 3 4" TYPE K COPPER IRRIG. SERVICE 23 LF 1" TYPE K COPPER JLB 5 OVERALL UTILTY PLANC-5 NOTES Know what's below. before you dig.Call R LEGEND OF SYMBOLS SURVEY NOTES: SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSPRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_UT.dwg, 1/11/2022 9:12:04 AM TRACT A P0UDRE VALLEY PLAZA P.U.D. ARBOR DRIVE T EPRIVATE ACCESSDRIVEPROPOSED BUILDING FF = 5083.70 LOT 6 EXISTING BUILDING EXISTING RETENTION POND EXISTING TRASH ENCLOSURE PROPOSED BUILDING FF = 5082.45 LOT 7 WQEL=5086.15; EMERG. CREST AT 5086.15 5083 5083 508350815082 5082 5083 5083 5083WQEL=5082.33; OVERFLOW AT 5082.43 WQEL=5086.15; EMERG. CREST AT 5086.15 JLB 6 FINAL GRADING PLANC-6 NOTES Know what's below. before you dig.Call R LEGEND OF SYMBOLS SURVEY NOTES: SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSPRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_GR.dwg, 1/11/2022 9:12:34 AM TRACT A P0UDRE VALLEY PLAZA P.U.D. ARBOR DRIVEPRIVATE ACCESSDRIVELOT 6 EXISTING BUILDING EXISTING RETENTION POND EXISTING TRASH ENCLOSURE PROPOSED BUILDING FF = 5082.45 LOT 7 WQEL=5086.15; EMERG. CREST AT 5086.15; V = 141 CU.FT.WQEL=5086.15; EMERG. CREST AT 5086.15; V = 148 CU.FT. WQ OVERFLOW AT 5082.43; V = 182 CU.FT. 5083 5083 50815082 PROPOSED BUILDING FF = 5083.70 JLB 7 FINAL DRAINAGE PLANC-7 NOTES Know what's below. before you dig.Call R LEGEND OF SYMBOLS SURVEY NOTES: SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSPRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 BASIN RUNOFF SUMMARY WATER QUALITY SUMMARY C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_DR.dwg, 1/11/2022 9:12:49 AM TRACT A P0UDRE VALLEY PLAZA P.U.D. ARBOR DRIVE T EPRIVATE ACCESSDRIVEPROPOSED BUILDING FF = 5083.70 LOT 6 EXISTING BUILDING EXISTING RETENTION POND EXISTING TRASH ENCLOSURE PROPOSED BUILDING FF = 5082.45 LOT 7 INITIAL INTERIM INITIAL INITIAL INTERIM INITIAL INITIAL INITIAL INITIAL INITIAL INITIAL INITIAL INITIAL INITIAL INITIAL INITIAL INITIAL INITIAL INITIAL WQEL=5086.15; EMERG. CREST AT 5086.15 WQEL=5086.15; EMERG. CREST AT 5086.15 WQ OVERFLOW AT 5082.43 5083 5083 50815082 INITIAL JLB 8 EROSION AND SEDIMENT CONTROL PLANC-8Know what's below. before you dig.Call R LEGEND OF SYMBOLS SURVEY NOTES: SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSPRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 TENTATIVE CONSTRUCTION SCHEDULE NOTES EROSON CONTROL TABLE C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_EC.dwg, 1/11/2022 9:13:04 AM C-9 Know what's below. before you dig.Call R SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSPRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_DT.dwg, 1/11/2022 9:13:19 AM C-10 Know what's below. before you dig.Call R SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSPRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_DT.dwg, 1/11/2022 9:13:30 AM C-11 Know what's below. before you dig.Call R SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSPRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_DT.dwg, 1/11/2022 9:13:40 AM C-12 Know what's below. before you dig.Call R SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSPRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_DT.dwg, 1/11/2022 9:13:50 AM C-13 Know what's below. before you dig.Call R SHEET OF SHEETSPOUDRE VALLEY PLAZA MIXED USEFINAL DEVELOPMENT PLANCITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADONORTHWEST 1/4, SECTION 35, TOWNSHIP 7 NORTH, RANGE 69 WEST13UTILITY PLANSPRELIMINARY NOT FOR CONSTRUCTION 01/12/2022 SPILL CURB & GUTTER 6" 6" 12" 6" 1" 2" R 1 1/2" R 18" CATCH CURB & GUTTER 18" 12" 9" 18" R7-8 R7-8P C:\Users\troy\Dropbox\I2\Projects\1024-3 PVP\DWG\Sheets\PVP_DT.dwg, 1/11/2022 9:14:05 AM