HomeMy WebLinkAboutGUARDIAN SELF STORAGE - FDP210018 - DOCUMENT MARKUPS - ROUND 4 - UTILITY PLANS (4)A Westrian Company29,825 GSF
EEE
E
E
A Westrian Company1. SANITARY SEWER SERVICE TO BE WRAPPED 10-FT EACH SIDE OF CROSSING.
2. ALL STORM DRAIN PIPES CONSTRUCTED IN OUR NEAR GROUNDWATER WILL REQUIRE GASKETED JOINTS
3. CONNECT TO EXISTING HERCP BY REMOVING AND REPLACING LAST SECTION OF EXISTING STORM PIPE.
CONCRETE COLLAR MAY BE REQUIRED IF JOINTS DO NOT SEAL WELL.
DP04 (PRIVATE)
STA 0+00.00 TO 0+92.75
DP01 (PUBLIC)
STA 0+00.00 TO 6+00.00 EEEEHEADWALL PROFILE
STA 0+00.00 TO 0+25.91
A Westrian Company