HomeMy WebLinkAboutGUARDIAN SELF STORAGE - FDP210018 - DOCUMENT MARKUPS - ROUND 4 - UTILITY PLANS (3)Update
JR RESPONSE COMPLETED
JR RESPONSE COMPLETED
Add patching limits
for storm drain
JR RESPONSE COMPLETED
Upon further review,the City requires that riprap is
12-min (d50) minimum. So please use Type M.
calcs show 27.8-ft
of riprap length.
27.8 ft
show TCE on this
plan
JR RESPONSE COMPLETED
JR RESPONSE COMPLETED
JR RESPONSE COMPLETED
label wetlands
show TCE here
Type M
JR RESPONSE COMPLETED
JR RESPONSE COMPLETED
JR RESPONSE COMPLETED
use type M
Concrete collar
may be required if
joints do not seat
well.
See note 3
Show TCEJR RESPONSE COMPLETED
JR RESPONSE COMPLETED
JR RESPONSE COMPLETED
JR RESPONSE COMPLETED
do you know the vertical location of
this existing waterline?
Please add to profile
8.8 ft
would like to see 10-ft
(min) from center of MH
to water main.
JR RESPONSE COMPLETED,
MANHOLE MOVED
JR RESPONSE COMPLETED,
WATERLINE CROSSING ADDED
TO PROFILE. THE EXISTING
WATERLINE DEPTH WAS
ASSUMED AND A LOWERING
PROPOSED.
use type M
JR RESPONSE COMPLETED
Minimum size allowable in Fort Collins is 12-
inch or Type M
JR RESPONSE COMPLETED