Loading...
HomeMy WebLinkAboutWEST FOSSIL CREEK PUD, FIRST FILING, PACE WAREHOUSE - PRELIMINARY - 61-88, D - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTc 0 0 INC Engineering Consultants 2900 South College Avenue Fort Collins, Colorado 80525 303/226-4955 November 23, 1988 Mr. Glen Schlueter Storm Drainage Department City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 RE: PRELIMINARY DRAINAGE REPORT FOR THE PACE MEMBERSHIP WAREHOUSE Dear Glen: The Pace Membership Warehouse site is located 3/4 miles south of Harmony Road on the west side of U.S. Highway 287 in Larimer County, Colorado (see the following Vicinity Map). Annexation will soon bring this site within the City of Fort Collins. More specifically this site is located in the Southeast Quarter of Section 2, Township 6 North, Range 69 West of the 6th Principal Meridian. This property is currently undeveloped, mildly sloping land covered with natural grasses. Two drainage swales drain through this site. Both from 24" pipes that are located under the Bur- lington Northern Railroad just west of the property. One of the swales is located about in the middle of this property while the other is very close to the north property line. The general drainage direction of this site is to the southeast and is col- lected by Fossil Creek some 200 feet east of this site's SE corner. This drainage basin is explained in the Fossil Creek Drainage Basin Master Drainageway Planning Study, by Simons, Li and Associates, Inc., August 1982. Due to the sites proximity to Fossil Creek, the City storm drainage staff stated, during con- ceptual review, that no onsite detention would be required. This is due to the belief that onsite flows would peak much earlier than the upstream basin flows. Other Offices: Vail, Colorado 303/476-6340 • Colorado Springs, Colorado (719) 598-4107 i Development of this property will consist of a large warehouse building and parking area. Stormwater from this site will drain towards the southeast corner where it will be collected into a storm drainage system via several inlets. Flows from the 24" pipe just west of the middle of this site will also be collected into this system. The flows will then drain to the east and directly into Fossil Creek, see attached drainage plan. The other 24" pipe that lies just west of this sites north property line is proposed to be located in a swale just north of this site and drain in an easterly direction until it finally enters its historic drainageway (see Drainage Plan). Some parking lot flows enter this drainageway. A small part of this site does not drain as explained above, this is basin "G". Flows from this area will drain directly into a local road that is just west of the Pace site. This local road, which is to be designed along with this site, will collect 100 year flows into several inlets and drain directly into the storm system. All drainage facilities will be sized during final design, as required by the City of Fort Collins, for design rainstorms to create safe passage of stormwater through the site to existing drainageways. Sincerely, RBD, Inc. Brian H. Cole, P.E. Project Engineer cc: Pete Insana Pace Membership Warehouse r VICINITY MAP k 0 Wl T it T T j 1.3 .. ............. :1. X U r ... .......... . w m I;k qlh.% if Zt ' Sig•. i' � i '' , � i-" . � 1 �\.,� 22 .19 SVC k—, X a, I 5 T -'s Ph � AT 30 ji HORSETOOTH ROAD Warren L lk. Reservoir / c1l "K HARMONY o D r7k 7 SITE LOCATIONN -4 A 16 BASIN 02 R A 2 BASIN 01--- /111,6 io.A k C-4 oil 1�0 FLAM011 IJ At 0 m N Z c) m D O m 100 YEAR DEVELOPED STORNI DRAINAGE SYSTEM PRELM,11NARY DESIGN DATA Of OuSn Ppwe IA I I I I I I I I I I I I I I I I I Flo— �me FO= I � o v —U -_ 1 - 'J. 9 1 _ 9 1 • — 3 -_ yl i 5 V12 J1 _ = Sneer P.D. I SnnM I P' Reerranaa 2 I? — C. - e .-. - r0 I i• 13 I '4 I 'S 1 `5 1 +7 I r9 I '9 20 i 2r I 22 1 2J5 ,I .. I I I I I I I i i ! I I I I I I 1 i I I I I I I I I I I I I I I I fA ;r % I I I I I I I I I I I I I I I f ! I I I I I I I I I ( I I I I I I I I I I I I I I 1 I i I I I I I I I I 10. 3 7,0I . 917.01 - 17.01 i I I I - I I I ! I I I I I I I = " Q I I ! I 1 c a c o •6'/�� t I I I I I I I I I I I I I I I I I I t I I I I I I I I I I I I Z41 Or21- 0. I t I I I• a c1. ? 'r t 5 c� L I O I I I I I I PL tN L G 1 -4 I I I I I l5C•wu Fa. I r J Figure :)- 1 TYPICAL FORM FOR STORM DRAINAGE SYSTEM PRELIMINARY DESIGN DATA (From: Wright-NicLaughlin Engineers, 1969) L� C] c� O M rb 4M 100 YEAR DEVELOPED STORM DRAINAGE Gam. �•m• � ? _ _ n ' _ _ S I -5 I 1 9 9 1 I I II.OI I I I I I I I I 1 I SYSTEM PRELIMINARY DESIGN DATA Srrser PW $n.wl 21 ' • a ? _a i ; 5 2 i i c • '! r0 I" Iv+2'I +] l u l 'S I •5 I 17 I '9 I '9 I I I I I I I I I I I I I I I I P-0 P«n✓u ' 21 1 22 1 21 00 I I ' t•y = I I 1pv bon ot O�s.v Po� 2 c ] I .: _� 20 { I 7 ID I I I I I I I I I I I I I I I I I i I I I I I I I I 1 I I I I I I I I I I I I i I I I ► I I 0 r� "• Y,>z I I�- r�/SF� I I I I I I I I I I I I I I I I I I ZS I -, 1�31 I i I I I I I I I �8-7 N.\ - .2 00 I .ot I I I I I I I I I I f I I I I I I I I I I I I-v �• 30 i ry I I I I I I I I I I I I I I I ocu S 43 I I I I I I I 1,O 1.6-N -11- l 3 O 1 I t � �� t•''i , N JT E S I I I ( I I lSC.WUJ Foy f 1-7 Figure 5-1 TYPICAL FORM FOR STORM DRAINAGE SYSTEM PRELIMINARY DESIGN DATA (From: Wright -McLaughlin Engineers, 1969) c� 0 m rn 0 Z 0 m D O M 100 YEAR DEVELOPED lw�^ of STORNI DRAHNAGE SYSTEM PRELIMINARY DESIGN DATA Svse+ P.C. Srrea� I Pro. ^ - - 4 c ^ cz 'T. 1 +0 11II 1 .JII VJI .3III III III III I II (1I II I 909 `1 2 114 PN. anu II -21 '~ ✓=J� A Vim- . ;a\te-o <- ' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 A_ I I I t I E I I I IO.Z I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I " C3 F I I I I I FL`„N FE3 I I I I I I I I I I I I e r r; N OTC ; I I I I I I I I I0 1 I z. — IZ4 I 50M� Po�G NLi OF ti� CZ-.�. 11K�\Rro�- fzE�vC 1N v TEtL F'C P� F L OvJ. TNS� Nz� It) LNAwit- - .41�-INuz4-5 t,=z �q z ov' 7. to �- = zc�. JJ r-t\Iv`1zE. S Figure 5-1 TYPICAL FORM FOR STORM DRAINAGE SYSTEM PRELIMINARY DESIGN DATA (From: Wright -McLaughlin Engineers, 1969) ISC-wu Foy 1 1-J •