HomeMy WebLinkAboutWEST FOSSIL CREEK MASTER PLAN - 61-88, C - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSITEM NO. 9
PLANNING AND ZONING BOARD MEETING OF t4ovember 71,, 7988
STAFF REPORT
PROJECT: West Fossil Creek Master Plan, #61-88C
APPLICANT: Paul Heffron
c/o Gefroh Hattman Inc.
145 West Swallow Road
Fort Collins, CO 80525
01VNER: Paul Heffron
c/o Gefroh Hattman Inc.
145 West Swallow Road
Fort Collins, CO 80525
PROJECT PLANNER: Linda Ripley
PROJECT DESCRIPTION: This is a master plan request for 56.6 acres consist-
ing of retail/commercial, industrial, office and residential uses located
on both sides of South College Avenue in the vicinity of Fossil Creek Park-
way, zoned B-P Planned Business and H-B Highway Business.
RECOMMENDATION: Approval with a condition.
EXECUTIVE SUMMARY: The intent of West Fossil Creek master plan is to
give an indication of potential land uses, to establish access as well as future
traffic circulation and to define developable land relative to environmental
concerns. West Fossil Creek is proposed to be a mixed use development
providing primarily retail/business service uses, supplemented with residential,
office and industrial land uses. The master plan shows the realignment of the
existing Fossil Creek Parkway and proposes a north/south circulation street
west of College Avenue. The site is one of the more visually diverse areas in
Fort Collins and contains several environmentally sensitive areas worthy of
preservation or mitigation.
OFFICE OF DEVELOPMENT 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6750
SERVICES, PLANNING DEPARTMENT
P & Z Meeting — November 21, 1988
Page 2
COMMENTS
1. Background:
The surrounding zoning and land uses are as follows:
N: B-P; Mill Brothers Landscape Nursery
B-L; undeveloped; proposed retail center, The Carpet Exchange
S: R-Residential (County zoning), Fossil Creek Meadows
FA -Farming & C-Commercial (County zoning), Undeveloped
E: R-Residential (County zoning), Fossil Creek Meadows
W: FA-1-Farming (County zoning), Applewood Estates
The portion of the master plan located on the east side of College Avenue
was annexed in April, 1985. The Planning and Zoning Board approved a master
plan and First Phase Preliminary, known as Fossil Creek Commercial in March
1985. No development has occurred on the property and the First Phase
Preliminary PUD has expired. The portion of the master plan located west of
College was annexed November 15, 1988. The property is scheduled to be
zoned from T Transition to B-P Planned Business and H-B Highway Business
on December 20, 1988. Cameron Park Second Filing, consisting of 18 commer-
cial lots and tracts A & B of open space, was approved in the County in 1982.
The portion of Cameron Park that has been developed along College Avenue is
not part of the master plan.
2. Land Use:
West Fossil Creek is proposed to be a mixed use development providing
primarily retail/business service uses, supplemented with residential,
office and industrial land uses. The land use mix represented on this plan
is the applicant's best estimate of development potential. As changes occur
in the market place and as development of the project continues, changes to
the land use program may be requested.
The LAND USE POLICIES PLAN describes a regional/community shopping center
as a "cluster of retail and service establishments designed to serve con-
sumer demands from the community as a whole or larger." The retail
/commercial land uses proposed for West Fossil Creek would fall under this
definition. Under the locational criteria described in the plan,
regional/community shopping centers should locate in areas easily acces-
sible to residential areas, near transportation facilities that can offer
the required access without exceeding the capacity of the existing trans-
portation network, where they can be served by public transportation and in
areas served by existing water and sewer facilities. The master plan site
addresses these locational criteria. Industrial/business park land uses at
this location is also supported by the LAND USE POLICIES PLAN locational
criteria #60 and #61 which address transportation, access and utility
services.
0
P & Z Meeting - November 21, 1988
Page 3
3. Neighborhood Compatibility:
A neighborhood meeting was held July 26, 1988. The neighborhood's major
concerns centered around the realignment of Fossil Creek Parkway, increased
traffic and environmental impact to Fossil Creek. A summary of items dis-
cussed at the meeting is attached.
4. Design:
The master plan proposes the realignment of the existing Fossil Creek
Parkway. The new alignment intersects with College Avenue approximately 380
feet south of the existing location. The realignment will resolve concerns
about substandard radii on the existing street and will provide a better
location for signalization on College Avenue with regard to topography and
signal spacing. The internal street system is a linear local street pro-
viding access to the master plan area and linking it to properties located
to the north and south.
It is the owners' intent to work with the city to preserve and enhance
Fossil Creek as an important future greenbelt in the city. The plan shows
the future alignment of Fossil Creek Trail, part of a proposed city bike
trail linking the Poudre River to Fossil Creek. Several other areas on the
master plan have been identified by the city and the Corp of Engineers as
being environmentally sensitive and subject to preservation or mitigation.
These areas are shaded on the plan. The sensitive areas include wetlands,
existing ponds, vegetation, significant wildlife habitat, areas of steep
topography and rock outcroppings.
5. Transportation:
The proposed access and interior circulation system is in conformance with
the South College Access Plan expected to be complete in December 1988.
RECOMMENDATION
The land uses proposed are supported by the LAND USE POLICIES PLAN and the
proposed access and traffic circulation meets the city's objectives in
regard to South College Avenue, therefore, staff recommends approval of
West Fossil Creek Master Plan, #61-88C with the following condition:
The requested zoning of the area west of College Avenue from T Transition to
B-P Planned Business and H-B Highway Business is approved by the City
Council.
ITEM WEST FOSSIL CREEK MASTER PLAN
NUMBER 5�-88C
H.
NOTES
n1ew1 ro�.� im a+t,e. to tro i a a " o is rNa w<N .lee .r <e�t.: un< at tm un. er i,tt .,,, e a i. 1a.. ea ana wlntalwe w <ent.16°unq xAPe.n eA. a:1" P q
t—PARES, "Ill �— S. tleAP�Iwlel neign13. N'w 1 eeve epe.�u a,+t u eocu.e.,utl a tm level aam
ae [<mmercul/eua Ana++ xr.�te a AS. ,utu.e Pe F .IPnttlor wr . w<enttal 1A ^'few �+rteecbrn a < t° eevelePment c.i url,, 9 as nq, .na
6, < 13- vat s° I.
n,/Lwelane wt<r e1>trict. ury servl<e la
�I l ee vrwleae ur aewlee,ent a1 [ ....fh wtb S ,C-NA, Ia Fwsll
16.ace brsw
��i..Awr aF. 'p [ r/Ae91°w1 S#eppinq 11ege venue v.11 u + 9w .zee In to curare ,> 1', canstr m .11. not aMnelr arlec[
w o-E ate A.1 �:a]esitl. Ems« .iiw.iM.-P. Y<via.
e. .eet+ wu m eueamlwe er ceoreinat mn mu ,aJ•cent Prene <> q.
9p Sacal°gi°IF
'EGA t�TNINF.
111\ 1 .\ \ ._ APPrvv anMMit sUAM-e<ic^� pwt..ala.
11 3 \ -� - 'wsSaw=y/¢ w'®@' �w+7am<i'n�Yw [+w—1 a wa,yrwL acne
Inc PI. It aL. yx 1 .aqulet _ a..el ant [ Lr r
III s 1 / - - - _ II<I s a ,n +<y.l\fie eTcp<�'M.petall at Me < �naivian SP_4 01 ;uae
+.
"
S�
O i
byDP sm
1
hb1.
b I
EGE
LAND USE
'a[Pa.rtlAl
Matn
alw (AwrwN WrN 13551. 6.63 Acne
rk SaeaM alliq lue Set+ 9.1p, Isl: II.II kru
AST .
DARE. LAw
ss _ xw .
rcs1n
Mull/Er_rc"I
1.00 Al. u.m S.r.
SE Mull/[�rclel
O,IIe.
--- I1,MD S.F.
e.b K. --• 1O,eeB S.I.
to W, •N/K .Asa b.+
S IFF" n�rci.l
w.- S-
N 66 K. LEND 410
s. college ave.
LAND USE NOTES a• -
i t
i IT
Ir.em
ON, DF
1 ,curb °F Ile Mvne .F tre..eat °/ M
rune., ewct beunur a a.. °c e r ..
[ I
x,n°< ryetl •' • " w,..w< °r r.<1.<,1.t en .,ae w•. lel t°
. q ,�`le , w°�°.n� ° a1 �a w.+.q< e1 °°� r<:1:.1�, .>~. •
--major
a
am
PLANNING
OWNERS
mx�i.oi I
T. F1 IllEneeE.R.S. Y-93-11. ANDNGIENT
3�NIRO LEGAL DESCRIPTION
LEGAL
/ U9"i d WREI 9SWTNFn "I..o s Ro
—
- -
RR
or ao se oa'.. ]es.es iEANG"
Ms9M.lA RE T "E..1r KO
KEq)9.15F`EE�ie
TIR SRu [u
ANN SAID END
O.MIx6[A [ExAR�R.NOLE OCM60.00 00" FOL A r_ I DTO F.,
Kew ixE .xclo[ sA
1 `;�
\\ L ' \
"..<E A.'.ELxv
xe�n.s1 EE T'A..uxv� si
Lea x[ A sA -39sLr
FEETAFq OSTIE-EiAxc[xT TO 4
RCTION
by _. ° ET11 IF SAID
2: ::�B 15-00 "EAST 1115SONN 1- IFE ° [;. xw[ ox LESS.
SAID esl..lxc.
q ixE o[Ee1
AND
.i Ex.CLLO^s[
cRF[x xEwa 11.
M6
O . [oLP O,FOSSILxtRE[xF(Oexu[ AL NASPEA rLnx.
_ ]' 1 \\ `\ \ \ ♦
r _-
d 6 xNATx —1 11 WY rc
9 S 1 9 . ie.xsn SE 69[WIT OF rx
RA cEe6RxuFsixIF
TANN
w1f .
c 9. LAx Rex MO." rc SR PISE
CIIIIINGINGO TIE AST IIIE
�- \'•�s
..[. IFEIII A, A NOST
rcrA.:sr"�ne,E.Ea'sii.ie`
.11
NIEET. 'I I ARE,.
GREegGAuw]AµAq .w1 Ex[x[E III-SI v 696.4E [ENE TP E ixi q[ vAi LINE
AGO AI LAmu: x[xl[ uwlc 5%1. Aii Aie"T or vxr
r�r[aucr i>rEa�EOuTWICE «.... .... S. M.-. ix[ •E 58)
KE xe9.11- v 9A.K FEF1: TW. E SR]•i E 9o.ss FEFi:
` �\ I, 1\ EwSo s[]•q E 9% FEET: i v[[ S6]'As . i>6. u[F[ E M6.45 F
TTE
TO
IpOMoe i[Eil i E sA6'R6 ENE]
o »e : AEs xo ; ER" toE'R°.;o.. AS'[MI:°o.PAKA S 4G
11LIK.TN w 1
ryas TxE ojL
,undw�lopea�- ' - ae
0,0
�. a l
edynty RAc
I i
1
-
VICINITY PLAN
WEST FOSSIL CREEK
MASTER PLAN
9o1e
1n:70031
Ge�froh Hattmen k3c.
ArcP
Fora Collire Co.
2237335
�r Lannon
r f�L n amn nl
Iwa nw n r[
.Mr u� . .. is . rw. rrr ¢<m rxL .ararnws .ro .e rr.rn�as sa
lM 1[ 44a. tSN M'IY111L E� aflxlerls.rE wsYerinr.`R
FOSSIL RIDGE DR.
CO. ZONING -R'
/I exist ing-
r
I1
TRACT A
BUSINESS SERVICE
PHASE-11
TRACT e
\\
BU81/ESS SERVICE
\ 12,000 0
/
`10869•cr•
\PHASES
/
/
\
/ I
PROPOSED CURB CUTS IIyP.I \\
/
/
TRACT C
/
/ r
/
••
-- Mrs
�- ial[i[a•rirr r
BUSINESS SERVICE
a0.000,1
2.9221 •cn
40a- PHASE-3
-- PHASE LINE It I
FAMATED nUmI Pamo T
�Liir•
antra
� Ir�e4
1M aepaN IML rut W 6,ra,lirt aM1n « un la
�IIWra rl 4NIpMn plMl[I. M«a<,i M
a� aler rl» M lM ills bea Yet tilrlo IIMI
I or m« I W rMa. ara,x .. amu.a, mr..
`rr'r�iN. lar x«. M.t M wo.ro early M lr
ra w«ear..r f.ltrrla el ,.,,f rrl
ury»Y prt,lrwa N NM rrl»,r LIl1 Mllsl,l
It Nr
,I
I
I
M..Ma.....
%
P V..
<O
r
N
C
-Yr
I
NI
L a
py
�
rO PINN.IC SESVCE EAEENENT '• , \ \ • \\` f/YEyf7W
1 \ \ \ j I
SERVEOITTPI Iit—ir
EYlemq fRONTAO! NO EASEBENT \ •�� - -'p,;' . -
TOEE V%Ae o .'•:• \\ \ \ VICINITY PLAN
PROPOSED HIGHWAY ROW
- —�\ �1\� ----� \ EItSYIHG 100•R6W-- T .
E%IISTIMO PAVEMENT LNq—�
FOSSIL CREEK COMMERCIAL
COLLEGE/HIGHWAY 2e7 MASTER PLAN
I exist business park
I CO. TONING B' a CO. ZONING •M 1`
A, I i tln9 5i r
7CI,
AUKV) AtIT
7--
r P!A ri
L. 1
TRACT C
BUSINESS SERVICE
& ROADSIDE COMMERCIAL
40,0009f
2.33 ac.t
south
oall pl-J'A — 167
LAND USE BREAKDOWN
Overall Master Plan Gross Area: 56.64 Acres
Properties Represented:
Fossil Creek Commercial Master Plan (Approved March 1985): 6.83 Acres
Cameron Park Second Filing (Less Lots 9,10,15): 11.13 Acres
Vacant, Undeveloped, or Planned Property: 38.68 Acres
M A S T E R P L A N P A R C E L R E P R E S E 14 T A T 1 0 N S
PARCEL LAND USE APPROX. GROSS AREA DWELLING UTS DENSITY APPROX. NON-RES. REF.
FLOOR AREA NOTE
A R tail/office 6 83 AC --- --- 82 000 S.F. 1
e
B
Retail/Commercial
1.20
AC.
--- --- 15,000
S.F.
C
Retail/Commercial
3.00
AC.
--- --- 40,000
S.F.
D
Retail/Commercial
3.00
AC.
--- --- 35,000
S.F.
2
E
Office
0.80
AC.
--- --- 8,000
S.F.
F
Multi -Family HS.
5.80
AC.
70 UTS 12 UT/AC ---
3
G
Retail Commercial
Industrial
17.50
AC.
000 000 200,000
S.F.
4
H
Retail/Commercial
13.00
AC.
--- --- 150,000
S.F.
5
1
Retail/Commercial
5.51
AC.
--- --- 60,000
S.F.
6
TOTAL
56.64
AC.
70 UTS 590,000
S.F.
Gnu
GEFROH HATTIVIAN INC.
ARCHITECTS/PLANNERS
CONSTRUCTION MANAGEMENT
135 West Swallow Road
Fort Collins, CO 80525
September 6, 1988 (303) 223-7335
Ms. Linda Ripley
City of Fort Collins
Planning & Development
Box 580
Fort Col 1 i ns, Gbl
RE: WEST FOSSIL CREEK
MASTER PLAN
FORT COLLINS, COLORADO
Dear Linda:
On behalf of the owner, Paul Heffron, we respectfully submit support in-
formation and overall long term goals and objectives related to the West
Fossil Creek Master Plan.
LOCATION:
The property comprises three individual tracts and/or developments as a
single unified Master Plan. The properties are located in South Fort
Collins along US Highway 287 and consist of portions of the existing 11.12 Acres
Cameron Park (County Zoned Second Filing) Office Park Development, a 38.68
Acre undeveloped County Zoned tract to the South of Cameron Park and a
6.83 City zoned and P.U.D. approved tract on the East side of US 287 and
bi-sected by existing Fossil Creek parkway.
Existing County zoned Fossil Creek Subdivision boardered the parcels to
the East, undeveloped County zoned land lies to the South, Burlington -
Northern Railway runs North/South on the West and Mill Brothers Land-
scape Nursery lies to the North.
BACKGROUND:
Currently all of the parcels lie within the Fort Collins Urban Growth
area and are subject to the inter -governmental agreements between the
City and County. In March 1985 the 6.83 parcel known as the Fossil
Creek Commercial P.U.D. was annexed, Master Planned and approved with
a First Phase P.U.D. in accordance to the City's LDGS. No development
has occurred on the property since approved.
The existing Cameron Park Second Filing was approved in the County in
1982 and consisted of 18 commercial office lots and tracts A&B of Cam-
meron open space. Since that approval three lots (9,10,15) have been
sold and are not apart of this Master Plan Submission. The 6.83 acres
amounts to the remaining land to be included. The 38.68 Acre parcel
South of Cameron Park has existed in the County and be subject to Agri-
culture use primarily cattle grazing.
•
11
Ms. Linda Ripley
WEST FOSSIL CREEK
September 6, 1988
Page 2
APPLICANT'S GOALS AND OBJECTIVES:
The owner has the opportunity to bring three individual parcels together
as a unified overall Master Plan. The primary objective is not to plan
detailed parcels as Preliminary or Final at this time but to explore at
a Master Plan level only such important issues as future traffic patterns,
developable land with respect to environmental issues, and potential land
uses. It is the belief that actual development of the properties will
occur when market demands dictate.
Traffic Issues: Currently the City has retained private consultants to
study traffic issues South of Harmony Road. Through the Master Planning
of these parcels traffic issues such as location of intersections, pro-
posed traffic volumes with respect to land uses can be explored. Particu-
lar to this Master Plan is a proposed relocation of the existing Fossil
Creek Parkway. Currently the parkway curves and bisects the 6.83 Fossil
Creek Commercial P.U.D. The parkway way aligns with the existing en-
trance to Cameron Park. The intersection lies at a low point in the
topography along US 287. In discussions with the traffic department, it
has been determined that this intersection will become a signalized in-
tersection in the future. This low point in the topography of the land
could result in problems. The existing Fossil Creek Parkway is planned
as a City arterial. The existing curves of the parkway do not meet City
radius standards. The proposed Master Plan calls for the street to re-
align along its South boarder and intersect with College approximately
380 South of its present location. This realignment would resolve radius
concerns and establish a more desirable location for a signalized inter-
section. The parkway could continue across US 287 and serve to address
future traffic patterns West of US 287. The now bisected property would
become a more unified parcel affording the opportunity for the property
to be planned as a single parcel rather than one split by a major ar-
terial. It is the intention of the owner to master plan traffic patterns
North/South on the West side of US 287 in accordance with City traffic
goals and objectives. A link to the properties to the North is proposed
to provide for a much needed internal street system for those properties
South of the existing REA property. It is the hope of the owner that
this Master Plan will be the spur that sets the stage for the City to
accomplish this goal.
Environmental issues: A major impact on the property West of US 287 is
the existing Fossil Creek waterway which runs NE to SW through the 38±
acres. It is the intention of the owner to work with City and Federal
agencies that may have jurisdiction over Fossil Creek to perserve and
enhance the creek area as a future important greenbelt in the City.
There are several areas besides Fossil Creek which have been identi-
fied by the City and the Corp of Engineers as being sensitive areas
subject to preservation or migration. These areas are shown in a
shaded foremat of the Master Plan. Detailed study of these areas will
be completed at the time actual P.U.D. development occurs.
i
•
Ms. Linda Ripley
WEST FOSSIL CREEK
September 6, 1988
Page 3
Land Uses: An important aspect of this Master Plan is to identify po-
tential land uses and future expectations of the owner. The Master
Plan illustrates that given the surrounding land conditions and the
proximity of the property to US 287 land uses will range from multi-
family housing, business services uses, retail and commercial uses,
highway/auto related uses, and industrial uses. It should be noted
that all potential uses will be subject to the Land Development Guid-
ance and its P.U.D. approval process.
Respectfully submitted,
GEFROH HATTMAN INC.
Ja s A. Gefroh
oject Planner
kam
enc.
•
•
NEIGHBORHOOD MEETING
ITEM: West Fossil Creek Master Plan
DATE: July 26, 1988
LOCATION: Poudre Valley REA Building
APPLICANT: J. Paul Heffron
CONSULTANT: Gefroh/Hattman Inc.
QUESTIONS, CONCERNS COMMENTS:
1. Will development of Fossil Creek Parkway be in the floodway/floodplain?
Will this road construction affect existing riparian areas along the creek?
The realignment of Fossil Creek Parkway as proposed will be located
partially within the Fossil Creek floodplain. Road construction however,
will not adversely affect property outside the master planned area. More
specific information about the impact to the floodplain will be available
when a specific development proposal for the realignment is submitted. No
significant vegetation or wildlife habitat will be effected.
2. Neighborhood residents are very concerned about additional traffic on Fossil
Creek Parkway. The street is already deteriorating and the County will not
repair it. When Werner school was built traffic increased substantially, but
the school district did not take any responsibility for street upgrades or
maintenance.
The city does not have jurisdiction over the school district. Development of
West Fossil Creek should not add traffic to Fossil Creek Parkway cast of
College Avenue, since it does not connect to any streets other than those
within Fossil Creek Meadows. When development pressure eventually
requires the extension of Fossil Creek Parkway through to Lemay Avenue,
the street will have to meet city arterial design standards. It is the city's
policy that new development requiring the upgrade is responsible for
paying for it.
3. The proposed realignment of Fossil Creek Parkway is opposed by some
residents.
Fossil Creek Parkway is an important east/west connection for the city's
overall traffic circulation master plan and is designated as an arterial
street. Its importance for carrying traffic in the future requires that it be
signalized at College Avenue. The proposed new intersection with College
0 •
Avenue is a much better location for a traffic signal in terms of topogra-
phy and signal spacing.
4. How can we (residents in the County) get better traffic control in our
neighborhood such as speed limit signs, school zone signs and police
enforcement?
These are services generally required by urban level development. The city
cannot provide these services to properties outside city limits.
5. Will the architecture in the master planned area be compatible with the
architecture in Cameron Park? How tall will the buildings be? There is a
concern about blocking views of the mountains.
This question cannot be addressed adequately until a specific development
proposal is submitted. It is unlikely however, that all of the architecture in
the master plan area will be small scale buildings with similar materials
and architectural form as the buildings in Cameron Park. The city requires
special review criteria for buildings over 40 feet. Some mountain views
could be blocked by development within the master plan area. This concern
can be addressed when a specific development proposal is submitted.
6. Will this master plan address impacts on Fossil Creek in terms of storm
water run-off? Flows in both Fossil Creek and Mail Creek have increased
dramatically in the last few years, causing the banks to erode.
Normally no detention is required in the Fossil Creek Basin. This is
because the stream banks are so steep that increased flows do not cause
the stream to flood wide areas. It is true that the banks are sluffing off,
however, this is a result of the meandering character of the stream and
not necessarily a result of increased flows. The master plan drainage report
requires future development to provide two drop structures between the
railroad and College Avenue and also calls for riprap protection east of
College. The drop structures will reduce the velocity of the flow and help
to prevent further erosion.
7. How does the planning process work and what is the significance of the
zoning designations on the master plan? When will we have an opportu-
nity to see site specific development plans?
The H-B Highway business zoning district is for automobile related busi-
nesses while B-P Planned Business is for areas planned as a unit to provide
business services while still protecting surrounding residential neighbor-
hoods. When the West Fossil Creek property was annexed and zoned, the
City Council put a condition on the zoning that any development on the
property must be done as a planned unit development under the criteria of
the Land Development Guidance System. Under the LDGS the developer
may propose a wide range of land uses, however, each land use will need
to meet the criteria of the LDGS in terms of neighborhood compatibility,
existing plans and policies, public facilities and safety, resource protection,
environmental standards and site design. It is anticipated that there will be
neighborhood meetings held for each site specific development plan. You
will also be notified about the Planning and Zoning Board Hearing for
each proposed development.
8. Will there be hiker/biker trails along Fossil Creek? When will the proposed
community park at Portner reservoir be built?
Yes, the city's recently completed Parks and Recreation Master Plan shows
a trail connection from the Foothills Trail along Fossil Creek connecting to
both the Poudre River Trail and to Fossil Creek Reservoir. The West Fossil
Creek master plan shows a conceptual alignment for the trail.
The City has purchased approximately 100 acres of land, including Portner
Reservoir, with the intention of building a community park to serve
anticipated population growth in this area of the city. The park is
currently not funded and probably will not be constructed within the next
five years.
9. Single family residents in Fossil Creek Meadows are concerned about their
children needing to cross Fossil Creek Parkway, a major collector street, to
get to the subdivision playground.
The importance of Fossil Creek Parkway to move traffic will increase in
the future. It is designated as an arterial street on the city's street master
plan. Safe crossings in the future are likely to be limited to signalized
intersections.
10. The property owners immediately north of the proposed master plan area
are opposed to the north/south collector street which would adversely
effect their business property.