Loading...
HomeMy WebLinkAboutWEBERG PUD - FINAL - 76-88G - CORRESPONDENCE - STAFF'S PROJECT COMMENTSServices Planning Department June 22, 1989 Mr. Frank Vaught Vaught*Frye Architects 2900 South College Avenue Fort Collins, CO 80525 Dear Frank: • Staff has reviewed Weberg P.U.D. Final #76-86G, and has the following com- ments: 1. Tim Buchanan is evaluating the existing trees that will be removed, and will be assigning a dollar value to the trees. After we receive this information from Tim staff will make a recommendation for appropriate mitigation. 2. The extension of Fossil Creek Boulevard to the south may impact environ- mentally sensitive areas shown on the city's wildlife/wetlands map. Staff is asking the applicant to show existing vegetation and a grading plan for the extension so that staff can evaluate the impact. 3. In order to avoid conflicts with street lights and underground utilities, adjust the location of the proposed street trees as shown on the attached red -lined plan. 4. Add shrubbery and/or trees at the southeast corner of the site to soften the appearance of the water quality control berm. 5. The contours shown on the landscape plan do not agree with the contours shown on RBD's grading and drainage plan. 6. Staff is requesting additional plant material along the north and south building facades to create a layered landscape effect similar to the planting design concept used along blank building facades at Park Central. 7. The transition on Fairway Lane is inappropriate for the design speed. 8. See additional street design comments on red -lined utility plans. 9. Show easements on the site plan. 10. Locate the building envelope with dimensions to the property line. 300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 11. Add a note to the site plan indicating that the proposed connection to off -site parking is subject to approval by the City traffic engineer. 12. Indicate site lighting on the landscape plan and include a detail or cut sheet of the proposed standard and fixture. 13. An existing gas service line at 5001 South College will have to be cut off and abandoned at the developer's expense prior to development of the site. A new gas main and new gas service sized with adequate capac- ity to supply Weberg's will be installed in normal sequence in conjunc- tion with development of the site. 14. Poudre Fire Authority (PFA) has not received information on water sup- ply capability as requested. Without this information PFA cannot deter- mine if water supply will be capable of supporting fire sprinkler demands. 15. PFA needs to know storage configuration in the warehouse, to determine if additional sidewalk and/or exterior doors will be required to meet high piled storage requirements of the Fire Code. 16. Both buildings require full fire sprinkler protection. 17. Storm drainage comments regarding the drainage report and utility plans are attached for your information. These comments along with the red - lined plans have been sent to the project engineer. This concludes Staff comments at this time. Please note the following dates and let me know if there are any problems in meeting the deadlines: Plan revisions are due July 5, 1989 PMT's, colored renderings, and 10 prints are due July 17, 1989 Final documents are due July 20, 1989 As always, please call if there are any questions or concerns. Sincerely, Linda Ripley Project Planner LR/bh