HomeMy WebLinkAboutWEBERG PUD - MASTER PLAN - 76-88E - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWDeiWpment Services
Planning Department
City of Fort Collins
February 14, 1989
Frank Vaught
C/o Vaught Frye Architects
2900 South College Avenue
Fort Collins, CO 80525
Dear Mr. Vaught,
For your information, attached is a copy of the Staff's comments concerning
the Weberg's, which was presented before the Conceptual Review Team on
February 14, 1989.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
ax� -
Sherry Albertson -Clark
Senior Planer
Atta-^ Trent
SAC/bh
xc: Tom Peterson, Director of Planning
Mike Herzig, Development Coordinator
Project Planner
File
300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
CONCEPTUA!, REVIEW STAFF COMMEN715
MEETING DATE: February 13, 1989
PROJECT: Weberg's
APPLICANT: Frank Vaught, Vaught -Frye Architects, 2900 S. College Ave., Fort
Collins, CO 80525
LAND USE DATA: Request for preliminary plan for 70,000 square foot Web-
erg's furniture showroom/warehouse and 48,000 square feet of
retail/office/restaurant/warehouse, on 9.1 acres located at Fairway Lane
(extended) and College Avenue.
COMMENTS:
1. Power is east of College. There is a crossing at Fairway Lane to feed
Mills Brothers Nursery. A minimum 6' easement must be extended along
the south property line. This easement may be combined with storm drain-
age easements, for an approximate width of 20'.
2. Water and sewer is provided by the district.
3. District must be able to provide adequate water flows for fire protection.
4. Tim Buchanan, City Arborist, should be asked to evaluate existing trees on
the site.
5. Tc 1 Laµl LLii a♦L .�LLL V f ILV it V1
must be in the City limits prior to Planning and Zoning Board review of
this proposal.
6. Off -site easements must be secured for storm drainage, to get flows into
Fossil Creek, without impacting other properties on the route to the creek.
Storm drainage report/plan and grading plan will be required.
7. The plan appears to be in conformance with the South College Access Plan.
8. A traffic impact analysis will be required. May need a south -bound decel
lane. The need for a decel lane, as well as driveway locations on -site will
be evaluated, based on the traffic impact analysis.
9. Rights -of -way and easements must be shown on the plat and site plan. An
additional 15' easement along College (in addition to r-o-w) must be pro-
vided.
10. Street oversizing fees will apply.
11. Setbacks from flowline for parking spaces will need to be evaluated.
12. Staff .questions the need for two access points on Fossil Blvd. for the
service area for Weberg's.
13. Signing and striping needs to be shown on the utility plans.
14. The type of control planned for the Fossil -Fairway intersection needs to be
identified.
15. A neighborhood meeting will be required.
16. Landscape treatment should be provided along the west property line.
17. A preliminary off -site design for the extension of Fossil Blvd. should be
provided at the time of final review.