Loading...
HomeMy WebLinkAboutMONTAVA - PHASE G & IRRIGATION POND - BDR210013 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS’ “” – ’ ’ ’ — ’ “” “” “”“” – “” – – FUTURE EXTENSION OF STREETSCAPE TAPIRRIGATION PUMP STATIONDIAGRAMMATIC DISTRIBUTION LINE(DESIGNED BY OTHERS)IRRIGATION PONDPhase GPhase HPhase EPhase DPhase APhase BPhase IPhase FPhase MPhase 1CPhase LPhase CPhase 1BPhase KPhase JRegional ParkELEMENTARYSCHOOLPhase N Phase OSheet Number:Date Issued:Sheet Title:RevisionTitleDateDesigned:Drafted:Reviewed:Location: Project:WATER USE AREASFORT COLLINS, COLORADO MONTAVA IRR. MASTER PLAN1234567 HinesHinesHinesDECEMBER 10, 2021HF2M, INC. 430 N. COLLEGE AVE., SUITE 410 FORT COLLINS, COLORADO 80524 Client:3 of 70 150 300 6001"=300'NORTHWATER DEMAND BY PHASE MOUNTAIN VISTA STREETSCAPE TAPFUTURE EXTENSION OF STREETSCAPE TAPIRRIGATION PUMP STATIONDIAGRAMMATIC DISTRIBUTION LINE(DESIGNED BY OTHERS)IRRIGATION PONDM4M2M3M7M6M5M1PHASE G WATER REQUIREMENTS·HIGH-DENSITY TOWNHOME STYLE LOTS WITH MINIMAL PRIVATE LANDSCAPE·203 LOTS AT 6 GPM PER LOT·RESIDENTIAL LOT WATERING WINDOW:- 12 HOURS PER NIGHT- DIVIDED INTO THREE (3) 4-HOUR BLOCKS·PEAK SEASON FLOW RATE: 400 GPM·DELIVERY PRESSURE REQUIREMENT:-LOTS: 65 PSI- OPEN SPACE: 80 PSI-ASSUMES NO RPA WILL BE REQUIREDOPEN SPACE METERSMAX FLOW: 50 GPM REQ. PRESSURE: 75 PSIM1M2M3M4M5M6MAX FLOW: 50 GPM REQ. PRESSURE: 75 PSIMAX FLOW: 100 GPM REQ. PRESSURE: 75 PSIMAX FLOW: 1,200 GPM REQ. PRESSURE: 75 PSIMAX FLOW: 100 GPM REQ. PRESSURE: 75 PSIMAX FLOW: 100 GPM REQ. PRESSURE: 75 PSIMAX FLOW: 25 GPM REQ. PRESSURE: 75 PSIM7PHASE E WATER REQUIREMENTS·MULTI-FAMILY BLOCKS WITH SHARED LANDSCAPE·20% OF LOTS WILL RECIEVE 6 GPM·EACH MF BULDING REQUIRES 25 GPM·ASSUMED WATERING WINDOW:- 12 HOURS PER NIGHT·PEAK SEASON MF FLOW RATE: 450 GPM·DELIVERY PRESSURE REQUIREMENT:- LOTS: 65 PSI- OPEN SPACE: 80 PSI-ASSUMES NO RPA WILL BE REQUIRED075150 3001"=150'NORTHSheet Number:Date Issued:Sheet Title:RevisionTitleDateDesigned:Drafted:Reviewed:Location: Project:WATER USE AREAENLARGEMENTFORT COLLINS, COLORADO MONTAVA IRR. MASTER PLAN1234567 HinesHinesHinesDECEMBER 10, 2021HF2M, INC. 430 N. COLLEGE AVE., SUITE 410 FORT COLLINS, COLORADO 80524 Client:4 of 7Regional ParkPhase GPhase H(Future)Phase EPhase D(Future)Phase F(Future)Phase I(Future)