HomeMy WebLinkAboutHOWES SIX TWO NINE - FDP210025 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORT Final Drainage and Erosion Control Report for Howes Six Two Nine Fort Collins, Colorado December 7, 2021 Prepared for: Carlson Land Development Blake Carlson 14570 Clay St. Broomfield, CO 80023 Prepared by: 301 N. Howes St. Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 1590-002 This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is necessary, we recommend double-sided printing. December 7, 2021 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: Preliminary Drainage and Erosion Control Report for Howes Six Two Nine Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies the combined Preliminary & Final Plan submittal for the proposed Howes Six Two Nine Development. This report has been prepared in accordance with the Fort Collins Stormwater Criteria Manual (FCSCM) and serves to document the stormwater impacts associated with the proposed Howes Six Two Nine project. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, Northern Engineering Services, Inc. Austin Snow, PE Danny Weber, PE Project Engineer Project Manager Compliance Statement: I hereby attest that this report for preliminary drainage design for Howes Six Tow Nine was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins Stormwater Criteria Manual. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others. Howes Six Two Nine Preliminary Drainage Report December 7, 2021 Carlson Development Table of Contents Table of Contents I. General Location and Description ........................................................................ 1 II. Drainage Basins and Sub-Basins .......................................................................... 3 III. Drainage Design Criteria ..................................................................................... 4 IV. Drainage Facility Design ..................................................................................... 7 V. Conclusions ......................................................................................................... 9 VI. References ......................................................................................................... 11 Tables and Figures Figure 1 – Vicinity Map .............................................................................................. 1 Figure 2 – Aerial Photograph ..................................................................................... 2 Figure 3 – FEMA Firmette (Map Number 08069C0979H) .......................................... 3 Appendices Appendix A – Hydrologic Computations Appendix B – Hydraulic Computations Appendix C – Water Quality/Lid Design Computations Appendix D – Erosion Control Report Appendix E – USDA Soils Report Map Pocket DR1 – Drainage Exhibit Howes Six Two Nine Preliminary Drainage Report December 7, 2021 Carlson Development Page 1 of 12 I. General Location and Description A. Location 1. Vicinity Map Figure 1 – Vicinity Map 2. The Howes Six Two Nine project site is located within the North half of Lot 2 and the South half of Lot 3 of Block 93 of the Harrison subdivision, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site (refer to Figure 1) is bordered on the North and South by parking lots for multifamily residences; to the West by an inverted-crown alleyway; to the East by the public right-of-way for South Howes. B. Description of Property 1. The Howes Six Two Nine development is comprised of ±0.43 acres. Howes Six Two Nine Preliminary Drainage Report December 7, 2021 Carlson Development Page 2 of 12 2. The site is currently occupied by one two-story brick building planned to remain, a garage adjacent the alleyway which is planned for removal, as well as various concrete sidewalk and pavers, and an approximately 4240 square-foot asphalt parking area connected to the alley. Figure 2 – Aerial Photograph 3. The existing groundcover consists of grasses, concrete, pavers, asphalt, and the existing structures’ rooftops. The existing on-site runoff generally drains Westward into the inverted crown alleyway and Eastward to South Howes on shallow grades (e.g., <2.00%). From there, the drainage follows existing City of Fort Collins stormwater infrastructure. 4. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey website: (http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx), the site consists primarily of Fort Collins loam (Hydrologic Soil Group C). 5. The proposed development will consist of one multifamily building consisting of seven apartment units. Other proposed improvements include: an enlarged asphalt parking lot, walkways and a courtyard, and landscaping. Howes Six Two Nine Preliminary Drainage Report December 7, 2021 Carlson Development Page 3 of 12 6. The project site is located in the Campus North sub-district of the Downtown District. The proposed use (Multi-family, 8-units or less/building) is an approved use in the Downtown District, subject to Type 1 Administrative Review. 7. No significant offsite flows are directed into the site. Off-site flows are prevented from entering the site by existing topography. 8. The site is not required to provide on-site detention as it is located in the Old Town Basin and is increasing total impervious area by less than 5,000 square feet. Additionally, the standard water quality requirement for this site has been provided for in the City’s Udall water quality facility. This site will meet the City’s on-site LID treatment requirements via a bioswale included in the design. C. Floodplain 1. The subject property is not located in a FEMA or City regulatory floodplain according to FEMA Firm No. 08069C0979H, effective on 05/02/2012. 2. Figure 3 – Existing Floodplain(s) II. Drainage Basins and Sub-Basins A. Major Basin Description Howes Six Two Nine is located within the City of Fort Collins Old Town major drainage basin. Specifically, the project site is situated in the lower center of this Howes Six Two Nine Preliminary Drainage Report December 7, 2021 Carlson Development Page 4 of 12 major drainage basin. This basin is located in north-central Fort Collins and has a drainage area of approximately 2,120 acres. The entire basin is urbanized and generally drains from west to east. Most of the water from the Old Town basin drains to the Poudre River, just to the east. B. Sub-Basin Description 1. The outfall for the project site is the Cache la Poudre River, to the east. 2. The subject site can be defined with three (3) historical sub-basins that encompass the entire project site. 3. The existing site runoff drains to four different places, including the alley to the west, the parking lot to the north of the site, low areas within the site itself, or east to the Howes gutter. 4. The project site does not receive notable runoff from off-site properties. III. Drainage Design Criteria A. Optional Provisions There are no optional provisions outside of the FCSCM proposed with the Howes Six Two Nine project. B. Stormwater Management Strategy The overall stormwater management strategy employed with the Howes Six Two Nine project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices. The first consideration taken in trying to reduce the stormwater impacts of this development is the site selection itself. By choosing an already developed site with public storm sewer currently in place, the burden is significantly less than developing a vacant parcel absent of any infrastructure. The Howes Six Two Nine project aims to reduce runoff peaks, volumes and pollutant loads from frequently occurring storm events (i.e., water quality (i.e., 80th percentile) and 2-year storm events) by implementing Low Impact Development (LID) strategies. Wherever practical, runoff will be routed across landscaped areas or through an infiltration gallery. These LID practices reduce the overall amount of impervious area, while at the same time Minimizing Directly Connected Impervious Areas (MDCIA). The combined LID/MDCIA techniques will be implemented, where Howes Six Two Nine Preliminary Drainage Report December 7, 2021 Carlson Development Page 5 of 12 practical, throughout the development, thereby slowing runoff and increasing opportunities for infiltration. Step 2 – Implement BMPs that Provide a Water Quality Capture Volume (WQCV) with Slow Release. The efforts taken in Step 1 will help to minimize excess runoff from frequently occurring storm events; however, urban development of this intensity will still have stormwater runoff leaving the site. The standard water quality treatment will occur off-site at the City’s Udall Water Quality facility. Step 3 – Stabilize Drainageways. The project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve Citywide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically applies to industrial and commercial developments. C. Development Criteria Reference and Constraints 1. The subject property is part of the Old Town basin drainage master plan. 2. The site plan is constrained on the east by a public street, on the west by an alley, and by existing development on the north and south. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure 3.4-1 of the FCSCM, serve as the source for all hydrologic computations associated with the development. Tabulated data contained in Table 3.4-1 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Chapter 3 of the FCSCM. 3. The Rational Formula-based Federal Aviation Administration (FAA) procedure has not been utilized for detention storage calculations since detention is not required for the project. 4. Two separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. Howes Six Two Nine Preliminary Drainage Report December 7, 2021 Carlson Development Page 6 of 12 E. Hydraulic Criteria 1. The drainage facilities proposed for the Howes Six Two Nine project are designed in accordance with criteria outlined in the FCSCM and/or the Mile High Flood District’s (MHFD) Urban Storm Drainage Criteria Manual. 2. As stated in Section I.C.1, above, the subject property is not located in any FEMA or City floodplains. F. Floodplain Regulations Compliance 1. As previously mentioned, this project is not subject to any floodplain regulations. G. Modifications of Criteria No formal modifications are requested at this time. Quantity detention is required in the Old Town Basin if the site increases impervious area by greater than 5000 square feet. This site does not exceed/trigger this requirement. H. Conformance with Water Quality Treatment Criteria City Code requires that 100% of runoff from a project site receive some sort of water quality treatment. As per staff guidance, his project will utilize the Udall water quality facility to provide standard water quality treatment for the site. Additionally, the site will feature LID treatment for at least the required treatment area. Due to the physical constraints associated with a project of this nature/size and the prohibition of providing water quality facilities within the public right-of-way, there are some small, narrow areas around the perimeter of the project that cannot be captured. The uncaptured areas tend to be narrow strips of landscaped area between the property line and buildings or curbs. While these small areas will not receive formal water quality treatment, most areas will still see some treatment as runoff is directed across through the landscaped areas or LID system before outletting to the storm sewer off-site. I. Conformance with Low Impact Development (LID) The project site will conform with the requirement to treat a minimum of 75% of the project site using a LID technique. Please see Appendix C for LID design information, table, and exhibit(s). As shown in the LID table provided in the appendix, 86.4% of the proposed site impervious area will receive LID treatment, which exceeds the minimum required. Howes Six Two Nine Preliminary Drainage Report December 7, 2021 Carlson Development Page 7 of 12 J. Sizing of LID Facilities Bioswale 1. The bioswale was sized by first determining the required treatment area for the system (75% of new/modified impervious area). New and modified impervious area equals approximately 11,591 square feet, so the required treatment area equals approximately 8,693 square feet. 2. After preliminary placement was identified, the contributing area was delineated in order to determine if the treatment area requirement in 1, above, was being met. The treatment area, as designed, equals 8,836 square feet, or 76.2% of the new & modified impervious area. 3. Once it was determined that the treatment area requirement was met, the bioswale was sized using the method described in UDFCD/MHFD Treatment BMP Fact Sheet T-03, referenced in Appendix C (LID Implementation Manual) of the FCSCM. A modification was applied to this sizing method: the requirement for storage of 120% of the WQCV as per the FCSCM. The sizing worksheet is included in the Appendices of this report. 4. A volume calculation utilizing the contributing area flow rate into the bioswale and the calculated release rate through the filter area was completed as per Fact Sheet T-03. IV. Drainage Facility Design A. General Concept 1. The main objective of the Howes Six Two Nine drainage design is to maintain existing drainage patterns, while not adversely impacting adjacent properties. 2. No notable off-site runoff passes directly through the project site. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. Drainage for the project site has been analyzed using thirteen (13) drainage sub- basins, designated as sub-basins A through G and H-C. The drainage patterns anticipated for the basins are further described below. Sub-Basin A Sub-basin A encompasses approximately 4.5% the total site area. This sub-basin is comprised primarily of asphalt parking/drive and landscaped area. The sub- basin will drain to the alley located along the west property line and be captured Howes Six Two Nine Preliminary Drainage Report December 7, 2021 Carlson Development Page 8 of 12 by an area drain which will then convey runoff from the basin through the storm drain system off-site. Historically, approximately 360 square feet of impervious area drains to the alley. The proposed development will increase the impervious area draining to the alley by 262 square feet to approximately 622 square feet. Since the increase is less than 350 square feet, as per City staff, drainage analysis of the alley’s conveyance is not required. Sub-Basin B Sub-basin B encompasses approximately 40.6% the total site area. This sub-basin is comprised primarily of roof area, concrete flatwork, an asphalt parking lot, and landscaped area. Flows for the sub-basin will drain to a curb-cut in the southeast corner of the parking lot that flows into Sub-Basin F and the LID system. Sub-Basin C Sub-basin C encompasses approximately 21.4% the total site area. This sub-basin is comprised primarily of roof area, concrete flatwork and landscaped areas. The sub-basin will sheet flow to a trench drain, which will then convey flows to an area inlet leading to the off-site storm sewer in Howes. Sub-Basin D Sub-basin D encompasses approximately 2.3% the total site area. This sub-basin is comprised primarily of landscaped area and roof area. Flows from the sub- basin will flow to an area inlet which will convey runoff from the basin into the off-site storm sewer. Sub-Basin E Sub-basin E encompasses approximately 16.5% the total site area. This sub-basin is comprised primarily of roof area. Flows from the sub-basin will flow via gutters into Sub-Basin F and the LID system. Sub-Basin F Sub-basin F encompasses approximately 8.2% the total site area. This sub-basin is comprised primarily of landscaped area. Flows from the sub-basin will enter the LID system (bioswale) which has been designed to capture the major flows from the contributing area and features an underdrain conveying flows to the off-site storm sewer in Howes. An area drain is also featured to collect flows greater than the major event. Since this Sub-Basin receives flows from multiple other Sub- Basins, it has been designed to overflow into the Sub-Basin D outlet, an area inlet that leads directly to the off-site storm sewer, in case of a long-return period event or clogging in the LID system. Sub-Basin G Howes Six Two Nine Preliminary Drainage Report December 7, 2021 Carlson Development Page 9 of 12 Sub-basin G encompasses approximately 6.2% the total site area. This sub-basin is comprised primarily of roof area, concrete flatwork and landscaped areas. Flows from this sub-basin cannot be captured due to existing topography at the property boundary and will flow off-site to the parking lot to the north or the gutter in Howes, following historical drainage patterns. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details 1. Since detention is not required with this site, the existing impervious area has not been considered in determining allowable release from the property. 2. An allowable release rate was not determined for this project due to an increase in impervious area less than 5,000 square feet from historical. 3. The FAA method was not used to size the on-site detention volume for quantity detention since detention is not required. 4. Storm infrastructure was sized to the major event flows from contributing areas as per the FCSCM. V. Conclusions A. Compliance with Standards 1. The design elements comply without variation and meet all LID requirements. 2. The drainage design proposed with the Howes Six Two Nine project complies with the City of Fort Collins Master Drainage Plan for the Old Town Basin. 3. There are no FEMA regulatory floodplains associated with the development. 4. The drainage plan and stormwater management measures proposed with the project are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit potential damage associated with its stormwater runoff. The project will not detain for the pervious area converted to impervious areas to release at the 2-year existing rate during the 100-year storm as per staff instruction, however, LID will be implemented to treat new impervious area. Howes Six Two Nine Preliminary Drainage Report December 7, 2021 Carlson Development Page 10 of 12 2. The development will not impact the Master Drainage Plan recommendations for the Old Town major drainage basin. Howes Six Two Nine Preliminary Drainage Report December 7, 2021 Carlson Development Page 11 of 12 VI. References City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 159, 2018, and referenced in Section 26-500 of the City of Fort Collins Municipal Code. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. Urban Storm Drainage Criteria Manual, Volumes 1-3, Mile High Flood District, Denver, Colorado, Revised April 2018. Appendix A Hydrologic Computations Project: Calc. By: Date: Description Surface Area (ft2) Percent Impervious Impervious Area ( ft2) Rooftop 2,431 90% 2,188 Concrete 1,040 100% 1,040 Asphalt 4,200 100% 4,200 Pavers - 40% - Gravel 482 40% 193 Landscaping 10,828 2% 217 Imperviousness Total 18,981 7,837 41.3% Description Surface Area (ft2) Percent Impervious Impervious Area ( ft2) Rooftop 6,300 90% 5,670 Concrete 1,497 100% 1,497 Asphalt 5,308 100% 5,308 Pavers - 40% - Gravel - 40% - Landscaping 5,876 2% 118 Imperviousness Total 18,981 12,593 66.3% 4,755 25.1% IMPERVIOUS AREA CALCULATIONS 629 Howes A. Snow July 26, 2021 Difference in Impervious Area (ft2) Developed Impervious Areas Historic Impervious Areas Runoff Coefficient1 Percent Impervious1 5,007 0.95 100% 2,052 0.95 90% 0 0.50 40% 540 0.50 40% 0 0.10 2% 11,920 0.20 2% Basin ID Basin Area (sq.ft.) Basin Area (acres) Asphalt, Concrete (sq.ft.) Asphalt, Concrete (acres)Rooftop (sq.ft.) Rooftop (acres) Pavers (sq.ft.) Pavers (acres) Lawns, Clayey Soil, Flat Slope < 2% (sq.ft.) Lawns, Clayey Soil, Flat Slope < 2% (acres) Percent Impervious C2*Cf Cf = 1.00 C5*Cf Cf = 1.00 C10*Cf Cf = 1.00 C100*Cf Cf = 1.25 H-A 1,418 0.033 202 0.005 158 0.004 0 0.000 1,058 0.02 26%0.39 0.39 0.39 0.49 H-B 17,153 0.394 4,805 0.110 1,485 0.034 540 0.012 10,862 0.25 38%0.49 0.49 0.49 0.61 H-C 409 0.009 0 0.000 409 0.009 0 0.000 0 0.00 90%0.95 0.95 0.95 1.00 Lawns and Landscaping: 2) Composite Runoff Coefficient adjusted per Table 3.2-3 of the Fort Collins Stormwater Manual (FCSM). Lawns, Clayey Soil, Flat Slope < 2% USDA SOIL TYPE: C Lawns, Sandy Soil, Flat Slope < 2%Composite Runoff Coefficient2 1) Runoff coefficients per Tables 3.2-1 & 3.2 of the FCSM. Percent impervious per Tables 4.1-2 & 4.1-3 of the FCSM. HISTORIC RUNOFF COEFFICIENT CALCULATIONS Asphalt, Concrete Rooftop Gravel Pavers 629 Howes S. Hallauer March 23, 2020 Project: Calculations By: Date: Character of Surface Streets, Parking Lots, Roofs, Alleys, and Drives: Ti = 1.87(1.1-CxCf)√L / (3√S) (Equation 3.3-2 per FCSCM) Velocity (Channelized Flow), V = (1.49/n)R2/3S1/2 (Equation 5-4 per FCSCM) Tc2 Tc10 Tc100 C2 C10 C100 I2 (in/hr) I10 (in/hr) I100 (in/hr) Q2 (cfs) Q10 (cfs) Q100 (cfs) h-a1 H-A 0.033 5.00 5.00 5.00 0.39 0.39 0.49 2.85 4.87 9.95 0.04 0.06 0.16 h-b1 H-B 0.394 5.00 5.00 5.00 0.49 0.49 0.61 2.85 4.87 9.95 0.55 0.94 2.40 h-c1 H-C 0.009 5.00 5.00 5.00 0.95 0.95 1.00 2.85 4.87 9.95 0.03 0.04 0.09 Design Point Basin Area (acres) Runoff CTc (Min) Tt = L / 60V (Equation 5-5 per FCSCM) Tc = Ti + Tt (Equation 5-3 per FCSCM) Intensity, I from Fig. 3.4.1 Fort Collins Stormwater Manual HISTORIC DIRECT RUNOFF COMPUTATIONS Intensity Flow 629 Howes S. Hallauer March 23, 2020 Project: Calculations By: Overland Flow, Time of Concentration: Channelized Flow, Time of Concentration: Date: Rational Equation: Q = CiA (Equation 6-1) 1.87 1.1 ∗ (Equation 3.3-2 per Fort Collins Stormwater Manual) Page 1 Runoff Coefficient1 Percent Impervious1 6,957 0.95 100% 6,693 0.95 90% 0 0.50 40% 0 0.50 40% 0 0.10 2% 5,270 0.20 2% Basin ID Basin Area (sq.ft.) Basin Area (acres) Asphalt, Concrete (sq.ft.) Asphalt, Concrete (acres)Rooftop (sq.ft.) Rooftop (acres) Lawns, Clayey Soil, Flat Slope < 2% (sq.ft.) Lawns, Clayey Soil, Flat Slope < 2% (acres) Percent Impervious C2*Cf Cf = 1.00 C5*Cf Cf = 1.00 C10*Cf Cf = 1.00 C100*Cf Cf = 1.25 A 862 0.020 650 0.015 0 0.000 212 0.00 76%0.77 0.77 0.77 0.96 B 7,715 0.177 4,658 0.107 1,504 0.035 1,553 0.04 78%0.80 0.80 0.80 1.00 C 4,050 0.093 1,386 0.032 1,592 0.037 1,072 0.02 70%0.75 0.75 0.75 0.94 D 443 0.010 147 0.003 0 0.000 296 0.01 35%0.45 0.45 0.45 0.56 E 3,129 0.072 0 0.000 3,129 0.072 0 0.00 90%0.95 0.95 0.95 1.00 F 1,551 0.036 0 0.000 0 0.000 1,551 0.04 2%0.20 0.20 0.20 0.25 G 1,170 0.027 116 0.003 468 0.011 586 0.01 47%0.57 0.57 0.57 0.72 DEVELOPED RUNOFF COEFFICIENT CALCULATIONS Asphalt, Concrete Rooftop Gravel Pavers 629 Howes S. Hallauer October 14th, 2021 Project: Calculations By: Date: Character of Surface Streets, Parking Lots, Roofs, Alleys, and Drives: Lawns and Landscaping: 2) Composite Runoff Coefficient adjusted per Table 3.2-3 of the Fort Collins Stormwater Manual (FCSM). Lawns, Clayey Soil, Flat Slope < 2% USDA SOIL TYPE: C Lawns, Sandy Soil, Flat Slope < 2%Composite Runoff Coefficient2 1) Runoff coefficients per Tables 3.2-1 & 3.2 of the FCSM. Percent impervious per Tables 4.1-2 & 4.1-3 of the FCSM. Ti = 1.87(1.1-CxCf)√L / (3√S) (Equation 3.3-2 per FCSCM) Velocity (Channelized Flow), V = (1.49/n)R2/3S1/2 (Equation 5-4 per FCSCM) Tc2 Tc10 Tc100 C2 C10 C100 I2 (in/hr) I10 (in/hr) I100 (in/hr) Q2 (cfs) Q10 (cfs) Q100 (cfs) a A 0.020 5.00 5.00 5.00 0.77 0.77 0.96 2.85 4.87 9.95 0.04 0.07 0.19 b B 0.177 5.00 5.00 5.00 0.80 0.80 1.00 2.85 4.87 9.95 0.40 0.69 1.76 c C 0.093 5.00 5.00 5.00 0.75 0.75 0.94 2.85 4.87 9.95 0.20 0.34 0.87 d D 0.010 5.00 5.00 5.00 0.45 0.45 0.56 2.85 4.87 9.95 0.01 0.02 0.06 e E 0.072 5.00 5.00 5.00 0.95 0.95 1.00 2.85 4.87 9.95 0.19 0.33 0.71 f F 0.036 5.00 5.00 5.00 0.20 0.20 0.25 2.85 4.87 9.95 0.02 0.03 0.09 g G 0.027 5.00 5.00 5.00 0.57 0.57 0.72 2.85 4.87 9.95 0.04 0.08 0.19 DEVELOPED DIRECT RUNOFF COMPUTATIONS Intensity Flow 629 Howes S. Hallauer October 14th, 2021 Project: Calculations By: Overland Flow, Time of Concentration: Channelized Flow, Time of Concentration: Date: Rational Equation: Q = CiA (Equation 6-1) Design Point Basin Area (acres) Runoff C Tt = L / 60V (Equation 5-5 per FCSCM) Tc = Ti + Tt (Equation 5-3 per FCSCM) Intensity, I from Fig. 3.4.1 Fort Collins Stormwater Manual Tc (Min) 1.87 1.1 ∗ (Equation 3.3-2 per Fort Collins Stormwater Manual) Appendix B Hydraulic Calculations Appendix C Water Quality/LID Design Computations Project: Calc. By: Date: 0.436 <-- INPUT from impervious calcs 66.30 <-- INPUT from impervious calcs 0.6630 <-- CALCULATED 12 hours <-- from UDFCD Vol. 3 Table 3-2 0.8 <-- from UDFCD Vol. 3 Table 3-2 0.207 <-- UDFCD Vol. 3 Equation 3-1 0.00754 <-- UDFCD Vol. 3 Equation 3-3 Basin Area = Basin Percent Imperviousness = Basin Imperviousness Ratio = WQCV (watershed inches) = WQCV (ac-ft) = Drain Time Coefficient = Drain Time = April 13, 2020 WATER QUALITY POND DESIGN CALCULATIONS Primary Pond Required Storage & Outlet Works 629 Howes F. Wegert Bioretention T-3 November 2015 Urban Drainage and Flood Control District B-5 Urban Storm Drainage Criteria Manual Volume 3 The following steps outline the design procedure and criteria, with Figure B-1 providing a corresponding cross-section. 2. Basin Storage Volume: Provide a storage volume based on a 12-hour drain time. Find the required WQCV (watershed inches of runoff). Using the imperviousness of the tributary area (or effective imperviousness where LID elements are used upstream), use Figure 3-2 located in Chapter 3 of this manual to determine the WQCV based on a 12-hour drain time. Calculate the design volume as follows: 𝑉 = �WQCV12�𝐴 Equation B-1 Where: V= design volume (ft3) A = area of watershed tributary to the rain garden (ft2) 3. Basin Geometry: UDFCD recommends a maximum WQCV ponding depth of 12 inches to maintain vegetation properly. Provide an inlet or other means of overflow at this elevation. Depending on the type of vegetation planted, a greater depth may be utilized to detain larger (more infrequent) events. The bottom surface of the rain garden, also referred to here as the filter area, should be flat. Sediment will reside on the filter area of the rain garden; therefore, if the filter area is too small, it may clog prematurely. If the filter area is not flat, the lowest area of the filter is more likely to clog as it will have a higher sediment loading. Increasing the filter area will reduce clogging and decrease the frequency of maintenance. Equation B-2 provides a minimum filter area allowing for some of the volume to be stored beyond the area of the filter (i.e., above the sideslopes of the rain garden). Note that the total surcharge volume provided by the design must also equal or exceed the design volume. Where needed to meet the the required volume, also consider the porosity of the media at 14 percent. Use vertical walls or slope the sides of the basin to achieve the required volume. Sideslopes should be no steeper than 4:1 (horizontal:vertical). AIAF02.0= Equation B-2 Where: AF= minimum (flat) filter area (ft2) A = area tributary to the rain garden (ft2) I = imperviousness of area tributary to the rain garden (percent expressed as a decimal) V = (WQCV/12) A WQCV = 0.207 WSI A = 12061 ft2 So, V = (0.207 in./12) * 12061 ft2 V = 208 ft3 120% = 250 ft3 Af = 0.02 A I A = 12061 ft2 I = 66.3% So, Af = 0.02(12061)(.663) Af = 159.93 ft2 Bioswale has been designed to store 250 ft3 of water (278.4 total) with a flat filter area of 160 ft2. FORT COLLINS STORMWATER CRITERIA MANUAL Water Quality (Ch. 7) 6.0 Low Impact Development 6.0 Low Impact Development Page 13 Reference: Calculating effective imperviousness and quantifying volume reduction as discussed in the 2015 UDFCD Manual, Volume 3, Section 4.0 are not allowed. The City of Fort Collins does not allow for extended detention basins to be designed using the Excess Urban Runoff Volume (EURV) and Full-Spectrum Detention method, as described in the UDFCD Manual. 6.0 Low Impact Development This Section of this Chapter presents information that is specific to the City of Fort Collins and may be a significant deviation from the information presented in the UDFCD Manuals. Utilizing UDFCD methodologies for Low Impact Development (LID) designs may not be accepted by FCU. In February 2013, Fort Collins City Council adopted Ordinance No. 152, 2012, to incorporate provisions implementing LID principles; with the goal to declare that the purpose of the City Stormwater Utility is to provide an integrated, sustainable stormwater management program that reflects the community’s values of protecting and restoring the City’s watersheds. This was subsequently modified and updated in January 2016 with Ordinance No. 007, 2016 to allow for some added flexibility in the implementation of the LID policy. Reference: Both the initial LID ordinance, Ordinance No. 152, 2012, and the subsequent ordinance, Ordinance No. 007, 2016, can be found on the City of Fort Collins website. LID is simply defined as an integrated, sustainable stormwater management program that requires a distributed, closer to the source stormwater runoff control that simulates natural processes and relies mainly on filtration and infiltration to locally treat and manage stormwater runoff. Integration of LID systems into the drainage design is required for all development projects in order to comply with the City’s policies on LID, the requirements of this Manual, the City Code and the Land Use Code. LID systems provide a higher degree of stormwater quality treatment than that provided with standard water quality design. The implementation of LID systems requires one of the following two options: 1) 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved (vehicle use) areas must be pervious. 2) 75% of all newly added or modified impervious area must be treated by LID techniques. Impervious surfaces are defined as hardscape surfaces that do not allow stormwater to infiltrate into the ground. Impervious surfaces include asphalt and concrete surfaces, concrete curbs, gutters, sidewalks, patios and rooftops. (Impervious surface areas must be assumed for single family residential lots when overall impervious areas are being determined for residential developments. The assumed areas must then be included in LID calculations.) FORT COLLINS STORMWATER CRITERIA MANUAL Water Quality (Ch. 7) 6.0 Low Impact Development 6.0 Low Impact Development Page 14 “Added” impervious area stated in the two options above is further defined as existing vegetation (or pervious) areas becoming hardscape (or impervious) areas. “Modified” impervious area stated in the two options above is further defined as existing impervious areas on an existing site being removed and replaced with other impervious surfaces through a redevelopment process (i.e. existing asphalt surface becoming a rooftop surface). Mill and overlay of asphalt areas is not considered a “modified” impervious area. “Paved” areas, as stated in option 1 above are generally considered to be private vehicle use areas only. Reference: Refer to the City of Fort Collins LID Implementation Manual in Appendix C for detailed information and requirements on LID systems. 6.1 General Requirements Included here are some general design requirements applicable for all types of LID system designs in Fort Collins. • Overall added or modified impervious areas that amount to less than 1000 square feet (< 1000 sf) on a site will not require LID system treatment for water quality. • For development sites that are adding or modifying 1000 square feet of imperviousness or more (≥ 1000 sf) are required to implement LID system treatment at the site. The LID system is allowed to treat existing imperviousness in exchange for the newly added imperviousness if the surface character is similar (e.g. existing pavement may be treated in lieu of newly added rooftop) • For single-family residential developments, LID must be placed in tracts or common areas for ownership and maintenance by the HOA. LID systems installed as part of the development requirement shall not be placed on single-family lots. • LID is not required for private, single-family residential improvement projects that are not a part of a larger subdivision project. (i.e. an existing lot in an older part of Fort Collins that is being re-built) OPTIONS FOR MEETING WATER QUALITY TREATMENT REQUIREMENTS 50% SITE TREATED WITH “STANDARD” WATER QUALITY + 50% SITE TREATED WITH LID (INCLUDING PAVERS) 100% OF SITE TREATED (REQUIREMENTS MET) OR 25% SITE TREATED WITH “STANDARD” WATER QUALITY + 75% SITE TREATED WITH LID 100% OF SITE TREATED (REQUIREMENTS MET) FORT COLLINS STORMWATER CRITERIA MANUAL Water Quality (Ch. 7) 6.0 Low Impact Development 6.0 Low Impact Development Page 15 • LID systems are not allowed to be placed in the public right-of-way to treat runoff from development sites. Stormwater runoff from development must be treated within the confines of the development and therefore cannot be treated and/or placed within a public right-of-way. Stormwater runoff generated within the public right-of-way, however, is still required to be captured and treated for water quality. • LID systems are generally required to be placed outside of a detention basin area. • LID systems may only drain to drywells if a gravity outfall for the water quality storm is not available. • LID systems are required to be sized for the entire area tributary to the LID basin (including any offsite contributing areas) • LID systems are required to be placed outside of any existing wetlands (jurisdictional and non-jurisdictional), streams or other waters of the U.S. • LID systems design must comply with the excerpts of the City of Fort Collins Landscape Design Standards and Guidelines for Stormwater and Detention Facilities, dated November 5, 2009 included as Appendix B to this Manual. 6.2 Permeable Pavement The term “permeable pavement” is a general term to describe any one of several pavement systems that allow infiltration of water into the layers below the pavement through openings within the pavement surface. Use of permeable pavements is an accepted Low Impact Development (LID) practice in Fort Collins and is often used in combination with other BMPs to provide full treatment and slow release of the WQCV. In addition, there are some installations in Fort Collins that have also been designed with an outlet control and increased depth of aggregate material in order to provide quantity detention in excess of the water quality (80th percentile) storm event. Design considerations for permeable pavement systems are presented in the LID Implementation Manual, included in Appendix C. However, there are several design parameters specified below that are also required for all permeable pavement system designs specific to meeting the LID requirements for Fort Collins. FORT COLLINS STORMWATER CRITERIA MANUAL Water Quality (Ch. 7) 6.0 Low Impact Development 6.0 Low Impact Development Page 17 6.3 Bioretention (Rain Gardens) A BMP that utilizes bioretention is an engineered, depressed landscape area designed to capture and filter or infiltrate the water quality capture volume (WQCV). BMPs that utilize bioretention are frequently referred to as rain gardens or porous landscape detention areas (PLDs). In an effort to be consistent with terms most prevalent in the stormwater industry, this document generally refers to the treatment process as “bioretention” and to the BMP as a “rain garden”. This infiltrating BMP requires consultation with a geotechnical engineer when proposed adjacent to a structure. A geotechnical engineer can assist with evaluating the suitability of soils, identifying potential impacts, and establishing minimum distances between the BMP and structures. Design and construction detailing for bioretention systems, alternatively referred to as “rain gardens” are presented in the LID Implementation Manual in Appendix C. Additionally, included in Figure 6.4-1 below are some key design parameters for rain gardens that are specific to Fort Collins. 6.4 Sand Filter A sand filter is a filtering or infiltrating BMP that consists of a surcharge zone underlain by a sand bed with an underdrain system. During a storm, accumulated runoff collects in the surcharge zone and gradually infiltrates into the underlying sand bed, filling the void spaces of the sand. The underdrain gradually dewaters the sand bed and discharges the runoff to a nearby channel, swale, storm drain or detention basin. It is similar to a BMP designed for bioretention in that it utilizes filtering, but differs in that it is not specifically designed for vegetative growth. The absence of vegetation in a sand filter allows for active maintenance at the surface of the filter, (i.e., raking for removing a layer of sediment). For this reason, sand filter criteria allows for a larger contributing area and greater depth of storage. Sand filters can also be placed in a vault. Underground sand filters have additional requirements. Design and construction detailing for sand filters are presented in the LID Implementation Manual. Included in Figure 6.4-1 below are some key design guides for sand filters. NOTES ABOUT DRYWELLS • DRYWELLS MAY BE UTILIZED AS AN OUTFALL FOR LID FACILITIES ONLY WHEN A GRAVITY OUTFALL TO THE SURFACE OR STORMWATER INFRASTRUCTURE IS NOT AVAILABLE • DRYWELLS ARE NOT ALLOWED TO BE UTILIZED AS A PRIMARY OUTFALL FOR DETENTION BASINS OR STORM PIPING SYSTEMS • INCLUSION OF A DRYWELL IN DESIGN PLANS MUST BE ACCOMPANITED BY A GEOTECHNICAL ANALYSIS AND RECOMMENDATIONS • DRYWELL AGGREGATE MATERIAL MUST EXTEND TO WELL-DRAINING SOILS AS IDENTIFIED IN A GEOTECHNICAL ANALYSIS FORT COLLINS STORMWATER CRITERIA MANUAL Water Quality (Ch. 7) 6.0 Low Impact Development 6.0 Low Impact Development Page 18 Figure 6.4-1. Design Criteria for Rain Gardens and Sand Filters 6.5 Linear Bioretention Linear bioretention has low longitudinal slopes and broad cross-sections that convey flow in a slow and shallow manner, thereby facilitating sedimentation and filtering (straining) while limiting erosion. Berms or check dams may be incorporated into the facility to reduce velocities and encourage settling and infiltration. When using berms, an underdrain system should be provided. Linear bioretention is an integral part of the LID concept and may be used as an alternative to a curb and gutter system. Design and construction detailing for linear bioretention systems are presented in the LID Implementation Manual in Appendix C. Included below are some additional design parameters that are specific to the City of Fort Collins. Figure 6.5-1. Design Criteria for Linear Bioretention LOCATION •Generally, Rain Gardens and Sand Filters shall be placed "offline" from the detention basin VOLUME •Rain Gardens and Sand Filters are sized for the WQCV •Forebay shall be included and is to be sized for 1% of the WQCV and have a minimum depth of 12" •UD-BMP workbook may be utilized for sizing •Maximum depth is 12" for Rain Gardens OVERFLOW •Area inlet or overflow required at the WQCV depth (12" above the rain garden finished grade surface) UNDERDRAINS •Underdrain piping is required •Underdrain cleanouts are required for flushing and inspection SLOPES •Minimum longitudinal slope is 0.5% •Maximum longitudinal slope is 1.0% GEOMETRY •Minimum bottom width is 24" •Maximum side slopes 4:1 2-YR STORM DESIGN •Froude No. ≤ 0.5 •Velocity ≤ 1 fps •Depth ≤ 12" X X X X X X X X X X XLID BIOSWALE EXTENTS 250 CUBIC FEET CAPACITY 7.2" MAXIMUM WATER DEPTHLID BIOSWALE BOTTOM FILTER AREA 160 SQUARE FEET IMPERMEABLE LINER SheetHOWES SIX TWO NINEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 15 ( IN FEET ) 0 1 INCH = 10 FEET 10 10 LEGEND BIOSWALE TREATMENT AREA UNTREATED AREA NOTES: 1.AREA NOT TREATED BY LID CONSISTS OF COURTYARD/WALKWAY, EXISTING ROOFTOP AREA, LANDSCAPING AND LAWNS. 2.BIOSWALE LID TREATMENT AREA CONSISTS OF ROOF AREA OF NEW BUILDING(S), THE PORTION OF THE ASPHALT PARKING AREA NOT DRAINING TO THE ALLEY, AND LANDSCAPED AREAS THAT ARE TRIBUTARY. LID1 LID EXHIBIT NA Howes Six Two Nine LID Summary Project Summary Total New/Modified Impervious Area 10,847 sf Target Treatment Percentage 75% Minimum Area to be Treated by LID Measures 8,135 sf LID - Bioswale Total Area Treated by LID 8,480 sf Percent of New/Modified Impervious Area Treated 78.2% Appendix D Erosion Control Report October 15, 2021 Erosion Control Report Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) has been included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing and/or wattles along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Final Utility Plans will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project may be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive Storm Water Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. Appendix E USDA Soils Report Soil Map—Larimer County Area, Colorado (Howes Street Project) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/16/2021 Page 1 of 3449199044920004492010449202044920304492040449199044920004492010449202044920304492040493080493090493100493110493120493130493140493150493160493170 493080 493090 493100 493110 493120 493130 493140 493150 493160 493170 40° 34' 44'' N 105° 4' 54'' W40° 34' 44'' N105° 4' 50'' W40° 34' 42'' N 105° 4' 54'' W40° 34' 42'' N 105° 4' 50'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 20 40 80 120 Feet 0 5 10 20 30 Meters Map Scale: 1:440 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 15, Jun 9, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 11, 2018—Aug 12, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—Larimer County Area, Colorado (Howes Street Project) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/16/2021 Page 2 of 3 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 35 Fort Collins loam, 0 to 3 percent slopes 0.7 100.0% Totals for Area of Interest 0.7 100.0% Soil Map—Larimer County Area, Colorado Howes Street Project Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/16/2021 Page 3 of 3 Map Unit Description The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions in this report, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named, soils that are similar to the named components, and some minor components that differ in use and management from the major soils. Most of the soils similar to the major components have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Some minor components, however, have properties and behavior characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Map Unit Description: Fort Collins loam, 0 to 3 percent slopes---Larimer County Area, Colorado Howes Street Project Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/16/2021 Page 1 of 4 Soils that have profiles that are almost alike make up a soil series. All the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of a given series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Additional information about the map units described in this report is available in other soil reports, which give properties of the soils and the limitations, capabilities, and potentials for many uses. Also, the narratives that accompany the soil reports define some of the properties included in the map unit descriptions. Larimer County Area, Colorado 35—Fort Collins loam, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 2tlnc Elevation: 4,020 to 6,730 feet Mean annual precipitation: 14 to 16 inches Mean annual air temperature: 46 to 48 degrees F Frost-free period: 135 to 160 days Map Unit Description: Fort Collins loam, 0 to 3 percent slopes---Larimer County Area, Colorado Howes Street Project Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/16/2021 Page 2 of 4 Farmland classification: Prime farmland if irrigated Map Unit Composition Fort collins and similar soils:85 percent Minor components:15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Fort Collins Setting Landform:Stream terraces, interfluves Landform position (three-dimensional):Interfluve, tread Down-slope shape:Linear Across-slope shape:Linear Parent material:Pleistocene or older alluvium and/or eolian deposits Typical profile Ap - 0 to 4 inches: loam Bt1 - 4 to 9 inches: clay loam Bt2 - 9 to 16 inches: clay loam Bk1 - 16 to 29 inches: loam Bk2 - 29 to 80 inches: loam Properties and qualities Slope:0 to 3 percent Depth to restrictive feature:More than 80 inches Drainage class:Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat):Moderately high to high (0.20 to 2.00 in/hr) Depth to water table:More than 80 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:12 percent Maximum salinity:Nonsaline to very slightly saline (0.1 to 2.0 mmhos/cm) Available water capacity:High (about 9.1 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: R067BY002CO - Loamy Plains Hydric soil rating: No Minor Components Nunn Percent of map unit:10 percent Landform:Stream terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Map Unit Description: Fort Collins loam, 0 to 3 percent slopes---Larimer County Area, Colorado Howes Street Project Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/16/2021 Page 3 of 4 Map Pocket DR1 –Drainage Exhibit FF=5004.17 FF=5004.60 FF=5005.37 ST ST ST ST STSTSTSTSTSTSTSTSTSTSTSTXXXXXXXXXX X X X X C S S C G C S C.O. C S C S W W G G D D D D STSTSTSTSTSTSTSTST ST ST STSTSTX X X X X X XEEEEEE E E E E E EEE E UD UD UD UD UD UD G G G FLATS AT THE OVAL SUBDIVISION N1 2 LOT 3, HARRISON'S ADDITION 0.02 ac. A 0.18 ac. B 0.09 ac. C 0.03 ac. G 0.01 ac. D 0.07 ac. E 0.04 ac. F a1 b1 f1 e1 c1 d1 g1 LID - BIOSWALE REQUIRED BOTTOM FILTER SURFACE AREA: 159.9 SF SURFACE AREA PROVIDED: 160 SF RIP RAP AROUND FOREBAY (1.1%)HOWES STREETALLEYSheetHOWES SIX TWO NINEThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 15 DR1 OVERALL DRAINAGE PLAN 15 NORTH ( IN FEET ) 1 inch = ft. Feet01515 15 30 45 NOTES: 1.REFER TO THE PRELIMINARY DRAINAGE REPORT FOR ADDITIONAL INFORMATION. LEGEND: FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 11 A DEVELOPED DRAINAGE SUMMARY Design Point Basin ID Total Area (acres) C2 C100 2-Yr Tc (min) 100-Yr Tc (min) Q2 (cfs) Q100 (cfs) a A 0.020 0.77 0.96 5.00 5.00 0.04 0.19 b B 0.177 0.80 1.00 5.00 5.00 0.40 1.76 c C 0.093 0.75 0.94 5.00 5.00 0.20 0.87 d D 0.010 0.45 0.56 5.00 5.00 0.01 0.06 e E 0.072 0.95 1.00 5.00 5.00 0.19 0.71 f F 0.036 0.20 0.25 5.00 5.00 0.02 0.09 g G 0.027 0.57 0.72 5.00 5.00 0.04 0.19 Howes Six Two Nine LID Summary Project Summary Total New/Modified Impervious Area 10,847 sf Target Treatment Percentage 75% Minimum Area to be Treated by LID Measures 8,135 sf LID - Bioswale New/Modified Impervious Area Treated by LID 8,480 sf Percent of New/Modified Impervious Area Treated 78.2% National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 4/16/2021 at 5:15 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 105°5'11"W 40°34'58"N 105°4'33"W 40°34'31"N Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020