HomeMy WebLinkAboutHORSETOOTH BUSINESS PARK, 1ST FILING - PRELIMINARY & FINAL - 78-88B - CORRESPONDENCE - STAFF'S PROJECT COMMENTSDevelopl&t Services
Planning Department
City of Fort Collins
February 21, 1991
Eldon Ward
C/o Cityscape Urban Design
3030 S. College, Suite 200
Fort Collins, Co 80525
Dear Eldon:
Staff has reviewed the Horsetooth Business Park PUD Master Plan and
Preliminary/Final Plans and has the following comments:
Master Plan
1. A master utility plan, showing how each of the four parcels
would receive water and sewer service, as well as treatment of
existing mains and services, should be provided.
2. The land use definitions used on the master plan should be
consistent with definitions in the LDGS (ie. "office" should be
"Business Services", etc.)
3. Note 6 refers to day care as an alternative use. Staff would
encourage you to consider this use as a primary one, rather than an
alternative land use.
4. Clarification is needed on Note 7, with respect to potential
building height exceeding the 40' limit.
5. The connection of Automation Way from the south edge of the
master plan, to Big Horn should be shown. Resolution of the name
of this street (Viewpoint or Automation) needs to occur.
6. A future potential bikeway connection should be shown along the
Bighorn alignment, to the western edge of the master plan.
7. Staff is interested in discussing the rezoning of this property
to a zone more in character with the master plan and proposed land
uses, rather than the existing residential zoning.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
Preliminary/Final Plans
1. Modifications to the existing electrical system will be at the
developer's expense.
2. There is an existing 2" gas line parallel to Elk Road west of
Viewpoint and parallel to Deer Trail that will need to be abandoned
at the developer's expense. Placement of some of the trees in the
8' utility easement adjoining the west line of Viewpoint will need
to be adjusted to provide 4' of horizontal clearance from the
existing/proposed gas line at 3' west of the west r-o-w line of
Viewpoint. The placement of the project id sign will likewise need
to be adjusted so as not to occupy space over the existing/proposed
gas line.
3. The structure appears to be large enough to require fire
sprinkler protection. Fire flow for the building is between 2000 -
3000 gpm, depending on construction type without sprinklers. Two
additional fire hydrants are needed, one to service the west end of
the building and one to serve the storage yard. Contact PFA to
discuss specific locations. The free-standing garage must be moved
away from the fence to allow access to the rear of this structure.
All fuel storage facilities must be in accordance with the Fire
Code and PFA requirements. Access lanes must be provided
throughout the storage yard. All storage of flammable liquids and
hazardous materials must be in accordance with the Fire Code.
4. Stormwater comments are as follows:
a. The purpose of the man-made wetlands needs to be defined.
b. Easements will be needed for the entire detention pond.
C. Sub -basin delineations and concentration points with flow
rates are needed.
d. Storm sewer and inlet sizing need to be shown in
calculations.
e. Erosion control needs to be addressed with more than just
notes. Details and locations are also needed.
f. See report and construction plans for further redlined
comments.
5. The following comments relate to the utility plans and plat:
a. Provide cross sections as indicated on utility plan at
Bighorn/Timberline intersection.
b. Move storm sewer out into Bighorn r-o-w.
C. Clarification of the street name is needed (Viewpoint
should be named "Automation". Viewpoint is named
"Wolverine" on the South Collins Tech Center plat).
d. See utility plans for detailed comments.
e. The usage of Tract A needs to be defined. If not a utility
easement, the 15' utility easement should continue through
the tract.
f. The angle or bearing of direction of the 30' sewer easement
needs to be shown.
g. Street r-o-w's need to be specified on the plat.
h. The new alignment of Bighorn will require a vacation.
i. First reading of street r-o-w vacations is scheduled for
the March 19, 1991 Council meeting.
j . The approval block on the plat should be changed to reflect
Planning and Zoning Board approval and signature space for
the Secretary of the Board.
6. The Commission on Disability has requested an additional two
handicapped parking stalls near the north building entry and that
an access ramp closer to the handicapped spaces at the northeast
corner of the building be added.
7. The proposed land use should be specified on the site plan.
8. Height analysis will be necessary for the microwave tower,
since it exceeds the 40' height limit. Information required for
this analysis should include a spec of the proposed tower.
9. Additional information should be provided regarding the proposed
wetlands, including the nature of materials proposed and level of
maintenance anticipated.
10. Details on proposed signage need to be provided. We would
encourage the use of directional signage on -site to be a 4 square
foot maximum.
11. Employee and customer parking should be delineated. We would
recommend the provision of additional bike racks.
12. The following landscaping comments are provided:
a. Clarify note 10 regarding "off -site" landscaping.
b. Foundation plantings should be added along the north and
east walls of the building.
C. Additional Ponderosa Pines should be provided along the
west edge of the site. We would encourage the use of a
staggered planting pattern, rather than a straight row
right against the fence.
d. Clarification is needed on the deciduous tree "QM" and
three conifers not included in the quantity listing.
e. Shrubbery should be incorporated into the arterial street
treatment along Horsetooth Road, to provide a horizontal
element.
13. Details should be provided regarding the type of light fixture
and the number and height of poles.
14. Fence materials need to be specified. We would strongly
encourage a high quality fence treatment, particularly along the
east side of the site, using upgraded materials to provide a more
visually appealing fence.
15. More detail on the use of "textured masonry block" should be
provided. We would strongly recommend the use of detailing and/or
textural treatment, as well as the proposed awning, to soften the
appearance of the proposed structure. An internally illuminated
awning would not provide a "softened" appearance.
16. Clarification is needed regarding the surface treatment of the
storage yard.
17. Clarification is needed about why the entire storage area is
within the building envelope.
18. There are several concerns and questions with respect to the
traffic impact study that need to be resolved. The study discusses
two points of access on Viewpoint, rather than two. When would
Automation be connected through to the south? How would access on
Viewpoint work (potential exists for conflicts between left turns
into this site and left turns into the property to the east)? How
would the proposed access for this site impact future development
of the sites to the east? Is there a need for three access points
on Viewpoint? What is the future need with respect to Elk Road?
Revisions addressing the comments above must be submitted as
follows:
Wednesday, March 6 - five (5) sets of site plans, landscape plans,
elevations and plat
By noon on Monday, March 18, 1991 ten (10) folded sets of the site
plan, landscape plan and elevations; a rendered site plan;
landscape plan and elevations; and an 8-1/2" x 11" PMT must be
submitted. If you have any questions, please contact me at your
convenience.
Si ely,
Sherry Alb tson-Clark AICP
Chief Plan r
cc Kerrie Ashbeck