Loading...
HomeMy WebLinkAboutHORSETOOTH-TIMBERLINE PROPERTY - MASTER PLAN - 78-88 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS• November 2. 1988 Sherry Albertson -Clark, City Planner City of Fort Collins Community Development Department P.O. Box 580 Fort Collins, CO 80522 Dear Sherry; urban design, inc. 3030 south college ave., suite 200 fort Collins, Colorado 80525 (303) 226-4074 DL NOV __ 3 �ggg Attached are three copies of the Master Plan for the Horsetooth-Timberline Property. The plans have been revised in response to Staff comments as indicated in your letter of October 17. 1988. Clarification of responses regarding site access and the public street system are as follows: - The existing public street intersection at Horsetooth Road can remain in place and be signalized in the future. The revised street system results in a redistribution of traffic accessing the neighborhood center; and our traffic consultant has indicated that the revised plan will allow a workable signalized intersection at the desired location with a single left turn bay at the Horsetooth/Timberline intersection. - The right-in/right-out east of the Union Pacific railroad tracks has been relocated to allow a short deceleration Jane to be constructed between the tracks and the access point. - The right-in/right-out on Timberline has been shifted south as requested, and will serve more than one development parcel. - We have reviewed a conceptual intersection design with Traffic Engineering, and are providing them with an amended version. Stewart and Associates are revising their master drainage and utility plans as needed. • (IVP@P@� urban design, inc. Color renderings, 8 1/2 x 11 reductions and 10 sets of prints will be submitted by November 14, and final documents by November 21, as requested. Sincerely, Eldon Ward, President Cityscape Urban Design, Inc. cc: Charles Deane