Loading...
HomeMy WebLinkAboutPOUDRE RIVER BUSINESS PARK PUD, PHASE ONE - PRELIMINARY & FINAL - 79-88A - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (2)w Citv of Fort Collins DeveAnent Services • Planning Department October 27, 1988 Ms. Wendy Irving Architecture Plus 318 East Oak Street Fort Collins, CO. 80524 Dear Ms. Irving: There are four more comments that I would like to pass on regarding the Poudre River Business Park Master Plan and P.U.D. I apologize for the late response but comments should be brought to your attention. The Water and Sewer Department reports that there is an existing 6 inch water main stubbed under Lemay Avenue. Poudre River Drive should be aligned so that the main would be under paved right-of-way. If this is not possible, a separate easement would have to be granted. The main must be chlorinated and pressure tested before it may be used. If flow is not adequate to serve the business park, the water main will have to be looped into the 12 inch main in Riverside. 2. An existing sewer main in the BNRR right-of-way may be used as an outfall for sewer service for the site. It may be necessary to use individual lift stations for each building in the business park. One large lift station will not be allowed. 3. The Traffic Study has been reviewed. There is one area where the analysis must be further refined. The length of the left turn stacking bay for cars exiting the Business Park and turning left to travel south on Lemay Avenue must be addressed. 4. Please be aware that the break in the median in Lemay is presently only 24 feet wide. With the construction of Phase One, this break must be widened to 36 feet. If the above comments need further explanation, please do not hesitate to call and I will arrange for the appropriate Staff persons to address the concerns in more detail. Sincerely, ).......... - Z Ted Shepard, � City Planner 300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750