Loading...
HomeMy WebLinkAboutPOUDRE RIVER BUSINESS PARK PUD, PHASE ONE - PRELIMINARY & FINAL - 79-88A - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSPOSITIVEIWIRONMENTS IW'..". JOE VANSANT • P.O. BO FORT COLLINS, COLORADO 80522 (303) November 3, 1988 Ted Shepard - City Planner Fort Collins, Colorado RE; Positive Environments Inc. response to comments on Poudre River Business Park Preliminary and Final P.U.D. 1-7. See engineering 8. U.S. West easement shown on drawings. 9. Up to date surveying locates the property line of Lot 1 and bike trail next to each other, With this there is no 8 ft. area unlandscaped. See A+ comments for area between Lemay Ave. and trail. Lot 1 will of course be maintained and watered. 10. River rock is used in similar areas in town for the reason to prevent paths and corner cutting. We will can change river rock to 1 1/2" rock to help prevent any injuries. 11. See engineering or A+ comments for areas outside Lot 1. property line. 12. The large trees noted next to street have been replaced with a Hathorn bush that grow quite tall and provide a vertical element. 13. A. See drawings for changes B. See drawings for changes C. The Globe Willow should do nicely. D. The Honeylocust has been change as suggested E. The Russian Olive provides the toughness and screen required for this location. 14. We have worked problems out with P.F.A. 15. See engineering 16. Hoffman Mill Road has been moved to line up with the parking lot entrance. Vertical landscaping elements have been used to work in the narrow island. See drawings for island at the entrance. Access easement and 6" curbs have been shown. Parking requirements are ample for building use. 17. See drawings for changes. 18. See drawings for added note. 19. See drawings for scaled signage elevation. There will be signage on the building at entry for directional purposes 'that has not yet been .designed. Free standing sign is for Lot 1. only.