RE: Menning Replat, BDR210004, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Menning Replat. If you have questions about any comments,
you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Todd Sullivan via phone at 970-221-6695 or via email at
tsullivan@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Todd Sullivan, 970-221-6695,tsullivan@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:05/28/2021
05/28/2021: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting processes. If you have any questions,need additional meetings with
the project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. To best serve you, please include me
in all email correspondence with other reviewers and keep me informed of any
phone conversations. Thank you!
We appreciate your assistance with the project and will keep you in the loop.
Comment Number: 2 Comment Originated:05/28/2021
05/28/2021: INFORMATION:
As part of your resubmittal, you will respond to the comments provided in this
Page 1 of 8
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable, avoiding responses like noted or acknowledged.
Gotcha.😊
Comment Number: 3 Comment Originated:05/28/2021
05/28/2021: INFORMATION:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are ready to resubmit your
plans, please notify me advanced notice as possible.
Emailed November 1 regarding our impending resubmittal.
Comment Number: 4 Comment Originated:05/28/2021
05/28/2021: INFORMATION:
Temporary Service Changes - City of Fort Collins Development Review
In order to continue providing thorough reviews and giving every project the
attention it deserves, the City of Fort Collins is implementing temporary
changes in how we serve our development customers.As you may be aware,
we are experiencing staff shortages in a number of key departments, which has
begun to impact the quality and timeliness of our reviews. We recognize that
development and construction play a critical role in our community’s vibrancy
and economic recovery, and we have been exploring options for mitigating
impacts to our customers. As a result, we will be making some temporary
service level adjustments.
Currently, one additional week of review time will be added to all 1st and 2nd
round submittals (increase from 3 weeks to 4 weeks).Lengths of subsequent
rounds of review will be considered after each round of review. Also,
Completeness Checks will be performed on all initial and Round 2 submittals
during this time. Please reach out with any questions or concerns.
We acknowledge the review time will be four weeks with this second-round submittal.
Comment Number: 5 Comment Originated:05/28/2021
05/28/2021: INFORMATION:
After further discussions related to the goals of this project, please note that
Staff's comments will reflect changes from the Draft version of comments
provided earlier.
Please reach out to me with any questions or if any clarifications are needed.
Thank you.
We appreciate all your assistance with this project.
Page 2 of 8
Department: Planning Services
Contact: Pete Wray, 970-221-6754,pwray@fcgov.com
Topic: General
Comment Number:Comment Originated: 08/09/2021
FOR APPROVAL:
Planning staff is ready for approval and after the staff review meeting if other
staff have no further issues will coordinate a decision after that date.
Thank you! We appreciate all your assistance with this project.
Department: Engineering Development Review
Contact: Dave Betley, 970-221-6573,dbetley@fcgov.com
Topic: General
Comment Number: 3 Comment Originated:05/20/2021
05/20/2021: The applicant will need to address the dedication of a nine foot
utility easement along Grant Street. Please add this to the current plat.
8/16/21: Thank you for completing the plat. Please show the 9' utility easement
adjacent to Grant Avenue on the grading plan.
The nine-foot utility easement has been included on the grading plan.
Comment Number: 4 Comment Originated:05/20/2021
05/20/2021: The utility/grading plan will need to address the location of the
sidewalk and any possible curb cuts. Will the applicant be proposing a
driveways with the proposed lots? The existing sidewalk will need to meet ADA
criteria. If any driveways are proposed, the crossings at the driveways will
need to meet ADA criteria. Any sidewalk construction or replacement will need
to be coordinated with any Landscaping requirements.
8/16/21: The sidewalk along the Grant Avenue will need to be brought up to
ADA standards, The Engineer should verify the sidewalk width and show as
being replaced if it does not meet ADA standards.The engineer will need to
verify that the sidewalk width and cross slope meet ADA criteria. The current
width does not meet ADA.
Based on ADA requirements, the Grant sidewalk shall be replaced along the entire length of this project.
Comment Number: 5 Comment Originated:05/20/2021
05/20/2021: For Information: The applicant needs to address what utilities
need to be installed and address the work performed within the right of way.
Each lot will need independent utilities to support the residence.
Each lot has independent utility services provided and proposed work shown within City right-of-way.
Comment Number: 9 Comment Originated:05/20/2021
Page 3 of 8
05/20/2021: For Information: All public sidewalk, driveways & ramps,
existing or proposed, adjacent or within the site,need to meet ADA standards.
If they currently do not, they will need to be reconstructed so that they do meet
current ADA standards as a part of this project
Based on ADA requirements, the Grant sidewalk shall be replaced along the entire length of this project. There are no
adjacent driveways or ramps associated with this project.
Comment Number: 11 Comment Originated:05/20/2021
05/20/2021: For Information: Utility plans will be required and a Development
Agreement will be recorded once the project is finalized.
Utility plans are provided with this submittal.
Comment Number: 18 Comment Originated:05/25/2021
05/25/2021: The utility easement that was reserved out of the vacation of the
alley needs to be extended to the south across the second lot and should be
shown on the plat.
Utility easement extends across both lots with updated replat.
8/16/21: The Utility Easement to be dedicated for the power poles located
towards the back of the lot will need to be shown on the grading plan. Please
keep in mind the placement of the building on the southern lot cannot be located
within the easement per City code.
Utility easement extends across both lots and is shown on grading plan.
Comment Number: 19 Comment Originated:08/17/2021
08/17/2021: FOR INFORMATION: The City has updated the Larimer County
Urban Area Street Standards as of August 1st. Please make sure that all
details or using the latest edition.
Updated LCUASS is referenced in utility plan set.
Comment Number: 20 Comment Originated:08/17/2021
08/17/2021: Please add the pertinent Larimer County details to cover the
patching in the right of way, sidewalk details and any other pertinent information
needed for the plan set. Pavement patching may need to be adjusted due to
field conditions once the plans have been approved.
Updated LCUASS is referenced, and details provided in utility plan set.
Comment Number: 21 Comment Originated:08/17/2021
08/17/2021: Please add the latest City signature block to the plan set. The
signature block can be found at https://www.fcgov.com/engineering/devrev .
City signature block is provided on cover sheet.
Comment Number: 22 Comment Originated:08/17/2021
08/17/2021: There is work being proposed within the alley. The paving
material is not being called out on the plans. Please specify the material to be
used in the working of the alley.
Page 4 of 8
The following construction note has been added to the plans, “Per Larimer County Rural Street Standards, limits of alley
disturbance shall be surfaced with a minimum of four inches of Class 5 aggregate base course (ABC) or other material
acceptable to City of Fort Collins. Gravel shall be placed on a suitable subgrade. Prior to placing gravel, subgrade shall be
reconditioned, which shall include scarifying down a minimum of the six inches, wetting or drying as necessary, and
recompacting subgrade. Subgrade material must pass a proof roll prior to placement of gravel.”
Comment Number: 23 Comment Originated:08/17/2021
08/17/2021: FOR INFORMATION: Please check with the set back
requirements for the side yards. The applicant should also coordinate with Stormwater
to determine if there is adequate room for the drainage swale along the side yard.
Side yard building setbacks are 5’. The retaining walls have been offset from the property lines to ensure construction
does not impede adjacent private property.
Comment Number: 24 Comment Originated:08/17/2021
08/17/2021: The applicant will need to enter into a Development Agreement.
The form will be provided to fill out the information.
Per email with Todd Sullivan on 9/2/21, this is no longer needed.
Department: PFA
Contact: Marcus Glasgow, 970-416-2869,marcus.glasgow@poudre-fire.org
Topic: General
Comment Number: 3 Comment Originated:05/25/2021
ADDRESS POSTING & WAYFINDING
8/12/2021: A separate walkway connection to the accessory buildings with
habitable space is not provided on the site plan.
A three-foot shared walkway will be provided from the back of sidewalk, between the two proposed buildings, and then
separate walkways will be provided to each ADUs from the side yard fence.
05/25/2021: If the habitable space above the garages will be continually occupied or utilized
as a Short-Term Rental (STR), PFA recommends separate addressing and
sidewalk connections to the accessory building habitable space entrance.
As this is a spec home and not owner-build, we do not know if future use will be STR.
Department: Technical Services
Contact: Jeff County, 970-221-6588,jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated:08/16/2021
08/16/2021: FOR FINAL APPROVAL:
Please provide the following information for the Benchmark Statement in the
EXACT format shown below.
PROJECT DATUM: NAVD88
Page 5 of 8
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM)FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM - X.XX’.
Updated benchmark statement is provided on the cover sheet and grading plan, as indicated above.
Topic: General
Comment Number: 3 Comment Originated:08/16/2021
08/16/2021: FOR FINAL APPROVAL:
We are not finding that Ordinance 25, 2021 as referenced on the Plat & Plans,
was recorded. We will need to see that it has been recorded before it can be
referenced on any of the final approved documents.
Ordinance 25, 2021 has been recorded and referenced on the documents. Please provide this information.
Topic: Plat
Comment Number: 1 Comment Originated:05/24/2021
08/16/2021: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter. If you have any specific questions about the redlines, please contact John
Von Nieda at 970-221-6565 or jvonnieda@fcgov.com
05/24/2021: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response letter.
All comments on plat have been addressed with this submittal.
Department: Light And Power
Contact: Cody Snowdon, 970-416-2306,csnowdon@fcgov.com
Page 6 of 8
Topic: General
Comment Number: 12 Comment Originated:07/27/2021
07/27/2021: FOR INFORMATION:
With this only being a replat of Lot 19 and Lot 20,Light and Power has no
concerns or comments with the submitted documents.
Excellent! Thank you, Cody.
Department: Environmental Planning
Contact: Scott Benton, (970)416-4290,sbenton@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:05/24/2021
05/24/2021: (REPEAT) No comments.
Excellent! Thank you, Scott.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341,rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated:05/21/2021
05/21/2021: If any new structures are planned the adopted codes are listed here.
A permit is required for this project and construction shall comply with adopted
codes as amended. Current adopted codes are:
2018 International Residential Code (IRC) with local amendments
2018 International Plumbing Code (IPC) as amended by the State of Colorado
2020 National Electrical Code (NEC) as amended by the State of Colorado
Copies of current City of Fort Collins code amendments can be found at fcgov.com/building.
Please read the residential permit application submittal checklist for complete requirements.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures):
· 140mph (Ultimate) exposure B or
· Front Range Gust Map published by The Structural Engineer's Association of
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code: 2018 IRC chapter 11.
INFORMATIONAL ITEMS:
· 5ft setback required from property line or provide fire rated walls & openings
for non-fire sprinkled houses per chap 3 of the IRC.3ft setback is required for
fire sprinkled houses.
· Bedroom egress windows (emergency escape openings)required in all bedrooms.
Page 7 of 8
· Prescriptive energy compliance with increased insulation values is required for
buildings using electric heat.
· A passing building air tightness (blower door)test is required for certificate of occupancy.
Applicant acknowledges the above-listed requirements associated with this project.
Page 8 of 8