Loading...
HomeMy WebLinkAboutGUARDIAN SELF STORAGE - FDP210018 - DOCUMENT MARKUPS - ROUND 3 - UTILITY PLANS (4)Please make sure this matches table in drainage report. Remove "City BFE upstream of structure..." and Provide "interpolated BFE at site 4944.8" RFPE should be 4946.3 Language should be more definitive. Area to be established to match existing conditions JR Response: Addressed Please make sure this matches table in drainage report. Remove "City BFE upstream of structure..." and Provide "interpolated BFE at site 4944.8" RFPE should be 4946.3 JR Response: Addressed Language should be more definitive. Area to be established to match existing conditions All construction and silt fences in the floodway must be breakaway unless work is happening off season (Mid October to early April). Please discuss further with floodplain staff. JR Response: Addressed Please include notes 3-7 from grading plan (sheet 7 of 36) on this drawing