Loading...
HomeMy WebLinkAboutGUARDIAN SELF STORAGE - FDP210018 - DOCUMENT MARKUPS - ROUND 3 - DRAINAGE RELATED DOCUMENTGuardian Storage Fort Collins Final Drainage Report 2 near the site. The 2019 Fossil Creek LOMR floodplain model and report have been approved and have now moved into the floodplain adoption process. This development is in compliance with Chapter 10 of the City Code which contains the floodplain regulations. The floodplain use permit will be submitted when at time of building permit application. The FEMA Elevation Certificate will be completed and approved before the CO is issued. The proposed non- residential building is intended to be constructed with a slab-on-grade foundation. The revised BFE at out outfall location was estimated to be 4945.00 (NAVD88) and the lowest floor elevation is set higher than the regulatory flood protection elevation (RFPE) at 4946.60 (NAVD88). Any item that can float such as the bike rack will be anchored to the ground. The HVAC for the building is set above the RFPE. The completion of the development meets the no-rise criteria from Chapter 10 of the City Code. See structure floodplain information table below for more details. Structure Floodplain Information Elevation (NAVD88) City BFE upstream of structure 4945.0 Interpolated BFE at site 4944.8 Regulatory flood protection elevation 4946.3 Lowest floor elevation 4946.6 HVAC elevation 4946.6 City BFE upstream of structure 4945.0Please remove this line. Without an explanation of where this is at, having two BFEs on this page creates confusion.