HomeMy WebLinkAboutFORTY-THREE PRIME - FDP210019 - SUBMITTAL DOCUMENTS - ROUND 2 - EROSION CONTROL LETTER/REPORTProject Number:1328-010 Location:Fort Collins, CO
Date:October 20, 2021 Total Acres:4.87
EROSION CONTROL MEASURE Units
Estimated
Quantity
Unit
Price
Total
Price
L.F.535 $1.50 $802.50
Construction Fence w/Rock Sock L.F.- $4.50 $0.00
each 25 $75.00 $1,875.00
Wattle Dike Inlet Protection each - $100.00 $0.00
each - $75.00 $0.00
Wattle Dike Swale Protection each 11 $100.00 $1,100.00
each 1 $300.00 $300.00
each - $150.00 $0.00
each 1 $200.00 $200.00
each 1 $75.00 $75.00
L.F.95 $1.00 $95.00
per hour - $60.00 $0.00
Sub-Total:$4,447.50
1.5 x Sub-Total:$6,671.25
Amount of security:$6,671.25
Total Acres x $1325/acre:$6,452.75
Sub-Total:$6,452.75
1.5 x Sub-Total:$9,679.13
Cost to Re-seed:$9,679.13
Minimum escrow amount:$3,000.00
Erosion Control Escrow:$9,679.13
NOTE: 'Total Acres' represents total disturbed area.
Vehicle Tracking Control Pads
Option 2 | Cost to Re-seed Disturbed acreage
Option 3 | Miniumum Escrow Amount
Final Escrow Amount
Sediment Trap
Concrete Washout Area
Rock Sock
Sawcutting Pollution Prevention
Street Sweeping and Cleaning
Option 1 | BMP Costs
Forty-Three Prime
Erosion Control Cost Estimate
Silt Fencing
Inlet Protection
Wattle Dike Curb Side Check Dam