HomeMy WebLinkAboutFOOTHILLS UNITARIAN CHURCH EXPANSION - FDP210027 - SUBMITTAL DOCUMENTS - ROUND 1 - SUPPORTING DOCUMENTATIONM 125/2600/3200/3PANEL
'M'
PANEL
'G'
'LCP'1600/3600/3200/3PANEL
'H'
N
G
175/2
150/2
PANEL
'E'
PANEL
'K'PANEL
'D'
PANEL
'F'150/3100/350/2PANEL
'DP'
SPACE SPACE SPACE SPACE
.
M
PANEL
'C'600/260/2PANEL
'E'
PANEL
'K'
PANEL
'D'
PANEL
'F'
PANEL
'A'
N
G 150/2125/2125/2175/2225/2PANEL
'EM'
GENERAL NOTES:DRAWING NOTES:
MAIN DISTRIBUTION PANEL:
- A.M.P. TYPE F -
1600A, 120/208V 3P, 4W
65k AIC, NEMA 3R
ENCLOSURE
'MDP'
UTILITY
METER
NEW UTILITY
TRANSFORMER
UPPER LEVEL
GROUND LEVEL
ELEVATOR
20HP, 60FLA
PV EQUIPMENT
1600U
600200 100125-1
#6
CU
#3/0
CU
#3/0
CU
#4
CU
#250KCMIL CU
BONDING JUMPER
ELEVATOR
CONTROL
PANEL
1
2
3
4
5
6
7
X F0
50-1
600 200
150-1
175-1
6
6
9
9
10
10
10
10
400A 400A 200A 200A
PHASE 1: SCOPE TO BE COMPLETED
PRIOR TO DEMOLITION OF EXISTING
SERVICE
SCOPE TO BE COMPLETED PRIOR
TO EXISTING SERVICE DEMOLITION
PHASE 3: NEW
CONSTRUCTION
PHASE 3: NEW CONSTRUCTION
200A3P
150A RK1
NEMA 3R
11
ROOF
X F1
X
F2
X F4
X F7 X F8
X F3
F5 X
X F6
X F9
X F10
12
12
9
13
15
14
1"C. TO METER
HOUSING
UTILITY
TRANSFORMER
UPPER LEVEL
GROUND LEVEL
6 6
6
8
8
7 7
PHASE 2: DEMOLITION OF
EXISTING SERVICE
225-1175-1125-1125-1150-1
60-1
60-1
600-1
600-1
50-1
1. ALL EQUIPMENT SHOWN IN THICK DASHED LINES IS TO BE DEMOLISHED.
2. ALL EQUIPMENT SHOWN IN THIN SOLID LINES IS EXISTING TO REMAIN.
3. ALL EQUIPMENT SHOWN IN THICK SOLID LINES IS NEW EQUIPMENT TO BE INSTALLED
PRIOR TO DEMOLITION OF THE EXISTING SERVICE.
4. SEE NOTES ON ONE-LINE DIAGRAM AND DRAWING NOTES FOR PHASING OF
CONSTRUCTION.
5. MAIN DISTRIBUTION PANEL “MDP” SHALL BE AMERICAN MIDWEST POWER TYPE F
SWITCHBOARD WITH 2 SECTIONS. SUBSTITUTIONS WILL ONLY BE CONSIDERED IF THE
DIMENSIONS ARE LESS THAN OR EQUAL TO THOSE SHOWN ON THESE PLANS.
1 PROVIDE CIRCUIT BREAKER WITH ARC ENERGY REDUCTION IN COMPLIANCE WITH NEC
240.87.
PROVIDE BUSSMAN POWER MODULE SHUNT TRIP FOR REQUIRED SELECTIVE
COORDINATION AND FIRE SAFETY INTERFACE WITH HEAT DETECTORS IN ELEVATOR
SHAFT. MIN 22K AIC RATING. COORDINATE FINAL REQUIREMENTS AND LOCATION WITH
ELEVATOR SHOP DRAWINGS PRIOR TO CONSTRUCTION.
VERIFY ELEVATOR FEEDER REQUIREMENTS WITH ELEVATOR EQUIPMENT SUBMITTALS
PRIOR TO ROUGH-IN
PROVIDE 100A/3P FUSED DISCONNECT SWITCH WITH 100A DUAL ELEMENT FUSES FOR
ELEVATOR DISCONNECT. COORDINATE FINAL DISCONNEC REQUIREMENTS AND
LOCATION WITH ELEVATOR SHOP DRAWINGS PRIOR TO CONSTRUCTION.
PROVIDE 2" CONDUIT RUN TO ROOFTOP FOR PV EQUIPMENT CONNECTIONS.
DISCONNECT AND BREAKER SIZE BASED ON 1.5W/FT2 PV ARRAY. COORDINATE EXACT
CONDUIT ROUTING AND ANY ADDITIONAL REQUIREMENTS WITH OWNER PRIOR TO
ROUGH-IN.
EXISTING ELECTRICAL PANEL SHALL BE RE-FED FROM NEW DISTRIBUTION PANEL "DP".
RE-USE EXISTING CONDUIT AND CONDUCTORS WHERE POSSIBLE. MAINTAIN CIRCUIT
CONTINUITY FOR ALL EXISTING LOADS FED FROM PANEL.
RELOCATE EXISTING LOADS ON EXISTING PANELS "A" AND "C" TO NEW PANEL "DP".
MAINTAIN CIRCUIT CONTINUITY FOR ALL EXISTING LOADS FED FROM PANELS.
EXISTING SERVICE, INCLUDING UTILITY TRANSFORMER, METER, AND SWITCHBOARD,
SHALL BE DEMOLISHED. COORDINATE REMOVAL OF EXISTING TRANSFORMER AND
UTILITY METER WITH UTILITY. COORDINATE SERVICE DEMOLITION TIMELINE WITH
OWNER AND UTILITY TO MINIMIZE DOWNTIME.
PRIOR TO DEMOLITION OF THE EXISTING ELECTRICAL SERVICE, PROVIDE CONDUIT RUN
AND CONDUCTORS (PER FEEDER SCHEDULE) TO INTERCEPT EXISTING CONDUIT AND
CONDUCTORS FEEDING EXISTING PANELS TO MINIMIZE DURATION OF POWER
INTERRUPTION. DETERMINE EXACT INTERCEPT LOCATION IN FIELD AND COORDINATE
SCHEDULE WITH FORT COLLINS UTILITIES AND OWNER.
2
3
4
5
6
7
8
9
10
11
12
13
14
15
NEW EQUIPMENT TO BE INSTALLED AFTER NEW ELECTRICAL SERVICE HAS BEEN
INSTALLED. COORDINATE SCHEDULE FOR ANY INTERRUPTIONS TO BUILDING POWER
REQUIRED FOR EQUIPMENT INSTALLATION WITH OWNER.
MAIN DISTRIBUTION PANEL “MDP” SHALL BE AMERICAN MIDWEST POWER TYPE F
SWITCHBOARD WITH 2 SECTIONS. SUBSTITUTIONS WILL ONLY BE CONSIDERED IF THE
DIMENSIONS ARE LESS THAN OR EQUAL TO THOSE SHOWN ON THESE PLANS.
PANEL "DP" AND FEEDER TO BE INSTALLED PRIOR TO DEMOLITION OF EXISTING MAIN
UTILITY ROOM. ROUTE FEEDER THROUGH EXISTING EDUCATION WING, BELOW GRADE
ACROSS COURTYARD TO PANEL, OUTSIDE EXTENTS OF NEW CONSTRUCTION AND
EXCAVATION.
PROVIDE LOCKABLE FUSED DISCONNECT SWITCH WITH VISUAL BREAK AND NEMA 3R
ENCLOSURE. LOCATE NEXT TO MAIN UTILITY METER AND LABEL INDICATING "PV
DISCONNECT". VERIFY DISCONNECT AND FUSE SIZE WITH FINAL PV DESIGN.
CT METERING SHALL BE PROVIDED WITH THE CT COMPARTMENT LOCATED WITHIN THE
MAIN SWTICHBOARD AND REMOTE MOUNTED METER AS INDICATED, IN ACCORDANCE
WITH CHAPTER 8 OF THE FORT COLLINS LIGHT & POWER ELECTRIC SERVICE
STANDARDS.
UTILITY METER SHALL BE COORDINATED WITH FORT COLLINS LIGHT & POWER
ENGINEERING AND INSTALLED IN ACCORDANCE WITH SECTION 8 OF THE FORT COLLINS
LIGHT & POWER ELECTRIC SERVICE STANDARDS. THE METER SHALL BE SECURELY
FASTENED TO THE EXTERIOR BUILDING WALL AND BE MOUNTED BETWEEN 48 AND 72
INCHES ABOVE FINISHED GRADE.
SCALE
PROJECT NUMBER
DRAWN BY
DATE
REVISIONS
CHECKED BY
COPYRIGHT 2021 EWERS ARCHITECTURE PCstructural engineercivil engineerKL&A, INC.BASELINE ENGINEERINGmechanical + electrical engineerGIVEN & ASSOCIATES, INClandscape architectSAARINEN ASSOCIATES12" = 1'-0"D:\Revit 2020\20035 - Foothills Unitarian Addition_MEP_G20_aaron.mull.rvt11/10/2021 9:01:13 AMELECTRICAL ONE-LINE DIAGRAM1815 YORKTOWN AVENUE FORT COLLINS COLORADO20035
Author
11.17.2021
Checker
E.1
FINAL DEVELOPEMENT PLAN
N.T.S.
NEW ONE-LINE DIAGRAM Copy 11N.T.S.
DEMO ONE-LINE DIAGRAM Copy 12
FEEDER SCHEDULE
1600U 6 [(4 400 KCMIL AL) 3"PVC.]
600-1 2 [(3 500 KCMIL AL + 1 #2/0 AWG AL G.) 3"C.]
600 2 [(4 500 KCMIL AL + 1 #2/0 AWG AL G.) 3"C.]
225-1 (3 300 KCMIL AL + 1 #2 AWG AL G.) 2-1/2"C.
200 (4 250 KCMIL AL + 1 #4 AWG AL G.) 2-1/2"C.
175-1 (3 #4/0 AWG AL + 1 #4 AWG AL G.) 2-1/2"C.
150-1 (3 #3/0 AWG AL + 1 #4 AWG AL G.) 2"C.
125-1 (3 #2/0 AWG AL + 1 #4 AWG AL G.) 2"C.
100 (4 #1 AWG CU + 1 #8 AWG CU G.) 1-1/2"C.
60-1 (3 #4 AWG CU + 1 #8 AWG CU G.) 1-1/4"C.
50-1 (3 #6 AWG CU + 1 #10 AWG CU G.) 1"C.
TOTAL SERVICE AMPS (A) 1248 A
TOTAL SERVICE DEMAND (VA): 449575 VA
HVAC 188404 100.00% 188404
ELECTRIC HEAT 14500 100.00% 14500
MISCELLANEOUS 66180 100.00% 66180
KITCHEN 33100 65.00% 21515
MOTORS 68975 107.83% 74379
RECEPTACLES 39240 62.74% 24620
LIGHTING 45052 125.00% 56315
LOAD DESCRIPTION CONNECTED (VA) DEMAND FACTOR DEMAND (VA)
11 SPACE
10 SPACE
9 SPACE
8 SPACE
7 ELEVATOR
6 PANEL G
5 PANEL M
4 PANEL H
3 PANEL DP
2 PANEL D
1 PHOTOVOLTAICS
CKT CIRCUIT DESCRIPTION
SERVICE SIZE 1600 A
WIRES 4
PHASE 3
VOLTS 120/208 WYE
MDP LOAD SUMMARY