HomeMy WebLinkAbout2900 S COLLEGE AVE AT&T - PDP210007 - SUBMITTAL DOCUMENTS - ROUND 3 - RESPONSE TO STAFF REVIEW COMMENTS  Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6689
970.224.6134 ‑ fax
fcgov.com/developmentreview
June 30, 2021
Jaclyn Levine
AT&T, Nexius Solutions
7025 S Fulton Street
Suite 100
Fort Collins, CO 80112
RE: 2900 S College Ave AT&T, PDP210007, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of 2900 S College Ave AT&T. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your Development Review
Coordinator, Brandy Bethurem Harras via phone at 970‑416‑2744 or via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras, 970‑416‑2744, bbethuremharras@fcgov.com
Topic: General
Comment Number: 1
04/20/2021: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone conversations. Thank you!
Comment Number: 2
04/20/2021: INFORMATION:
As part of your resubmittal you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable, avoiding responses like noted or acknowledged.
Comment Number: 3
04/20/2021: INFORMATION:
Please follow the Electronic Submittal Requirements and File Naming
Standards found at https://www.fcgov.com/developmentreview/files/electronic
submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888.
File names should begin with the file type, followed by the project information,
and round number. Example: UTILITY PLANS_2900 S College Ave AT&T_PDP_Rd2.pdf
Comment Number: 4
04/20/2021: INFORMATION:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut‑off for routing the same week. When you are ready to resubmit your
plans, please notify me advanced notice as possible.
Comment Number: 5
04/20/2021: INFORMATION:
Temporary Service Changes ‑ City of Fort Collins Development Review
In order to continue providing thorough reviews and giving every project the
attention it deserves, the City of Fort Collins is implementing temporary
changes in how we serve our development customers. As you may be aware,
we are experiencing staff shortages in a number of key departments, which has
begun to impact the timeliness of our reviews. We recognize that
development and construction play a critical role in our community’s vibrancy
and economic recovery, and we have been exploring options for mitigating
impacts to our customers. As a result, we will be making some temporary service changes.
Beginning Monday May 10th one additional week of review time will be added
to all 1st and 2nd round submittals (increase from 3 weeks to 4 weeks).
Comment Number: 6
04/20/2021: FOR HEARING:
The proposed development project is subject to a Type 1 Review. The decision
maker for your project will be an Administrative Hearing Officer at a public hearing.
The Hearing Officer has 10 business days to make their decision. Following
the decision there is a 14 day appeal period.
Comment Number: 7
04/20/2021: FOR HEARING:
For the hearing, we will formally notify surrounding property owners within 800
feet (excluding public right‑of‑way and publicly owned open space). As your
Development
Review Coordinator, I will assist with preparing the mailing and coordinating the
hearing date with your team.
Comment Number: 8
04/20/2021: FOR HEARING:
All "For Hearing" comments need to be addressed and resolved prior to
moving forward with scheduling the Hearing. Staff would need to be in
agreement the project is ready for Hearing approximately 3 to 5 weeks prior to the hearing.
Comment Number: 9
04/20/2021: FOR HEARING:
I am letting you know that your quasi judicial item will be heard remotely and that
there is the option to hold off until an in person hearing can be conducted.
Any person or applicant seeking a quasi judicial decision from City Council, a
City board or commission or an administrative hearing officer under the City
Code or the City's Land Use Code, shall be notified in writing or by email of the
intention to conduct a Quasi Judicial Hearing using Remote Technology. Such
person or applicant shall be entitled to request that the Quasi Judicial Hearing
be delayed until such time as the Hearing can be conducted in person.
Comment Number: 10
05/17/2021: INFORMATION:
LUC 2.211 Lapse, Rounds of Review: Applicants, within one hundred eighty
(180) days of receipt of written comments and notice to respond from the City
on any submittal (or subsequent revision to a submittal) of an application for
approval of a development plan, shall file such additional or revised submittal
documents as are necessary to address such comments from the City. If the
additional submittal information or revised submittal is not filed within said
period of time, the development application shall automatically lapse and become null and void.
Department: Planning Services
Contact: Kai Kleer, 970‑416‑4284, kkleer@fcgov.com
Topic: General
Comment Number: 1
06/25/2021: FOR HEARING ‑ UNRESOLVED:
This comment has still not been addressed. Additionally, the photo‑renderings
are very poor quality and do not demonstrate the level of detail to assure that the
enclosure will be consistent with the bulk, mass and scale of the building.
Photo renderings have been updated to demonstrate the details that will be included in the stealth design.
Please see the included photosimulations.
04/16/2021: FOR HEARING:
As mentioned in the Incomplete Application Notice, a photo rendering is
required. The renderings must be to‑scale and be included after the title sheet
of the plan set. Please include multiple views from the public street adjacent to the site.
Comment Number: 2
06/25/2021 FOR HEARING ‑ UPDATED:
In the Rooftop Clearance Calc, Scenario 2 indicates that the antenna array
could be setback from the edge of the roof by 15 feet + while preserving RF
propagation over the edge of the parapet. What is the reason for no setting this
facility further from the edge of the roof?
Pushing the antennas back further from the rood edge would require the antennas to be built up higher.
Per the structural engineers working on this project, increasing the height would have a larger impact on the structural integrity of the building. Additionally, a center mount
would reduce the entire usability of the roof.
04/16/2021: FOR HEARING:
Regarding 3.8.13(C)(3), it is acknowledged in the Project Narrative that for
every foot in setback the enclosure would be required to increase in height by
two feet. What technical documentation can you provide to prove this?
If technical information cannot be provided that satisfies this standard it will be
required that the antenna/enclosure be located as far from the edge of the roof as possible.
Comment Number: 3
06/25/2021: FOR HEARING ‑ UNRESOLVED:
This comment still applies and dovetails with Comment #2
Pushing the antennas back further from the rood edge would require the antennas to be built up higher.
Per the structural engineers working on this project, increasing the height would have a larger impact on the structural integrity of the building. Additionally, a center mount
would reduce the entire usability of the roof.
04/16/2021: FOR HEARING:
There is significant concern around the mass and scale of the screen wall. Is
there any way to break down the massing of the wall system? This comment
dovetails with the setback requirement for roof‑mounted equipment. A possible
scenario would be where the antennas mount to the existing screen wall and are
just painted and textured to match or an additional screen wall be added (again,
think wedding cake). It is acknowledged in the Project Narrative that for every
foot in setback the enclosure would be required to increase in height by two
feet. What technical documentation can you provide to prove this?
Just a question for discussion, what is keeping the antennas from being
flush‑mounted to the top of the building's wall?
Comment Number: 4
06/25/2021 FOR HEARING ‑ UNRESOLVED:
This comment has not been addressed.
04/16/2021: FOR HEARING:
The brick textured screen wall will be required to provide a three‑dimensional
cornice that matches the buildings cornice treatment. The existing cornice
treatment features a soldier row of brick that overhangs the wall plane as well as
a bronze colored flashing. These design elements need to be replicated.
Please see updated site plan and photosimulations that include these requested details
Department: Light And Power
Contact: Cody Snowdon, 970‑416‑2306, csnowdon@fcgov.com
Topic: General
Comment Number: 3
06/29/2021: FOR INFORMATION:
As long as the electric for this service is behind the existing meter and no
upgrades are required with the existing service, Light and Power has no further comments.
Department: Forestry
Contact: Nils Saha, nsaha@fcgov.com
Topic: General
Comment Number: 2
6/29/2021: FOR HEARING ‑ UNRESOLVED:
4/20/2021: FOR HEARING:
Please include City of Fort Collins Tree Protection Notes on the plan set. These
notes are available from the coordinators or Nils Saha (nsaha@fcgov.com).
Comment Number: 3
6/29/2021: FOR HEARING:
With the new proposed location of the antenna, will tree pruning be required
during the installation process or for maintenance down the line? Please note
that if any tree work is required or any tree impact is anticipated, a site visit with
City Forestry (nsaha@fcgov.com) must be scheduled to obtain tree inventory and mitigation information.
No tree pruning is required with the proposed location nor will it be required during installation.
Department: Technical Services
Contact: Jeff County, 970‑221‑6588, jcounty@fcgov.com
Topic: General
Comment Number: 1
06/29/2021: INFORMATION ONLY:
Unless required during PDP, a complete review of all plans will be done at FDP.
Department: Building Services
Contact: Russell Hovland, 970‑416‑2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
04/19/2021: BUILDING PERMIT:
Construction shall comply with adopted codes as amended. Current adopted codes are:
2018 International Building Code (IBC) with local amendments
2018 International Existing Building Code (IEBC) with local amendments
2018 International Energy Conservation Code (IECC) with local amendments
2018 International Mechanical Code (IMC) with local amendments
2018 International Fuel Gas Code (IFGC) with local amendments
2018 International Swimming Pool and Spa Code (ISPSC) with local amendments
2018 International Plumbing Code (IPC) as amended by the State of Colorado
2020 National Electrical Code (NEC) as amended by the State of Colorado
Copies of current City of Fort Collins code amendments can be found at fcgov.com/building.
Accessibility: State Law CRS 9‑5 & ICC/ANSI A117.1‑2017.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures):
· 140mph (Ultimate) exposure B or
· Front Range Gust Map published by The Structural Engineer's Association of
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code: 2018 IECC commercial chapter.
INFORMATIONAL ITEMS:
· Commercial occupancies must provide 10ft setback from property line and 20
feet between other buildings or provide fire rated walls and openings per chapter 6 and 7 of the IBC.
· City of Fort Collins amendments to the 2018 IBC require a full NFPA‑13
sprinkler system per IBC chapter 9 or when building exceeds 5000 sq.ft. (or
meet fire containment requirements).
· Prescriptive energy compliance with increased insulation values is required for
buildings using electric heat.
· A City licensed commercial general contractor is required to construct any new commercial structure.