Loading...
HomeMy WebLinkAboutTHE QUARRY BY WATERMARK - FDP210016 - DOCUMENT MARKUPS - ROUND 3 - UTILITY PLANS (4)/ / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /6' SIDEWALK 5' SIDEWALK 6' SIDEWALK 6' SIDEWALK6' SIDEWALK 6' SIDEWALK 4.5' SIDEWALK S SHIELDS ST.HOBBIT ST. 4.5' SIDEWALK 5' SIDEWALKFDC FDCFDC FDC17.761 7 . 8 4 17.83 1 7 . 3 9 17.2917.5417.4517.3217.0216.9118.641 7 . 9 0 18.34 18.3416.67 16. 5 2 16.0816. 2 0 16.82 15.2816.49 16.0516.07 15.8217.0717.55 1 6 . 5 117.7715.17 17. 0 5 19.00 18.341 8 . 9 9 19. 5 8 19.65 19.65 19. 6 5 2.3%2.8%4.2%3.9%3.0%2.0%2.3%1.2% 2.1% 1.9%2.4%2.4%2.4%0.5%0.2%2.0%1.5%2.0% 0.5%0.5% LOT 1EXISTING SIDEWALK9' SIDEWALKLOT 1 LOT 1 1.3%1.7%2.0%0.5%0.5%1.5%17.811 7 . 8 1 17.881.6%0.5%9' SIDEWALK1.6%0.5%29' HALF ROW FFE=16.50 FFE=19.00 FFE=19.65 FFE=17.50 FFE=17.49 PROPOSED 4' CONCRETE PAN PROPOSED 4' CONCRETE PAN PROPOSED 4' CONCRETE PAN PROPOSED 4' CONCRETE PAN PROPOSED 2' CONCRETE PAN PROPOSED 2' CONCRETE PAN PROPOSED AREA DRAIN 26' EMERGENCY ACCESS EASEMENT 26' EMERGENCY ACCESS EASEMENT 26' EMERGENCY ACCESS EASEMENT 26' EMERGENCY ACCESS EASEMENT 26' EMERGENCY ACCESS EASEMENT 48' SANITARY SEWER EASEMENT PROPOSED 30" VERTICAL CURB & GUTTER PROPOSED LANDSCAPE WALL PROPOSED AREA DRAIN PROPOSED AREA DRAIN STORM DRAIN 1 SEE SHEET C 620 STORM DRAIN 1-9 SEE SHEET C 622 17. 2 7 16.3516. 7 3 16.85 1.5%2.0%PROPOSED AREA DRAIN PROPOSED AREA DRAIN2.8%BUILDING 6 BUILDING 7 BUILDING 2 BUILDING 3 BUILDING 416.0216.6615. 6 2 15.5816.24 16.37 15. 1 7 15.5316.0415.9116.4816.42 15.4115. 9 00.5%0.5%16.4116. 0 8 2.0% 2.0% 1.7%0.5%0.7%17.8415. 2 6 15.4115.5615. 7 3 15. 9 4 15.96 15. 4 2 15.05 14.88 15.96 1 6 . 0 3 16.1717.0717.09 17. 1 8 17.05 16.52 16.54 16.61 16.49 16.40 16.1815.80 15.3015. 1 1 15.7015.6115.6315.70 16.23 16. 0 9 16. 1 9 16.2217.0417.0017.0417.1717. 1 0 16.9316.8416.8216.61 16. 5 4 1 6 . 1 6 16.29 1 6 . 2 8 15.5315.45 17.7817.7217.700.7%17.2017.14 17.43 HP 17.28 1 7 . 2 3 16. 8 2 16.8216.90 17. 1 3 15. 1 817.0616.920.5%15.1715.0215.78 15. 6 8 15.70 16.3016.20 16.17 16.19 16.2817.76 17.6017.61 17.80 18. 3 2 15.70LP16.17 LP 0.5% 2.0%15.100.5%PROPOSED 2' SIDEWALK CHASES PROPOSED 1' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASEPROPOSED 1' SIDEWALK CHASE PROPOSED 2' CURB CUT PROPOSED 1' CURB CUT AREA DRAINS SEE SHEET C 601-C 60618.46HP18.41 18. 3 7 18.2918.4918.2218.2519.2019.5619.0019. 0 0 19.6518.9918.9218.901 8 . 3 4 18.8618.2518.3418.3318.8119.6519.5619.6518.9918.9918.89 18.9019.6519. 5 0 19.6518.9918.9918.9219.5619.6518.9919.6519. 5 619.4017. 9 0 17.8017.30 16.98 16. 9 3 16.6916.66 17.1717.6017.5418.03 18.3417.4918.0017.6217.4916.6718.7618.6817.9717. 2 1 19. 6 5 19. 6 2 19.4918.3217.6017. 6 3 18. 1 8 18.1017. 3 0 17.2417.0216.9519.76(19.82)19.48 19.6519.5619.39 18.561 8 . 5 9 18.511 8 . 0 0 17. 9 718.1219.111 9 . 1 8 19. 4 619.241 9 . 6 5 19.55 1 9 . 6 2 19.65 19.56 19.5619.5018.2318.2719.4520.2819.4219.56 19.6518. 9 9 1 8 . 9 9 18.991.5%2.0%18.2918.2018.244.5%3.1%2.0%2.0%2.0%2.0%18.16 0.5%18.8918.4320.25MATCH EXISTING PAVEMENT PROPOSED STAIRS PROPOSED STAIRS PROPOSED STAIRS PROPOSED 2' SIDEWALK CHASE 2.0%1.5%1.5%1.7%2.7%1.5%PROPOSED STAIRS PROPOSED STAIRS PROPOSED STAIRS 1.6%0.6%1.0%1.8%1.5%0.5% 0.5% 2.0%2.0%1.5%1.4%1.6%1.5%2.0%0.6%0.6%17.5016.8716.8316.7516.751 6 . 7 5 1 6 . 2 8 16.2616.7516.6116.1416.1616.6716.1715.9216.33HP16.2416.25HP15.900.5%17.0715.80HP16.4316.3716.14 HP 16.49 1 7 . 4 1 17.40 17.5016. 8 3 15.18 15.7015.6515.67 17.42 17.4617.50 1 7 . 5 0 17. 3 3 15.5815.4215.3714.87 14.89 14. 5 0 14.4814.9815.0314.99 15.53 15.59 17.34 17.4017.5017.5017.4617.40 15.65 15.59 14.76 14. 2 014.7317. 5 0 17.4017.5016.8316.7516.7517.4016. 8 317.5017.4017.5016.8316.8315. 1 5 17. 4 0 18.87 18.92AREA DRAINS SEE SHEET C 601-C 606 AREA DRAINS SEE SHEET C 601-C 606 CULVERTS SEE SHEET U1-U4 CULVERTS SEE SHEET C 601-C 606 CULVERTS SEE SHEET C 601-C 606 CULVERTS SEE SHEET C 601-C 606 PROPOSED 2' CONCRETE PAN PROPOSED 2' CONCRETE PAN (19.64)(19.62)(20 . 2 3 ) PROPOSED 2' PAN w/ 6" CURB 17.27 16.41 16. 3 8 1 6 . 0 1 1 5 . 9 3 1 5 . 4 9 15.231 4 . 9 4 16.20 1 4 . 9 8 14.871 4 . 8 2 LP15.2215.131 7 . 1 017.1016.41 16.92 16.51 17.26 16. 3 0 16.62 16.28 16.96 16.1516.41 15.0915. 0 6 14.97 14. 9 4 LP 15.1315.3016. 0 5 15.24 15.28 1 5 . 6 4 16. 0 916.2016.0717.11 LP 17.96 HP16.82LP1 6 . 0 6 16.031 5 . 6 1 1 5 . 5 9 15.151 8 . 3 4 17.9817.90 17.8118.1218.1617.9017.6217.7317.2017.11 17.1217.03 17.191 6 . 6 719.0018.9118.3418.3418.13 18.1317.4916.5517.7618.18(19.55)(19.54) (19 . 3 0 ) (19 . 2 9 ) (19 . 2 5 ) (19.24) (18.90) (18.86) (18 . 7 9 ) (18.77) (18.46) (18.45) 19.00 18.94 16. 6 9 18.3316.9719.0018.92 18.80 18.35 18.37 18.97 18.91 19.00 18.77 17.14 17.24 18.91 19.00 18.44 18. 3 6 18.91 18.97 19.00 18.8617.4118.34 18. 3 417.6918.95 19.00 18.81 1 8 . 1 7HP 18.3419. 0 0 18.9119.001 8 . 3 4 18.14 17. 6 417.681 7 . 7 7 1 7 . 7 3 18.15 1 8 . 3 3 17.69 19.00 18.91 19.00 18.34 18.10 18.1517.5618.00 17. 9 0 18.34 2.0% 1.5% 1.1%1.5%3.3%2.0%0.6%1 5 . 2 0 15. 5 0 HP 2.0%0.6%0.5%4.5%0.6%0.5%1.7%2.0%1.4%0.8%2.0%1.5%15.83 2.0%1.2%2.0% 16. 4 5 16.37 17.30 17. 1 6 17.16 16.25 16.37 16.8216.7316.7016.7516.29 16.87 16. 3 3 16.1916.2416.3316.32 16.58 HP 16.82 16. 8 2 16.80 16.82 16.8216.82 17.16 15.7315.34 15. 8 9 17.00 16.00 16.06 15. 9 3 15. 0 9 14. 9 7 15. 1 2 15. 8 3 1 5 . 8 3 15.33 15. 3 3 15. 8 4 16. 5 015.2116. 5 0 15. 3 3 15. 8 3 15. 3 3 16.50 15. 5 7 16.5015. 9 3 16. 0 0 1 6 . 5 0 15.8315.81 15.87 15. 9 5 15.24 15.76 16.5016.41 15.91 15.55 15.4615.8515.5415.6315.921 6 . 6 1 1 6 . 5 016.861.6%2.2%2.0% 1.5% 1.5% PROPOSED 2' CONCRETE PAN PROPOSED 2' CONCRETE PAN PROPOSED AREA DRAIN PROPOSED AREA DRAIN PROPOSED AREA DRAIN PROPOSED AREA DRAIN PROPOSED AREA DRAIN PROPOSED AREA DRAIN 18.75 18.85 CULVERTS SEE SHEET C 601-C 606 18.07 17.53 1.1%4.2%2.0% 17.43 HP 17.010.5%0.5%0.5%2.0%2.0%1.5%3.7%17.16 17.05 17.16 16.8316.4816. 3 7 3. 0%1.9%3.7%0.8% PROPOSED 2' CONCRETE PAN PROPOSED 2' CONCRETE PAN 16. 4 0 16. 0 3 15.60 PROPOSED 1' SIDEWALK CHASE 15.76 15.91 1 6 . 4 1 1 5 . 7 5 15.7815.83 15. 6 9 16. 4 1 1 5 . 8 2 15.8316.131.5%0.5%2.3%1.8%2.2%2.3%1.3%1.0% 15.18 1.5%PROPOSED AREA DRAIN PROPOSED AREA DRAIN PROPOSED AREA DRAIN 15. 7 1 PROPOSED STAIR 16.50 PROPOSED STAIR PROPOSED STAIR 16.50 2.0%1.8%1.8%1.7%1.8%2.0%2.0%2.0%2.9%2.0%0.5%2.6%1.7%2.7%0.6% 17.40 16.1416.161.5%18.22 GARAGE 1 GARAGE 2 GARAGE 3 18.49 HP 15.46HP17.53 PROPOSED 2' CONCRETE PAN 16.3916.78 17.0817.2115.98HPFFE= 17.30 PROPOSED AREA DRAIN PROPOSED 1' SIDEWALK CHASE18.3%11.2%SheetTHE QUARRY BY WATERMARKThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 48 C 501GRADING PLAN13 ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 NORTH PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD 88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE CITY REGULATED 100-YR CANAL IMPORTATION FLOODPLAIN/FLOODWAY AS WELL AS THE FEMA REGULATED SPRING CREEK 100-YR FLOODPLAIN/FLOODWAY. ANY DEVELOPMENT WITHIN THE FLOODPLAIN MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE CITY OF FORT COLLINS FLOODPLAIN LIMITS AS DELINEATED ON THE FINAL SUBDIVISION PLAT. 6.ANY CONSTRUCTION ACTIVITIES, NONSTRUCTURAL DEVELOPMENT (BRIDGES, SIDEWALKS, CULVERTS, VEGETATION, CURB CUTS, GRADING, ETC.) IN THE REGULATORY FLOODWAY MUST BE PRECEDED BY A NO RISE CERTIFICATION, WHICH MUST BE PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. 7.NO STORAGE OF MATERIALS OR EQUIPMENT SHALL BE ALLOWED IN THE FLOODWAY, WHETHER TEMPORARY (DURING CONSTRUCTION) OR PERMANENT. 8.ANY PEDESTRIAN BRIDGES IN THE FLOODWAY THAT ARE NOT ABLE TO PASS THE 100-YR FLOW ARE REQUIRED TO BE "BREAKAWAY" AND TETHERED. NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPOSED RIGHT OF WAY LEGEND: PROPOSED GRADE BREAK KEYMAP CABLE F.O. TE MH 24" SS 24" SS 24" SS 24" SS 24" SS24" SS24" SS24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS EEE EEEEEEEEE EEEEE EEEEE EEEEE EEEE TT T T T T T TTTTTTTTTTTTTTTTTTTTTTT GW W W W W W W W W W W W W W W W W W W W W W W W W W 12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" WEEEEEEEEEEEEEEEEEEEEE GGGGGGGG G G GG GGGGGGGGGX X XXXXX X X XXX XX XX XXXX X X X X XXXXXXXX X X X X XXX30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" WUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDMH / / / / / / / // / / / / / / // / / / / / / /30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W XSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R SEE SHEET C 503 SEE SHEET C 502C 501 C 502 C 503 C 504 C 506 C 505C 505Line Over Text & Text Over Text Text Over Text Text Over Text Text Over Text 9/28/2021 D / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / /STSTSTSTSTSTSTSTSTSTUP 6' SIDEWALK6' SIDEWALK 9' SIDEWALK 6' SIDEWALK 6' SID E W A L K UD UD UD UD FDC NYLOPLAST DO NOT POLLUTE DRAINS TO WATERWAYS 17. 2 8 17.1717.15 17.20 16.66 16.66 16.77 16. 7 8 17.11 17.10 16.32 16.66 16.1216. 0 416.1316.1816.33 16.55 16.39 17.16 19.00 17.58 15.5417.051.5%1.5%3.0%2.5%1.4%2.5%2.0%2.0%2.0% 0.9%S SHIELDS STTRACT C LOT 1 SPRIN G C R E E K EXIST I N G S P R I N G C R E E K T R A I LEXISTING SIDEWALKEXISTING SIDEWALKTRACT B2.0%15.8517.16 5:16:19:14 : 1 7:1 6:1FFE=17.27 FFE=17.49 PROPOSED 4' CONCRETE PAN PROPOSED 2' CONCRETE PAN PROPOSED 2' SIDEWALK CHASE PROPOSED AREA DRAIN EXISTING 30" STORM DRAIN PROPOSED AREA DRAIN 31' EMERGENCY ACCESS EASEMENT 33' WATER EASEMENT PROPOSED 4' SIDEWALK CULVERT PROPOSED 2' SIDEWALK CHASE FEMA 100-YR HIGH RISK FLOOD FRINGE PROPOSED 2' CONCRETE PAN PROPOSED STORM CHAMBERS STORM DRAIN 4-4A SEE SHEET C 624 STORM DRAIN 4 SEE SHEET C 624 STORM DRAIN 4-4 SEE SHEET C 624 STORM DRAIN 5 SEE SHEET C 625 STORM DRAIN 4 SEE SHEET C 624 STORM DRAIN 6 SEE SHEET C 626 9' SIDEWALK 16.3016.362.0%1.5%1.8%1 6 . 7 0 BUILDING 3 POND OVERFLOW CHANNEL WQ ELEV. = 5012.20 100YR ELEV. = 5014.91 16.83 16.87 1 6 . 2 2 1 6 . 1 7 12.00 0.5% 17. 0 3 16.2716.23 BUILDING 1 16.14 15.99 15.83 15.65 15. 6 3 15.78 15.62 15.67 15. 7 0 15.91 15.90 16.0216. 5 0 16.46 16.49 16. 4 516.3816. 3 9 16.45 16.92 16.9416.8917.00 16.90 16.4316.46 16.23 16.8716.5116.16 16. 2 5 16.45 16. 0 0 15.84 0.5% 16.92 16.10 PROPOSED 2' SIDEWALK CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED AREA DRAIN (18.46) (18.45) 18.94 16. 6 9 18.80 17. 9 0 18.34 16.00 16.06 15. 9 3 15. 0 9 15. 1 2 15. 8 32.2%0.5%16. 3 7 15.76 PROPOSED AREA DRAIN (18.41) (18.40) (18.32) (18.34)(17.79)(17.08) (17.43)(17.45)(17.90)(17.62)(18.47) PROPOSED LANDSCAPE WALL PROPOSED 1' SIDEWALK CHASECULVERTS SEE SHEET C 601-C 606 PROPOSED 2' CONCRETE PAN 16. 2 6 16.33 15.33 15.33 16.4116.5015.33 15.2816.6616.7416.4216.3216.54 17. 2 0 17.12 16. 5 5 16. 0 0 15. 8 5 15.4315. 3 7 15. 2 9 15. 6 2 15.66 16. 2 3 16. 2 6 16.3116.35HP17. 1 6 17. 0 4 16. 7 5 17.16 16.65 16. 1 2 16. 2 2 17. 1 0 16.9216. 0 2 16. 2 6 16. 2 4 16.82 15. 9 8 17.40 16.78 17. 1 9 17. 2 717. 2 7 17. 2 7 17. 1 7 18.33 PROPOSED STAIRS 17. 2 0 17. 2 1 17. 2 1 17.27 17.2017. 2 7 17.25 17. 2 7 17. 0 7 PROPOSED 2' CONCRETE PAN PROPOSED FLUSH CURB 17. 1 6 17. 2 5 17. 2 5 17. 0 6 17. 2 7 17.28 17.33 17.5617.47 17.28 17.26 17.27 17.27 17.27 1 7 . 5 9 17.58 17.42 16.28 16. 7 8 16.84 16.9417.57 16.98 17.27 17.27 17.37 17.1316.58 17.27 17.27(17.73)17.22 17.27 17.27 17.2716.8817.19 16.2817.1417.10 18.09 18.13 16.71 18.21 18.32 17.2117.99 18.00 17.87 17.80 17.98 16.8317.76 18.22 16.24 16.51 1 7 . 0 1 15.9415.71 15.30 15.84 15. 1 8 15.09 14. 7 1 14.05 13.0015.0715.2215.4815.5315.4115.89 16.25 16.13 16.05 11.26 11.34 11.08 11.05 10.95 11.08 17.25 17.41 11.65 11.31 12.83 13.00 12.18 12.19 13.60 14.61 14.75 15.29 15.14 14.60 16.23 16.26 16.81 16.86 17.34 17.31 16.83 16.98 17.01 17.59 17. 5 4 17.57 17.39 17.27 17. 2 5 17.39 17.33 17. 5 7 17.62 17.6017.39 17.43 17.47 17. 0 9 17. 1 4 17.52 17.52 16.89 16.88 17.28 0.5%17.550.5%1.5%2.0%0.5%1.5%1.6%1.5%2.0%2.5%2.0% 0.5% 0.5% 0.8%2.0%4.0%3.8%2.0%2.0%0.5%2.0%1.5%0.5%1.5%5.6% 0.5% 0.5%2.0%1.3%1.3%1.5 %1.3%0.5% 0.8%1.5% 1 . 5% 2.1% 1.6%2.2% 1.6 % 15.72 15.64 1.5%1.5%0.4 %0.9%2.0%0.5%0.5%0.5%3.0%0. 5 %1.5%0.5%0.5% 15.48 0.5%0.5%15.571.0%17.9917.8617.7517.72PROPOSED 2' CONCRETE PAN PROPOSED LANDSCAPE WALL 1.5% 1 8 . 3 4 2.8%1.9%(17.84) EXISTING 30" VERTICAL CURB & GUTTER EXISTING 30" VERTICAL CURB & GUTTER TIE TO EXISTING TIE TO EXISTING MATCH EXISTING TIE TO EXISTING TIE TO EXISTING 1.0% 0 . 6% PROPOSED MAINTENANCE ACCESS PATH 5:14: 1 7:1PROPOSED FLUSH CURB TIE TO EXISTING FEMA 100-YR FLOODWAY DETENTION POND 2 17.30 ROOF DRAINS SEE SHEET C 607-C 608 ROOF DRAINS SEE SHEET C 607-C 608 ROOF DRAINS SEE SHEET C 607-C 608 17.27 17.37 17.2717.27 4'x4' ADA LANDING 4'x4' ADA LANDING 1 7 . 5 517.56 4'x4' ADA LANDING 4'x4' ADA LANDING 17.53 17.41PROPOSED 1' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE 17.27 PROPOSED 1' SIDEWALK CHASE PROPOSED TRENCH DRAIN 17.24 16.79 17.71 17.71 17.71 17.71 PROPOSED AREA DRAIN 17. 2 417.24 16. 6 6 1 6 . 7 0 16.78 17. 2 5 17. 2 7 17. 2 7 17. 2 7 17.65 17.69 17.66 17.6817.6716.7016.60 W STUART ST KEYMAP CABLE F.O. TE MH 24" SS 24" SS 24" SS 24" SS 24" SS24" SS24" SS24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS 24" SS EEE EEEEEEEEE EEEEE EEEEE EEEEE EEEE TT T T T T T TTTTTTTTTTTTTTTTTTTTTTT GW W W W W W W W W W W W W W W W W W W W W W W W W W 12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" W12" WEEEEEEEEEEEEEEEEEEEEE GGGGGGGG G G GG GGGGGGGGGX X XXXXX X X XXX XX XX XXXX X X X X XXXXXXXX X X X X XXX30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" W30" WUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDUDMH / / / / / / / // / / / / / / // / / / / / / /30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W 30" W XSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST SheetTHE QUARRY BY WATERMARKThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 48 C 503GRADING PLAN15 ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 NORTH PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD 88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE CITY REGULATED 100-YR CANAL IMPORTATION FLOODPLAIN/FLOODWAY AS WELL AS THE FEMA REGULATED SPRING CREEK 100-YR FLOODPLAIN/FLOODWAY. ANY DEVELOPMENT WITHIN THE FLOODPLAIN MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE CITY OF FORT COLLINS FLOODPLAIN LIMITS AS DELINEATED ON THE FINAL SUBDIVISION PLAT. 6.ANY CONSTRUCTION ACTIVITIES, NONSTRUCTURAL DEVELOPMENT (BRIDGES, SIDEWALKS, CULVERTS, VEGETATION, CURB CUTS, GRADING, ETC.) IN THE REGULATORY FLOODWAY MUST BE PRECEDED BY A NO RISE CERTIFICATION, WHICH MUST BE PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. 7.NO STORAGE OF MATERIALS OR EQUIPMENT SHALL BE ALLOWED IN THE FLOODWAY, WHETHER TEMPORARY (DURING CONSTRUCTION) OR PERMANENT. 8.ANY PEDESTRIAN BRIDGES IN THE FLOODWAY THAT ARE NOT ABLE TO PASS THE 100-YR FLOW ARE REQUIRED TO BE "BREAKAWAY" AND TETHERED. NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPOSED RIGHT OF WAY LEGEND: PROPOSED GRADE BREAK CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R SEE SHEET C 501 SEE SHEET C 504SEE SHEET C 506 C 501 C 502 C 503 C 504 C 506 C 505C 5059/28/2021 Text Over Text Text Over Text Text Over Text Text Over Text