Loading...
HomeMy WebLinkAboutFORT COLLINS NISSAN-KIA - PDP210017 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS (2)30'-0" WIDTH 15'-0" (DEPTH)20'-0" GATE OPENING 3'-6"SS BOLLARD SS BOLLARD STEEL BOLLARD MAN-GATE (4' W)1'-0"ANGLE IRON BUMPERS A0.8 2 A0.8 3 CONC SLAB-ON-GRADE PER STRUCT1'-4"8'-0" T.O. CMUPROVIDE WHEEL AND DIAGONAL STL CABLE BRACING AT EACH GATE END FOR SUPPORT GC TO COORD CANE BOLTS & LATCHING HARDWARE WITH OWNER CORRUGATED METAL PANEL (MP-1) GATE CLADDING (ORIENTED VERTICAL) W/ FINISH TO MATCH THE NISSAN BUILDING, TYP AT ALL MAN / VEHICLE ACCESS GATES SS BOLLARD TO MATCH THE NISSAN BUILDING BOLLARDS CMU TO MATCH THE NISSAN BUILDING (CMU-1) PREFIN MTL COPING CAP TO MATCH THE NISSAN BUILDING (DARK GRAY) SCHED GRADE PER CIVIL CONC FOUNDATION PER STRUCT PAINTED RIGID STEEL FRAMED DOUBLE 180° OUTWARD- SWING GATES (BLACK) MOUNTED TO (2) STEEL CHANNELS CAST IN EACH END WALL OF THE FRONT OPENING USING EXTRA HEAVY DUTY HINGES; GATES PROVIDED WITH HOLD- OPEN / CLOSE GATE PINS & PADLOCK LATCH, TYP. PAINT GATES AND ALL HARDWARE BLACK STEEL TUBE COLUMN, PTD (BLACK) Issued For SD: Plot Date: Issued For DD: Issued For Permit: Issued For Construction: Seal: NOT FOR CONSTRUCTION 206 East 4th Street, Loveland, Colorado 80537 10/6/2021 11:13:46 AM A0.8SITE DETAILS-FORT COLLINS NISSAN KIA5811 S COLLEGE AVE, FORT COLLINS, CO 8052521010 PLANNING SUBMITTAL Revision Number Revision Date 1/8" = 1'-0"A0.8 1 ENLARGED SITE PLAN - TRASH ENCLOSURE 1/4" = 1'-0"A0.8 3 ELEVATION - TRASH ENCLOSURE - FRONT 1/4" = 1'-0"A0.8 2 ELEVATION - TRASH ENCLOSURE - SIDE FIRST FLOOR EL. = 100' - 0" T.O. HIGH PARAPET EL. = 128' - 0" 1 SECOND FLOOR EL. = 112' - 0" 2 3 4 5 6 8 9 10 11 2 A5.2 3 A5.2 1 A5.2 KNOX BOX PER AHJ CLEAR GLAZING IN ALUMINUM FRAMES (ALL INTERIOR FRAMES BOTH VERTICAL AND HORIZONTAL ARE CLEAR ANODIZED; ALL EXTERIOR HORIZONTAL ARE CHARCOAL, ALL EXTERIOR VERTICAL ARE BUTT GLAZED). ACM-1 SF-1 ACM-3 ACM-3 ACM-1 ACM-1 SF-1 EG-3 EG-2EG-1 D-1 DP-1 D-3 CMU-1 CF-1 CF-3 CF-1 SF-2 CF-1 SF-2 EL. = 132' - 0" T.O. ENTRY ELEMENT EL. = 118' - 3" T.O PARAPET MP-1 CF-1 ACM-2 12'-0"FIRST FLOOR EL. = 100' - 0" A T.O. HIGH PARAPET EL. = 128' - 0" SECOND FLOOR EL. = 112' - 0" BCDEFGH 3 A5.1 2 A5.1 1 A5.1 SF-1 CF-1 ACM-3 ACM-1 CMU-1 MP-1 B-1 B-1 ACM-3 B-1D-5 D-3 D-2 D-5 D-7 D-6 CF-3 SF-2 D-3 SF-2 CF-3 EL. = 132' - 0" T.O. ENTRY ELEMENT EL. = 116' - 3" T.O PARAPET 12'-0"CF-1 ACM-3 ACM-2 Issued For SD: Plot Date: Issued For DD: Issued For Permit: Issued For Construction: Seal: NOT FOR CONSTRUCTION 206 East 4th Street, Loveland, Colorado 80537 10/6/2021 11:16:49 AM A4.1BUILDINGELEVATIONS -FORT COLLINS NISSAN KIA5811 S COLLEGE AVE, FORT COLLINS, CO 8052521010 PLANNING SUBMITTAL EXTERIOR MATERIALS KEYNOTE MATERIAL MANUFACTURER PRODUCT NAME COLOR NAME LOCATION REMARKS ACM-1 ALUMINUM COMPOSITE METAL MITSUBISHI PLASTICS APOLIC 4334BSX3.5 SILVER METALLIC GENERAL FACADE - SITE SIGNAGE NOTE: DRY REVEAL SYSTEM ACM-2 ALUMINUM COMPOSITE METAL MITSUBISHI PLASTICS APOLIC 734L927 (FEVE) VALFLON 10742 RED FACADE ENTRY - SITE SIGNAGE NOTE: DRY REVEAL SYSTEM ACM-3 ALUMINUM COMPOSITE METAL MITSUBISHI PLASTICS APOLIC 732L878 (FEVE) VALFLON 11324 GRAY SERVICE DRIVE - GENERAL FACADE - ENTRY NOTE: DRY REVEAL SYSTEM B-1 BOLLARDS ID METALCO DIX BOLLARD STAINLESS STEEL SITE CF-1 PRE-FINISHED METAL COPING CAP COLOR TO MATCH ACM-1 SEE EXTERIOR ELEVATIONS CF-3 PRE-FINISHED METAL COPING CAP COLOR TO MATCH ACM-3 SEE EXTERIOR ELEVATIONS CMU-1 CONCRETE MASONRY UNIT BRAMPTON BRICK PROFILE SERIES CONCRETE BLOCK ABSOLUTE BLACK QUARTZ SERVICE BAYS D-1 FRONT ENTRY GLASS MAN DOORS CRL US ALUM ARCHITECTURAL PRODUCTS & SERVICES 08 4210 CRL WEDGE LOCK DRY GLAZE DOOR RAIL SYSTEM, DOOR PULL: STRAIGHT STYLE LADDER PULL 42LPBS STANDARD WEDGE LOCK DOOR RAIL: CRL DR4T12 4" TALL TAPERED GLASS AND ALUM FINISH COLOR TO MATCH PC-2 TIGER DRYLAC RAL 7024, DOOR PULL: POWDER COATED RAL 7024 MATCH DOOR RAIL: POWDER COATED RAL 7024 MATCH NEW VEHICLE DELIVERY & SHOWROOM ENTRY NOTE: SEE DRAWINGS FOR DOOR PULL SPECIFICATION D-2 INSULATED OVERHEAD COILING DOOR OVERHEAD DOOR CO STORMTITE AP MODEL 627 POWDER COATED TO MATCH P-5 PARTS RECEILING & SERVICE WORKSHOP D-3 INSULATED STOREFRONT MAN DOOR KAWNEER 500T INSULPOUR THERMAL ENTRANCE FINISH TO MATCH SF-1 SERVICE BAYS & STAIRWELL D-4 HIGH SPEED OVERHEAD COILING DOOR RYTEC RYTEC SPIRAL FV DOOR ALUM SLAT FRAMES WITH CLEAR POLYCARBONATE WINDOWS OIL CHANGE ENTRY D-5 GLASS SECTIONAL GARAGE DOOR OVERHEAD DOOR CO 521 SERIES ALUM SECTIONAL DOOR FINISH TO MATCH SF-1 SERVICE BAYS, SHOW ROOM, NEW VEHICLE DELIVERY TRACK TYPES VARY, SEE FLOOR PLANS D-6 INSULATED HOLLOW METAL SOLID DOOR & FRAME PAINTED TO MATCH ACM-3 BOH SERVICE AREAS GLASS TRANSOM WHERE SCHEDULED TO MATCH SF-1 D-7 SOLID SECTIONAL GARAGE DOOR WITH VISION WINDOWS OVERHEAD DOOR CO 596 SERIES THERMACORE SECTIONAL DOOR POWDER COATED TO MATCH P-5 BOH SERVICE AREAS TRACK TYPES VARY, SEE FLOOR PLANS D-8 SOLID SECTIONAL GARAGE DOOR OVERHEAD DOOR CO 596 SERIES THERMACORE SECTIONAL DOOR POWDER COATED TO MATCH ACM-3 BOH SERVICE AREAS DP-1 DOOR PULL SOURCED BY GC CUSTOM ITEM POWDER COATED PC-3 RAL 3031 MATCH MAIN ENTRY - VEHICLE DELIVERY - SERVICE WRITE UP EG-1 NISSAN LARGE TABLET SIGNAGE FRONT ELEVATION BY SEPARATE PERMIT, GC TO COORD POWER AS REQ'D EG-2 36" NISSAN WORDMARK SIGNAGE FRONT ELEVATION BY SEPARATE PERMIT, GC TO COORD POWER AS REQ'D EG-3 30" DEALER NAME SIGNAGE FRONT ELEVATION BY SEPARATE PERMIT, GC TO COORD POWER AS REQ'D EG-4 24" SERVICE SIGNAGE SERVICE ENTRY BY SEPARATE PERMIT, GC TO COORD POWER AS REQ'D MP-1 CORRUGATED METAL PANEL FINISH TO MATCH P-5 SERVICE BAYS P-5 PAINT SHERWIN WILLIAMS PRIMER: #E28W02600 PROMAR 200 LATEX PRIMER - PAINT: #A96W01251 DURATION - INTERIOR ACRYLIC LATEX PAINT EGGSHELL FINISH SW 7076 CYPERSPACE - COLOR TO MATCH RAL 7024 ALL EXTERIOR BUILDING SURFACES NOT COVERED W ACM - INCLUDING DOORS SF-1 CURTAIN WALL SYSTEM KAWNEER 1600UT SYSTEM 2 ULTRA THERMAL CURTAIN WALL SYSTEM GLASS: CLEAR 1" INFILL MULLIONS: PPG UC70743 DURANAR GRAPHITE GRAY (COLOR TO MATCH RAL 7024) GENERAL EXTERIOR - FACADE - SERVICE DRIVE SEE EXT ELEV FOR ADDITIONAL SYSTEM NOTES SF-2 STOREFRONT SYSTEM KAWNEER 451T SERIES THERMALLY BROKEN FRAMES GLASS: CLEAR 1" , MULLIONS: CLEAR ANODIZED ALUM GENERAL EXTERIOR - FACADE - SERVICE DRIVE FRONT GLAZED Revision Number Revision Date 3/32" = 1'-0"A4.1 2 EXTERIOR ELEVATION - EAST 3/32" = 1'-0"A4.1 1 EXTERIOR ELEVATION - NORTH FIRST FLOOR EL. = 100' - 0" A T.O. HIGH PARAPET EL. = 128' - 0" SECOND FLOOR EL. = 112' - 0" B C D E F G H 3 A5.1 2 A5.1 1 A5.1 SF-1 ACM-1 ACM-3 D-5 SF-2 D-4D-7 D-6D-7 CMU-1 MP-1 ACM-1 ACM-3 B-1B-1 EG-4 D-8 D-3SF-2 SF-2 D-3 SF-2 CF-1 EL. = 118' - 3" T.O PARAPET EL. = 132' - 0" T.O. ENTRY ELEMENT 12'-0"CF-1 ACM-3 ACM-2 FIRST FLOOR EL. = 100' - 0" T.O. HIGH PARAPET EL. = 128' - 0" 123456891011 2 A5.23 A5.2 1 A5.2 FDC CONNECTION PER AHJ ELEC METER / DISCONNECT HM DOOR / FRAME, PTD ACM-3 ACM-3D-6 D-6D-6 CMU-1 CF-1 ACM-1 EL. = 118' - 3" T.O PARAPET EL. = 116' - 0" T.O PARAPET CF-1 MP-1 12'-0"CMU-1 Issued For SD: Plot Date: Issued For DD: Issued For Permit: Issued For Construction: Seal: NOT FOR CONSTRUCTION 206 East 4th Street, Loveland, Colorado 80537 10/6/2021 11:17:54 AM A4.2BUILDINGELEVATIONS -FORT COLLINS NISSAN KIA5811 S COLLEGE AVE, FORT COLLINS, CO 8052521010 PLANNING SUBMITTAL Revision Number Revision Date 3/32" = 1'-0"A4.2 2 EXTERIOR ELEVATION - SOUTH 3/32" = 1'-0"A4.2 1 EXTERIOR ELEVATION - WEST EXTERIOR MATERIALS KEYNOTE MATERIAL MANUFACTURER PRODUCT NAME COLOR NAME LOCATION REMARKS ACM-1 ALUMINUM COMPOSITE METAL MITSUBISHI PLASTICS APOLIC 4334BSX3.5 SILVER METALLIC GENERAL FACADE - SITE SIGNAGE NOTE: DRY REVEAL SYSTEM ACM-2 ALUMINUM COMPOSITE METAL MITSUBISHI PLASTICS APOLIC 734L927 (FEVE) VALFLON 10742 RED FACADE ENTRY - SITE SIGNAGE NOTE: DRY REVEAL SYSTEM ACM-3 ALUMINUM COMPOSITE METAL MITSUBISHI PLASTICS APOLIC 732L878 (FEVE) VALFLON 11324 GRAY SERVICE DRIVE - GENERAL FACADE - ENTRY NOTE: DRY REVEAL SYSTEM B-1 BOLLARDS ID METALCO DIX BOLLARD STAINLESS STEEL SITE CF-1 PRE-FINISHED METAL COPING CAP COLOR TO MATCH ACM-1 SEE EXTERIOR ELEVATIONS CF-3 PRE-FINISHED METAL COPING CAP COLOR TO MATCH ACM-3 SEE EXTERIOR ELEVATIONS CMU-1 CONCRETE MASONRY UNIT BRAMPTON BRICK PROFILE SERIES CONCRETE BLOCK ABSOLUTE BLACK QUARTZ SERVICE BAYS D-1 FRONT ENTRY GLASS MAN DOORS CRL US ALUM ARCHITECTURAL PRODUCTS & SERVICES 08 4210 CRL WEDGE LOCK DRY GLAZE DOOR RAIL SYSTEM, DOOR PULL: STRAIGHT STYLE LADDER PULL 42LPBS STANDARD WEDGE LOCK DOOR RAIL: CRL DR4T12 4" TALL TAPERED GLASS AND ALUM FINISH COLOR TO MATCH PC-2 TIGER DRYLAC RAL 7024, DOOR PULL: POWDER COATED RAL 7024 MATCH DOOR RAIL: POWDER COATED RAL 7024 MATCH NEW VEHICLE DELIVERY & SHOWROOM ENTRY NOTE: SEE DRAWINGS FOR DOOR PULL SPECIFICATION D-2 INSULATED OVERHEAD COILING DOOR OVERHEAD DOOR CO STORMTITE AP MODEL 627 POWDER COATED TO MATCH P-5 PARTS RECEILING & SERVICE WORKSHOP D-3 INSULATED STOREFRONT MAN DOOR KAWNEER 500T INSULPOUR THERMAL ENTRANCE FINISH TO MATCH SF-1 SERVICE BAYS & STAIRWELL D-4 HIGH SPEED OVERHEAD COILING DOOR RYTEC RYTEC SPIRAL FV DOOR ALUM SLAT FRAMES WITH CLEAR POLYCARBONATE WINDOWS OIL CHANGE ENTRY D-5 GLASS SECTIONAL GARAGE DOOR OVERHEAD DOOR CO 521 SERIES ALUM SECTIONAL DOOR FINISH TO MATCH SF-1 SERVICE BAYS, SHOW ROOM, NEW VEHICLE DELIVERY TRACK TYPES VARY, SEE FLOOR PLANS D-6 INSULATED HOLLOW METAL SOLID DOOR & FRAME PAINTED TO MATCH ACM-3 BOH SERVICE AREAS GLASS TRANSOM WHERE SCHEDULED TO MATCH SF-1 D-7 SOLID SECTIONAL GARAGE DOOR WITH VISION WINDOWS OVERHEAD DOOR CO 596 SERIES THERMACORE SECTIONAL DOOR POWDER COATED TO MATCH P-5 BOH SERVICE AREAS TRACK TYPES VARY, SEE FLOOR PLANS D-8 SOLID SECTIONAL GARAGE DOOR OVERHEAD DOOR CO 596 SERIES THERMACORE SECTIONAL DOOR POWDER COATED TO MATCH ACM-3 BOH SERVICE AREAS DP-1 DOOR PULL SOURCED BY GC CUSTOM ITEM POWDER COATED PC-3 RAL 3031 MATCH MAIN ENTRY - VEHICLE DELIVERY - SERVICE WRITE UP EG-1 NISSAN LARGE TABLET SIGNAGE FRONT ELEVATION BY SEPARATE PERMIT, GC TO COORD POWER AS REQ'D EG-2 36" NISSAN WORDMARK SIGNAGE FRONT ELEVATION BY SEPARATE PERMIT, GC TO COORD POWER AS REQ'D EG-3 30" DEALER NAME SIGNAGE FRONT ELEVATION BY SEPARATE PERMIT, GC TO COORD POWER AS REQ'D EG-4 24" SERVICE SIGNAGE SERVICE ENTRY BY SEPARATE PERMIT, GC TO COORD POWER AS REQ'D MP-1 CORRUGATED METAL PANEL FINISH TO MATCH P-5 SERVICE BAYS P-5 PAINT SHERWIN WILLIAMS PRIMER: #E28W02600 PROMAR 200 LATEX PRIMER - PAINT: #A96W01251 DURATION - INTERIOR ACRYLIC LATEX PAINT EGGSHELL FINISH SW 7076 CYPERSPACE - COLOR TO MATCH RAL 7024 ALL EXTERIOR BUILDING SURFACES NOT COVERED W ACM - INCLUDING DOORS SF-1 CURTAIN WALL SYSTEM KAWNEER 1600UT SYSTEM 2 ULTRA THERMAL CURTAIN WALL SYSTEM GLASS: CLEAR 1" INFILL MULLIONS: PPG UC70743 DURANAR GRAPHITE GRAY (COLOR TO MATCH RAL 7024) GENERAL EXTERIOR - FACADE - SERVICE DRIVE SEE EXT ELEV FOR ADDITIONAL SYSTEM NOTES SF-2 STOREFRONT SYSTEM KAWNEER 451T SERIES THERMALLY BROKEN FRAMES GLASS: CLEAR 1" , MULLIONS: CLEAR ANODIZED ALUM GENERAL EXTERIOR - FACADE - SERVICE DRIVE FRONT GLAZED Issued For SD: Plot Date: Issued For DD: Issued For Permit: Issued For Construction: Seal: NOT FOR CONSTRUCTION 206 East 4th Street, Loveland, Colorado 80537 10/6/2021 11:18:50 AM A4.5EXTERIOR 3DPERSPECTIVES-FORT COLLINS NISSAN KIA5811 S COLLEGE AVE, FORT COLLINS, CO 8052521010 PLANNING SUBMITTAL Revision Number Revision Date A4.5 1 EXTERIOR 3D PERSPECTIVE - NORTHEAST A4.5 2 EXTERIOR 3D PERSPECTIVE - SOUTHEAST A4.5 4 EXTERIOR 3D PERSPECTIVE - NORTHWEST A4.5 3 EXTERIOR 3D PERSPECTIVE - SOUTHWEST A4.5 5 EXTERIOR 3D PERSPECTIVE - NORTHEAST AERIAL A4.5 6 EXTERIOR 3D PERSPECTIVE - SOUTHWEST AERIAL