HomeMy WebLinkAboutOFFICE AND LIGHT INDUSTRIAL AT TECHNOLOGY PARKWAY - PDP200016 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORT
Preliminary Drainage and Erosion
Control Report for
5041 Technology Parkway
Fort Collins, Colorado
September 29, 2021
September 29, 2021
Mr. Wes Lamarque
City of Fort Collins
Water Utilities--Storm water
700 Wood Street
Fort Collins, Colorado 80521
RE: Preliminary Drainage and Erosion Control Report for the 5041 Technology Parkway
Dear Wes:
We are pleased to submit to you, for your review and approval, this Preliminary Drainage and
Erosion Control Report for 5041 Technology Parkway. All computations within this report have
been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria.
We appreciate your time and consideration in reviewing this submittal. Please call if you have any
questions.
Respectfully,
Aspen Engineering
John Gooch, P.E.
Principal
TABLE OF CONTENTS
DESCRIPTION PAGE
I. GENERAL LOCATION AND DESCRIPTION 5
A. LOCATION 5
B. DESCRIPTION OF PROPERTY 5
II. DRAINAGE BASINS 6
A. MAJOR BASIN DESCRIPTION 6
B. EXISTING SUB-BASIN DESCRIPTION 6
III. DRAINAGE DESIGN CRITERIA 7
A. REGULATIONS 7
B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS 8
C. HYDROLOGIC CRITERIA 8
D. HYDRAULIC CRITERIA 8
E. VARIANCE 8
IV. DRAINAGE FACILITY DESIGN 9
A. GENERAL CONCEPT 9
B. SPECIFIC DETAILS 9
C. DETENTION POND 14
D. STREET CAPACITIES 15
V. STORM WATER QUALITY 16
A. GENERAL CONCEPT & SPECIFIC DETAILS 16
VI. EROSION CONTROL 17
A. GENERAL CONCEPT 17
VII. CONCLUSIONS 17
A. COMPLIANCE WITH STANDARDS 17
B. DRAINAGE CONCEPT 18
C. STORM WATER QUALITY 18
D. EROSION CONTROL CONCEPT 19
E. EROSION CONTROL ESCROW ESTIMATE 19
REFERENCES 20
APPENDIX
PAGE
VICINITY MAP, SOILS MAP A
RATIONAL METHOD HYDROLOGY B
POND CAPACITY CALCULATIONS & RATING CURVES, LID CALCULATIONS
(OUTLET STRUCTURES & STORM SEWER PIPE SIZING, ORIFICE SIZING, &
OVERFLOW WEIR SIZING IN FINAL DESIGN) C
RIPRAP, SWALE SIZING, & EROSION CONTROL
CALCULATIONS IN FINAL DESIGN D
EROSION ESCROW IN FINAL DESIGN E
PROPOSED DRAINAGE BASIN EXHIBIT,
EROSION CONTROL PLAN, & EROSION CONTROL NOTES AND
DETAILS SHEET F
5
PRELIMINARY DRAINAGE
AND EROSION CONTROL REPORT
FOR 5041 TECHNOLOGY PARKWAY
FORT COLLINS, COLORADO
I. GENERAL LOCATION AND DESCRIPTION
A. Location
The 5041 Technology Parkway site is bounded to the north by Precision Drive, to the
east by Technology Parkway, to the south by Rock Creek Drive, and to the west by
the Eye Center of Northern Colorado and the Windsong Memory Care Facility.
The project site can also be described as situated in the northwest quarter of Section
4, Township 6 North, Range 68 West of the 6th P.M., of the City of Fort Collins,
Larimer County, Colorado. Please refer to the vicinity map in Appendix A for the
site location.
B. Description of Property
The 5041 Technology Parkway project is comprised of an approximate 52,000 +/-
square foot building footprint along with associated parking lot, entry plazas and
outdoor site areas, and utility improvements, and a regional pond (Pond 501), all of
which is situated over approximately 6.72 acres and is contained within Lot 1 and
Tract A, of the proposed development area.
An additional 4.70 acres, situated west and north of Pond 501, will be subdivided
into two lots (Lots 2 & 3) for future development. The total area of the 5041
Technology Parkway project will account for approximately 11.04 acres (Basins 1-
17) being conveyed to the proposed Pond 501, located north of Rock Creek Drive
and south of Precision Drive. Offsite street runoff from Precision Drive (basins OS9,
OS12, and OS13) will also be ultimately piped to detention pond 501, once
development occurs, as applicable.
Currently, the 5041 Technology Parkway site consists of fallow agricultural land,
with an 18” storm sewer pipe, running along the south portion of the site, that serves
as an outfall from the Windsong development. An existing sanitary sewer line and
associated easement also exists along the western boundary of Lot 2, and provides
sewer service to the Windsong development.
6
The majority of existing topography of the HTP 5041 site (and future development
area) generally slopes from the northwest to southeast at approximately 0.50% to
0.80%.
II. DRAINAGE BASINS
A. Major Basin Description
The site lies within the McClellands Basin. The site drainage has been previously
accounted for in the Harmony Technology Park Site Master Plan (HTPSMP) and
associated storm drainage improvements shown in the Mainstreet Health and
Wellness project, dated February 18, 2015. The project drainage will be in
conformance with these two studies, in which Masterplan information can be found
in the East Harmony Portion of the McClellands Creek Master Drainage Plan
(August 1999).
Please refer to the Final Drainage Report for the Mainstreet Health and Wellness
Suites, dated by February 18, 2015, and the Final HTP Infrastructure Improvement
drainage report, dated November 4, 2015, for additional information, and as may be
applicable to the 5041 Technology Parkway project.
B. Existing Sub-Basin Description
The existing project site is within SWMM basin 801 of the HTP Masterplan report.
Existing basin 801 contains approximately 16.5 acres and was modeled with the
entire 16.5 acres having an imperviousness of 0.80, with an allowable 100-year
release rate of 7.5 cfs, for the basin area. This provides for an allowable release rate
of 0.45 cfs/acre for subbasins within SWMM basin 801.
The 5041 Harmony Technology Park site being developed is comprised of 11.04
acres for the 5041 Technology Parkway site (Lot 1), regional detention pond 501
(Tract A), and the two future, residual lots (Lots 2 and 3), which are located west of
pond 501. An additional 1.29 acres of offsite basins OS9, OS12, and OS13, shown
in the Mainstreet Health and Wellness Suites drainage report, are also accounted for
in this drainage study, thus providing for 12.33 acres of total basin areas being
conveyed to proposed regional pond 501. The allowable 100-year release rate for the
12.33 acres is 5.55 cfs, per the SWMM Model, for attributing basins.
The runoff from the existing 11.04 site area flows primarily from northwest to
southeast across the existing agricultural field, with the majority of runoff infiltrating
into the existing field, with any surface flow ponding up in the southeast corner of
the site and possibly entering the existing area inlet, located in the southeast corner of
the site. Offsite runoff from Precision Drive is captured in Type R inlets in sumps.
Flow from these inlets is piped to two-cobble stone dry wells at the south side of
Precision Drive to enhance infiltration into the field. With development of the 5041
7
site, the cobble pit at design point OS9 will remain in-place, while the cobble pit at
design point OS13 will be removed.
It's important to note that the Windsong Memory Care Facility and Eye Center of
Northern Colorado sites were developed and provide their own onsite water quality
and detention, prior to releasing into storm drain piping systems in Precision Drive
and along the north side of Rock Creek Drive. Both of these developments were
required to adhere to the HTP Masterplan report and SWMM model, which allows
for up to 0.45 cfs/acre for the 100-year release rates from these sites.
The 5041 Technology Parkway existing site basin areas will be conveyed to the
original SWMM Pond 501, but the required detention volume will be reduced from
the approved SWMM model to only account for the attributing site basin areas from
the 5041 Technology Parkway development (Lots 1-3 and Tract A), and offsite
basins OS9, OS12, and OS13 from Precision Drive.
Please refer to the HTPMSP report for masterplan details, as well as the Mainstreet
Health and Wellness Suites Final Drainage Report. Please see the rational
calculations (Appendix B) and the drainage exhibit (Appendix F) of this report for
the proposed drainage basins for the subject site.
III. DRAINAGE DESIGN CRITERIA
A. Regulations
The 5041 Technology Parkway project is being constructed in accordance with the
HTP Masterplan report and SWMM modeling for the overall HTP site. It’s
important to note that proposed Pond 501 is designed to detain and provide water
quality for the 5041 Technology Parkway site (basins 1-16), two future lots west of
Pond 501 (basin 17), and the offsite basins in Precision Drive (OS9, OS12, and
OS13). Pond 501 will serve as a regional water quality and detention pond and has
been sized to provide water quality and detention for 12.33 acres (as required by the
HTP Masterplan). Future development of the two residual lots will be required to
adhere to the McClellands Creek Master Drainage Plan and the Harmony
Technology Park Site Master Plan (HTPSMP), as well as HTP Masterplan SWMM
Model, which allows for a combined impervious ratio of 80% for the developed and
associated, adjacent roadway portions for the attributing parcels.
LID improvements are required for the developed portion of site. The two future lots
to the west of detention Pond 501 will be responsible for their own LID
improvements, when the lots are developed. It’s important to note that with future
development of Lot 2, the developer of Lot 2 will be required to remove the interim
cobble pit at design point OS9, and pipe the storm flow from basin OS9 through the
Lot 2 site and into proposed Pond 501.
8
B. Development Criteria Reference and Constraints
The criteria and constraints from the City of Fort Collins will be met. Water quality
and detention requirements for the site are being provided for via proposed Pond 501.
LID requirements are being met with the use of raingardens, which treat
approximately 75% of new, applicable LID impervious area within Lot 1, thus
meeting the 75% treatment area requirement, per City criteria. Future development
of Lots 2 and 3 will require additional BMP’s and LID measures be provided by
those developments, as may be applicable at that time.
C. Hydrologic Criteria
The Rational Method for determining surface runoff was utilized for the 5041
Technology Parkway improvements. The Rational Method data for offsite basins
OS9, OS12, and OS13 (in Precision Drive) from the Mainstreet Health and Wellness
Suites Final Drainage Report was utilized as input into the rational method
calculations for the 5041 Technology Parkway project. The 2-year and 100-year
storm event intensities have been calculated and will be utilized to calculate runoff to
size drainage structures, storm pipes, and curb cuts in final design. Routed runoff
flows will be calculated and presented in final design. The City of Fort Collins
intensity duration frequency curves were used to obtain rainfall data for each storm
specified.
It’s important to note that the future development of adjacent lots will be required to
meet the 80% impervious ratio for the developed condition of the lots, rather than
match the rational ‘c’ values shown in the rational calculations in Appendix B of this
report.
D. Hydraulic Criteria
All hydraulic calculations within this report have been prepared in accordance with
the City of Fort Collins Drainage Criteria and are also included in the Appendix.
Final sizing of storm sewer pipes, inlets, culverts, curb cuts, swales, and riprap and
erosion control calculations will be completed in final design. Water quality control
volume, detention pond volumes, LID volumes and stage storage calculations are
provided in the appendices of this report.
E. Variance
No variances are being requested for the project.
9
IV. DRAINAGE FACILITY DESIGN
A. General Concept
Seventeen proposed drainage basins (basins 1-17) will provide conveyance (or future
conveyance, as applicable) of runoff to the proposed LID Basins, then into the
proposed water quality and detention Pond 501, located north of Rock Creek Drive
and south of Precision Drive.
Pond 501 will provide water quality and detention for basins 1-17, and offsite basins
OS9, OS12 and OS13, with an overall impervious ratio of 67% for all the basins
combined.
A water quality and orifice-controlled outlet structure within Pond 501 will provide
the required water quality for Lots 1-3, Tract A, and offsite attributing areas, while
also providing a controlled release of 5.55 cfs to the existing storm sewer that runs
west-east along the southern property boundary (north of Rock Creek Drive). The
5.55 cfs release from Pond 501 will discharge to the existing 18” RCP near the
southeast corner of the Lot 1.
Pond 501 provides approximately 2.73 acre-feet of combined water quality and
detention volume for the contributing 12.33 acres. Pond 501 has been sized to detain
up to the 100-year event, while receiving the 100-year flow from the 12.33 acre
masterplan area (at a combined 67% impervious ratio).
Upon development of basins 1-17 (proposed and future lots), runoff from these
basins will be routed to Pond 501 via proposed storm sewer inlets, curb cuts, and
piping (from roof drain connections and LID basins).
Please refer to the proposed drainage basin exhibit in Appendix F, and the rational
calculations in Appendices B for the proposed site improvements, and future
development areas.
B. Specific Details
Basins 1:
Runoff from the paved parking lot areas, drive aisles, landscaped areas, and sidewalk
areas will be conveyed to three Type R inlets in Basin 1, located along the east curb
and gutter. Flow will be intercepted at the inlets, in a sump condition, and enter the
underground storm sewer. Piped runoff will flow north, west, then south and
discharge into detention Pond 501. Riprap protection will be constructed at the
outfall into detention Pond 501.
Runoff from approximately 3,000 SF of basin 1 will be intercepted by a curb cut and
concrete chase to divert runoff away from the entry driveway and will discharge to
10
the west flowline of Technology Parkway. Approximately 300 SF of the entry drive,
not intercepted by the curb cut and chase, will flow east into the west flowline of
Technology Parkway, and will be intercepted by an existing Type R storm inlet at
design point 502. The entire basin area for basin 1 has been utilized for water quality
and detention pond volume sizing.
Basins 2 & 3:
Basin 2 is comprised primarily of landscape area, and one concrete sidewalk
connection. Runoff from basin 2 will sheet flow over the walk and grass parkway to
enter the west curb and gutter of Technology Parkway, then flows south to an
existing Type R inlet.
Basin 3 runoff from paved drive aisle, landscaped areas, and sidewalk areas will be
conveyed east to Technology Parkway. Landscaped area will sheet flow over the
walk and grass parkway, to enter the curb and gutter in the public street. Runoff
from the paved drive aisle will be conveyed southeast into the south curb and gutter
in the drive aisle, and discharge to the west curb and gutter of Technology Parkway.
Runoff from approximately 590 SF of area from basin 3 will drain east, into the
existing curb and gutter along the west flowline in Technology Parkway. Runoff
from basin 2 and basin 3 will flow south to an existing Type R inlet at design point
502, in Technology Parkway. Flow will ultimately discharge to the existing
detention pond 110 of the HTP Masterplan, near the northwest corner of Lady Moon
Drive and Rock Creek Drive. Runoff is treated for water quality in detention pond
110.
It should be noted that the entire basin area for basins 2 and 3 has been utilized for
water quality and detention pond volume sizing.
Basins 4:
Runoff from landscaped areas, and sidewalk areas will be conveyed north toward a
swale and raingarden. Flow on the east side of the basin will concentrate in a grass
swale, flow west and enter the north end of the grass-lined raingarden. The west side
of the basin will sheet flow to the raingarden. In larger storm events, the excess
runoff that surcharges the raingarden, will overflow into a storm inlet and will be
piped west, then south and into Pond 501. Riprap protection will be constructed at
the pipe outfall in Pond 501.
Basin 5:
Runoff from paved parking lot areas, landscape areas, and drive aisle areas will
concentrate in the west curb and gutter, pass through a curb cut in the west flowline,
and enter an area inlet. Flow will be piped west, and then south and into detention
Pond 501.
11
Approximately 350 SF of the drive aisle, not intercepted by the inlet, will flow north
to the south flowline in Precision Drive and will be intercepted by an existing storm
inlet at design point OS13. All runoff from basin 5, excluding the 350 SF of area
mentioned above, will be detained and treated for water quality in Pond 501.
However, the entire basin area has been utilized for water quality and detention pond
volume sizing.
Basins 6 & 7:
Runoff from paved parking lot areas, drive aisles, landscaped areas, and sidewalk
areas will be conveyed to two locations in Basin 6, a Type R inlet located along the
east curb and gutter, and a curb cut with concrete chase in the entry drive. The
majority of the runoff from basin 6 will be intercepted by the inlet , in a sump
condition. Runoff will enter an underground storm sewer, flow southwest, west, then
northwest, and discharge to Pond 501.
Runoff from approximately 3,000 SF of basin 6, comprised of paved and landscape
area, will be intercepted by a curb cut and concrete chase to divert runoff away from
the entry driveway and will discharge to the west flowline of Technology Parkway.
Approximately 400 SF of the entry drive, not intercepted by the curb cut and chase,
will flow east into the west flowline of Technology Parkway. Runoff from both
areas will be intercepted by an existing Type R storm inlet at design point 502.
Basin 7 is comprised primarily of landscape area, with small areas of concrete
sidewalk. Runoff from basin 7 will sheet flow over the walk and grass parkway to
enter the west curb and gutter of Technology Parkway, then flows south to an
existing Type R inlet at design point 502.
It should be noted that the entire basin area for basins 6 and 7 has been utilized for
water quality and detention pond volume sizing.
Basins 8 & 9:
Runoff from paved parking lot areas, drive aisles, landscaped areas, and sidewalk
areas will concentrate at two sump locations in Basin 8, on the south curb and gutter.
Flow will pass through curb cuts to enter a grass-lined raingarden in basin 8. In
larger storm events, the excess runoff that surcharges the raingarden, will overflow
into a storm inlet and will be piped west, then northwest and into Pond 501.
Permanent erosion control fabric protection will be constructed in the raingarden at
the curb cut outfall points.
Basin 9 is comprised primarily of landscape and raingarden area, with a shallow
swale that will convey runoff into the LID basin.
12
Basin 10:
Runoff from the paved parking lot areas and drive aisle areas will be conveyed south
and into the curb and gutter, with the majority of runoff passing through a curb cut at
design point 10. Flow will then be conveyed east in a shallow swale to the
raingarden in basin 9. Runoff from approximately 400 SF of area from basin 10 will
drain south and flow over the sidewalk and into the existing curb and gutter along the
north flowline in Rock Creek Drive. Runoff will flow east to existing combination
inlets, in Rock Creek Drive, that discharge to the existing detention pond 110 of the
HTP Masterplan, near the northwest corner of Lady Moon Drive and Rock Creek
Drive.
Basin 11:
Runoff from the entire roof of the building will be captured by roof drain piping and
will connect to an underground storm sewer pipe that discharges to a raingarden
along the toe of slope in Pond 501. In larger storm events, the raingarden will crest
the bank of the raingarden and will overflow into Pond 501.
Basins 12, 13 & 14:
Runoff from paved parking lot areas, drive aisles, and sidewalk areas will
concentrate at sump locations within each basin. Basins 12 and 13 will drain to a
Type R inlet constructed at the sump location within basin 12 and 13. Flow is piped
west and discharges to a raingarden at the toe of slope within Pond 501. In larger
storm events, the raingarden will overflow into Pond 501.
Basin 14 runoff will pass through a curb cut with concrete sidewalk chase to enter a
grass-lined raingarden in basin 15. In larger storm events, the raingardens will
overflow the west berm of the raingarden and drain into Pond 501. Permanent
erosion control fabric protection will be constructed at the curb cut outfall points.
Basin 15:
Runoff from landscaped area and sidewalk area will runoff as sheet flow to the west.
Portions of the basin adjacent to raingardens will drain to the raingardens within
basins 15 and 16. Basin area, beyond the limits of the raingardens, will drain to
adjacent parking lot and ultimately drain to Pond 501.
Basin 16:
Basin 16 includes the grass-lined area of detention pond 501. Runoff from the site
will be conveyed to Pond 501 via curb cuts, storm drain piping, and raingarden
underdrains and overflow conditions. As discussed in Basin 11, a raingarden will be
constructed at the pipe outfall for treatment of the roof runoff before entering pond
501.
Basin 17:
Runoff from the undeveloped basin 17 (future developed Lots 2 and 3) will sheet
flow overland to the southeast and into Pond 501. Runoff from basin 17 provides for
13
an allowable 80% impervious ratio. Upon development of future lots 2 and 3, runoff
shall be directed to Pond 501.
Offsite Drainage
Basin OS9:
Runoff from offsite basin OS9 is conveyed east along the south half of Precision
Drive, enters an existing 10’ Type R inlet, and is piped to a cobble infiltration pit.
With the 5041 Technology Parkway development, the cobble pit will remain in-
place. However, with the future development of Lot 2, the cobble pit will be
removed, and the Lot 2 developer shall pipe the flow from offsite basin OS9 to
detention Pond 501, where runoff will be treated for water quality and detained.
Basins OS12 & OS13:
Runoff from offsite basins OS12 and OS13 is conveyed east in curb and gutter along
the north and south sides of Precision Drive, with flow entering 5’ Type R inlets at
design points OS12 and OS13. The combined flow from basins OS12 and OS13 is
piped to the south side of Precision Drive and enters a cobble infiltration basin. With
the 5041 Technology Parkway development, the existing cobble pit will be removed,
and runoff will be piped to Pond 501, where runoff will be treated for water quality
and detained.
Basin 502:
Runoff from offsite basin 502 is conveyed north and south in the west flowline of
Technology Parkway, enters an existing 5’ Type R inlet, and is piped east and into
the existing detention pond 110 (of the HTP Masterplan), located near the northwest
corner of Lady Moon Drive and Rock Creek Drive, and south of the Custom
Blending site. Runoff from offsite basin 502 is treated for water quality and detained
in existing pond 110.
Landscape area runoff from on-site basins 2 and 7 will enter basin 502. In addition,
portions of basins 1, 3, and 6 will enter basin 502. The onsite areas are accounted for
in Pond 501 for water quality and detention and the contributing runoff to basin 501
is minimal.
Overflow Conditions:
Basins 1 & 6:
Should the curb cuts, inlets or pipes in basins 1 and 6 become clogged, runoff from
basins 1 and 6, will spill east over the sidewalk and enter the west flowline of
Technology Parkway (basin 502). Flow will drain to the existing 5’ Type R Inlet and
will discharge to the existing detention pond 110 (of the HTP Masterplan), located
near the northwest of the intersection of Lady Moon Drive and Rock Creek Drive,
and south of the Custom Blending site.
14
Basins 4-5:
Should the inlet or pipes in basin 4 become clogged, runoff will spill north over the
sidewalk and enter the south flowline of Precision Drive. Flow will drain in the curb
and gutter to the existing 5’ Type R Inlet at design point OS13, which will convey
flow to Pond 501.
If the inlet or pipe in basin 5 were to plug, runoff will drain north through the drive
and enter the south flowline of Precision Drive. If the inlet or pipe in basin 15 were
to plug, runoff will flow on the surface to Pond 501.
Basins 8, 9 & 10:
Should the curb cuts in basin 8 plug, runoff will overtop the curb and enter the
raingarden in basin 9. Should the inlet or pipes in basins 9 become clogged, runoff
from basins 8, 9 and 10, will spill south over the sidewalk and enter the north
flowline of Rock Creek Drive. Flow will drain in the curb and gutter to the existing
combination inlets in Rock Creek Drive, which will discharge to the existing
detention pond 110 (of the HTP Masterplan), located near the northwest of the
intersection of Lady Moon Drive and Rock Creek Drive, and south of the Custom
Blending site.
Basin 11-14:
Should the roof drains plug in basin 11, overflow from the roof will flow overland to
the west through basin 13. Should the curb cuts or inlets in basins 12-14 plug, runoff
will overtop the curb and enter the raingarden in basin 15 and 16. Upon the
raingarden being surcharged, runoff will overflow west and into Pond 501.
Basin 16:
Should the outlet structure in Pond 501 plug, overflow from Pond 501 will spill south
to Rock Creek Drive, will flow east in Rock Creek Drive.
Basin 17:
Basin 17 is vacant land and flow will enter pond 501. Please refer to basin 16 for
overflow path.
C. Detention Pond
Pond 501 has been sized to provide water quality and detention for the proposed
12.33 acres of the 5041 Technology Parkway development, which includes the 2 lots
for future development (4.70-acres), and the runoff from offsite basins in Precision
Drive (1.29 acres), as shown on the Drainage Exhibit. Pond 501 will provide 2.73
acre-feet of combined water quality and detention volume (0.27 acre-feet of water
quality volume). Please refer to the Pond 501 rating curve in Appendix C for the
pond sizing and elevation information.
15
Pond 501 will allow for water quality and detention up to the 100-year event (for
12.33 acres of developed area) and will contain a single outlet control structure. The
structure will be a water quality control outlet structure and will have a water quality
plate designed to provide up to 0.27 acre-feet of water quality volume (for 12.33
acres) at an elevation of approximately 4913.39. The 100-year WSEL for the 12.33
acre development will be approximately 4916.90, providing 2.73 acre-feet of
volume. The release rate will be restricted to 5.55 cfs at the 100-year storm event.
The structure will be constructed with an orifice control plate at the back of the
structure over the entrance of the outlet pipe. Orifice sizing for the water quality
outlet structure and outlet pipe will be provided in final design. The allowable release
rate of 5.55 cfs will discharge to the existing storm sewer system, constructed along
the south side of the property, north of Rock Creek Drive, as allowed by the HTP
Masterplan, and as constructed with the Windsong development.
It’s important to note that the 100-year WSEL for Pond 501 for the ultimate build-out
of the 12.33 acre area (for both onsite and offsite attributing basins) is approximately
4916.90. Pond 501 and the orifice control plate are being constructed for the
ultimate build-out condition of the 12.33 acres at a combined impervious ratio of
67%. The allowable impervious ratio for the two future lots (Lots 2 and 3) is 80%.
The emergency spillway will be sized at final design and will be constructed along
the south side of Pond 501. The proposed spillway top-of-weir elevation will be
approximately 4919.00, thus allowing overtopping flow to pass over the sidewalk
and enter the flowline of Rock Creek Drive. In the future development of Lot 3, a
shared access to Lot 1 is anticipated to be constructed. At that time the overflow
path shall be across the drive and walk to Rock Creek Drive. Overflow would be
intercepted by the combination inlets west of the Lady Moon Drive intersection and
conveyed to the existing detention pond 110, located northwest of the Lady Moon
Drive/ Rock Creek Drive intersection and south of Custom Blending.
D. Street Capacities
Street capacity calculations are not required for the project as there are no public
street improvements.
16
V. STORM WATER QUALITY
A. General Concept & Specific Details
The water quality aspect of stormwater runoff must be addressed on all final utility
plans. Therefore, the proposed water quality/ detention pond (Pond 501) will have
adequate capacity, in accordance with the HTP SWMM Model, and will provide all
the required water quality and detention up to the 100-year event for the developed
condition of the subject site and offsite adjacent areas (up to a combined impervious
ratio of 67% for onsite parcel areas and associated, adjacent roadways) (total of
12.33 acres), prior to releasing flows downstream. It’s important to note that the
two residual future lots (Lots 2 and 3) are allowed up to 80% imperviousness for the
specific lot areas, and have been modeled as such in this report.
Best Management Practices (BMP’s) for the treatment of stormwater will be
provided in the 5041 Technology Parkway site through the utilization of raingardens
constructed around the north, south and west sides of the lot to treat the first flush
runoff from impervious paved area and building roof area. Upon the raingardens
filling up, overflow in the north and south raingardens, will be captured by area inlets
placed at the 1’ depth mark on the sides of the raingardens to convey overflow to
Pond 501. The raingarden within basins 15 and 16 will overflow the west berm and
discharge directly into Pond 501.
Flow from the raingardens and other areas of the site will be conveyed to a grass-
lined detention pond (Pond 501). Pond 501 will be equipped with a 40-hour
extended detention structure with a water quality control orifice plate, and a single
stage orifice on the outlet structure, which will restrict the release rate from the site to
5.55 cfs.
These water quality features/structures will provide a mechanism for pollutants to
settle out of the stormwater runoff before flows are directed downstream to the
McClelland’s Drainage Basin.
Best Management Practices (BMP's) for the treatment of stormwater runoff shall also
be provided with development of Lots 2 and 3 in the future, which may include
grass/ sod-lined swales with soft pans, riprap pads at culvert discharge points, and
permanent erosion control fabric at curb cuts and swale entrances into Pond 501.
Please refer to the Erosion Control Plan for onsite BMP’s and LID’s for the 5041
Technology Parkway project, and future plans by others for other BMP’s and LID’s
attributable to future, development of the two west lots (Lots 2 and 3).
17
VI. EROSION CONTROL
A. General Concept
The subject site soils are classified as Hydrologic Group C with an erosion K factor
ranging from 0.28 to 0.30. The Wind Erodibility Group is rated 6 according to the
USDA Soil Properties. The potential exists for erosion problems during construction
but should be minimal after completion of proposed Pond 501. Silt fence will be
installed along the entire boundary of the grading area, as shown in the erosion
control plan, to prevent sediment from leaving the project area. Gravel tracking pads
will also be placed at each of the three entrances/exits to the 5041 Technology
Parkway site. Gravel inlet filters will be placed at area inlets and Type R inlets on
the site and at the offsite inlets on Precision Drive, immediately west of the site
entrance, and on Technology Parkway east of the site. Rock sock filters will be
installed at each of the curb cuts to minimize sediment entering chases, raingardens,
and Pond 501. Riprap will be installed at concentration points (curb cuts and pipe
outlets) to minimize erosion and increase soil stabilization.
VII. CONCLUSIONS
A. Compliance with Standards
All computations within this report have been completed in compliance with the City
of Fort Collins Storm Drainage Design Criteria.
The City of Fort Collins Storm Water Utility will not maintain the private on-site
storm drainage facilities within the subject site. The owners of the subject site will
maintain their on-site storm drainage facilities on a regular basis. The following
shall be implemented for the private stormwater improvements’ operations/
maintenance procedures for the project on an annual or bi-annual basis:
1) Storm Sewer Inlets, pipes and flared-end-sections, curb cuts and concrete
sidewalk culverts/chases, structures, manholes, and the water quality/ outlet
control structures, as may be applicable, shall be cleaned through the removal
of debris and sediment from the associated items to allow for adequate
drainage through the site to the interim facilities.
2) Pond sedimentation/ silting shall be removed to allow for adequate drainage
along the bottom of the ponds and raingardens. Grass scrubbing of the ponds
may be required to remove sediment and promote grass growth.
3) Re-vegetation through the use of Natural Seeding/ Sod shall be provided for
disturbed areas and other permanent erosion controls shall be provided for
18
areas where erosion has taken place and requires remediation back to the
proposed condition shown in the plans.
The Stormwater Operating/ Maintenance Procedures listed above are guidelines to
the minimum procedures that shall be implemented for the 5041 Technology
Parkway project, with these and additional measures being utilized on an as-needed
basis.
B. Drainage Concept
The proposed drainage concepts presented in this study and shown on the utility
plans, adequately provide for the transmission of developed runoff from the proposed
site, future lots to the west, and from offsite attributing basins to detention pond 501.
The proposed storm sewers and surface conveyances will provide for the 100-year
developed flows from the onsite and offsite basins to reach the proposed raingardens
and water quality/detention pond, prior to being released to the existing storm sewer
at the release rate of 5.55 cfs, established by the HTP drainage Masterplan.
If groundwater is encountered at the time of construction, a Colorado Department of
Health Construction Dewatering Permit will be required.
C. Storm Water Quality
The preliminary design for the 5041 Harmony Technology Park project has
addressed the water quality aspect of stormwater runoff. The proposed grass-lined
rain gardens and detention pond with extended detention and water quality, will
provide an opportunity for stormwater pollutants to filter out of the stormwater
runoff before flows are directed downstream to Fossil Creek Reservoir Inlet Ditch.
Furthermore, the proposed grass-sod-lined swales, riprap pads at culvert outlets,
permanent erosion control fabric at curb cuts, and other erosion control measures
which may be used for slope stabilization, will provide additional mechanisms for
pollutants to settle out of the stormwater runoff before flows are directed south and
ultimately to Fossil Creek Reservoir Inlet Ditch.
It’s important to note that in the interim condition the two undeveloped lots (Lots 2
and 3), west of Pond 501, will convey their flow across the vacant grass
field/vegetated area, as historically occurs. It is anticipated that infiltration of runoff
into the soil will occur during minor storm events, with larger storm events possibly
providing for runoff from these two lots directly into Pond 501. Infiltration into the
existing field during the minor events, as well as the water quality provided for in
Pond 501 for these two lots, will promote and maintain water quality for these two
lots and the development.
19
D. Erosion Control Concept
Proposed erosion control concepts have been provided for and adequately provide for
the control of wind and rainfall erosion from the 5041 Harmony Technology Park
development. Through the construction of the proposed erosion control concepts, the
City of Fort Collins standards will be met. The proposed erosion control concepts
presented in this report and shown on the erosion control plan are in compliance with
the City of Fort Collins Erosion Control Criteria.
E. Erosion Control Escrow Estimate
The Erosion Control Escrow Estimate for the 5041 Harmony Technology Park
project will be provided in final design.
20
REFERENCES
1. Storm Drainage Design Criteria and Construction Standards by the City of Fort
Collins, Colorado, May 1984, Revised January 1997, & Associated UDFCD Updates
and New City of Fort Collins Stormwater Criteria manual, adopted January 2012.
2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins,
Colorado, January 1991, Revised January 1997, & Associated UDFCD Updates and
New City of Fort Collins Stormwater Criteria manual, adopted January 2012.
3. Urban Storm Drainage Criteria Manual Volume 1; Urban Drainage and Flood
Control District, Denver, Colorado, June 2001.
4. Urban Storm Drainage Criteria Manual Volume 2; Urban Drainage and Flood
Control District, Denver, Colorado, June 2001.
5. Urban Storm Drainage Criteria Manual Volume 3, Best Management Practices;
Urban Drainage and Flood Control District, Denver, Colorado, August 2011.
6. East Harmony Portion of McClellands Basin 100-Year Master Plan, by Icon Inc.,
Fort Collins, Colorado, August 1999.
7. Final Drainage and Erosion Control Report, Harmony Technology Site Master Plan,
by Stantec Consulting, May 19, 2008.
8. Final Drainage and Erosion Control Study for Harmony Technology Park Third
Filing, by Stantec Consulting, May 19, 2008.
9. Final Drainage and Erosion Control Report for Mainstreet Health & Wellness Suites,
by Aspen Engineering, dated February 18, 2015.
TECHNOLOGY PARKWAY
(85' ROW)PRECISION DRIVE(66' ROW)PROPERTY BOUNDARYROCK CREEK DRIVE(ROW VARIES)9' UTILITY EASEMENT(REC. NO. 2001085362)16' DRAINAGE EASEMENT(REC. NO. 20160049345)UTILITY EASEMENT(REC. NO 20080041258)SANITARY SEWER EASEMENT(REC. NO. 20160048879)LOT 1WINDSONG AT ROCK CREEK(RECEPTION NO. 2016050565)LOT 1EYE CENTER OF NORTHERNCOLORADO SUBDIVISION(RECEPTION NO. 20160032638)UNPLATTED(HARMONY TECHNOLOGY PARK LLC)LOT 1MAINSTREET HEALTH & WELLNESS SUITES(RECEPTION NO. 20150031289)LOT 1
HARMONY TECHNOLOGY PARK 3RD FILING FIRST REPLAT
(RECEPTION NO. 20120001483)
LOT 1
HARMONY TECHNOLOGY PARK 5TH FILING
(RECEPTION NO. 20170034697)UNPLATTED(POUDRE R-1 SCHOOL DISTRICT)PROPERTY BOUNDARYPROPERTY BOUNDARYPROPERTY BOUNDARYDRAINAGE & UTILITY EASEMENT(REC. NO 20080041257)T(2')(2')PROPOSED BUILDINGPOND 501OS9OS7OS12OS13OS14OS15LOT 1LOT 2LOT 3TRACT A5020.64AC50215
12
13 14
16 17
18 152014161718191718
1919
1919
20
20
20
18
19
1716161717
18161718
1716171818 1920181920
18
1
9
2018
192020
201011
12 132018192
0
18
1819 151513 1616 1717 1814 192019
18
20
19
18 1820
18
19
1718151416171818
18
17
18172018
18
15
14
14
15
1415
15
17
1
7
17
16
16
16
17
1213148a8b6b1c1b17101611921d6a415537174.700.80161.260.25111.200.9040.480.3860.520.74100.050.85140.250.80130.710.92120.200.84OS140.070.66OS150.070.66OS120.480.72OS130.490.73OS90.320.8390.210.3280.310.7720.060.2930.070.4850.100.8810.430.74150.350.4170.140.261aDRAINAGE & UTILITY EASEMENT(REC. NO 20080071164)ASPEN0'SCALE: 1" = 40'40'80'14.5'14.5'LEGENDEXISTING CONTOURSNEW INTERMEDIATE CONTOURS1920NEW INDEX CONTOURSPROPOSED FLOWLINEEX RIGHT-OF-WAY/ PROPERTY BOUNDARYPROPOSED DRAINAGE BASIN BOUNDARYLINESPROPOSED STORM PIPEEXISTING STORM PIPE & MANHOLERDPROPOSED ROOF DRAIN AND STORM PIPE1.PROPOSED ELEVATIONS SHOWN ARE RELATIVE TO A DATUM OF 4900 FEET, AND ARE BASED ON THEBENCHMARKS DESCRIBED ON SHEET C-001.2.THE DRAINAGE BASINS SHOWN ON THIS EXHIBIT WILL BE CONVEYED TO DETENTION POND 501, LOCATEDBETWEEN THE DEVELOPED AND UNDEVELOPED AREAS OF THE SITE. THE DEVELOPED SITE RUNOFF ANDOFFITE BASIN RUNOFF IS CONVEYED TO THE PROPOSED DETENTION AND WATER QUALITY POND VIAOVERLAND FLOW, PIPE AND INLET SYSTEMS, AND PROPOSED SWALES. DRAINAGE DESIGN FOR THEPROPOSED SITE IS IN ACCORDANCE WITH THE HARMONY TECHNOLOGY PARK SITE MASTER PLAN (HTPSMP)AND ASSOCIATED DRAINAGE CONDITIONS IN THE MAINSTREET HEALTH AND WELLNESS PROJECT. WATERQUALITY AND DETENTION IS BEING PROVIDED IN PROPOSED POND 501. THE HTPSMP SPECIFIED ANALLOWABLE IMPERVIOUS RATIO OF UP TO 80% FOR SWMM BASIN 801. THE CALCULATED IMPERVIOUS RATIOIS 67% FOR THE 5041 HARMONY TECHNOLOGY PARK SITE AND OFFSITE ATTRIBUTING BASINS, ANDTHEREFORE, IS IN COMPLIANCE WITH THE PREVIOUSLY APPROVED MASTER PLAN STUDY FOR THIS AREA.3.PLEASE REFER TO THE RATIONAL METHOD CALCULATIONS FOR PRELIMINARY BASIN FLOW CALCULATIONS.ROUTED FLOWS WILL BE PROVIDED IN FINAL DESIGN.4.12" OF CDOT CLASS 'A' BEDDING MATERIAL SHALL BE PLACED UNDER ALL RIPRAP SHOWN.5.ROOF DRAINS FROM THE PROPOSED BUILDING WILL CONNECT TO AN UNDERGROUND STORM SEWER ANDWILL DISCHARGE DIRECTLY INTO DETENTION POND 501.6.RUNOFF FROM THE SITE WILL DRAIN TO LOW POINTS AND PASS THROUGH CURB CUTS, SIDEWALK CHASES,AND SWALES BEFORE ENTERING STORM PIPES AND RAINGARDENS, WHICH ULTIMATELY DISCHARGE TO THEPROPOSED DETENTION POND 501. PERMANENT GEOTEXTILE FABRIC AND GRASS LINED DRAINAGE CHANNELSWILL ENHANCE EROSION CONTROL WITHIN THE SITE LIMITS. SITE BMP'S WILL BE IMPLEMENTED TO REDUCESEDIMENT TRANSPORT OFFSITE, AND WILL BE SHOWN IN THE FINAL EROSION CONTROL PLAN/EXHIBIT.7.ALL PROPOSED STORM DRAINAGE PIPES AND STRUCTURES (OUTSIDE OF PLATTED ROW) WILL BE PRIVATELYOWNED AND MAINTAINED BY THE OWNER (MAVD). THE EXISTING SOUTH STORM SEWER SYSTEM, PASSINGTHROUGH THE SITE, WILL BE OWNED AND MAINTAINED BY MAVD. ALL EXISTING STORM SEWER WITHIN PUBLICROW, WILL BE OWNED AND MAINTAINED BY THE CITY OF FORT COLLINS.8.OFFSITE BASIN 502 IS SHOWN FOR REFERENCE PURPOSES ONLY. RUNOFF FROM BASIN 502 IS CONVEYED TOEXISTING SWMM POND 110, LOCATED SOUTH OF THE CUSTOM BLENDING SITE.NOTES:PROPOSED DRAINAGE BASIN SUMMARY TABLE:PROPOSED DRAINAGE BASIN IDACRES / 'C' VALUEPROPOSED DRAINAGE DESIGN POINTDRAINAGE FLOW DIRECTIONDRAINAGE SWALE0.740.431PROPOSED LID SUMMARY TABLE:SHEET No:PROJECT/ LOCATION:
DRAWING:OFCHECKED BY:DESIGNED BY:DRAWN BY:DESCRIPTION OF REVISION:DATE:REVISED BY:APPROVED BY:REV. #
1
2
3
4
5
6
7
P
R
E
L
IM
INARYNOT
FOR
CON
S
T
RU
C
T
IONproject no:date: FIFTY FORTY ONE TECHNOLOGY PARKWAY
FORT COLLINS, COLORADO
DRAINAGE EXHIBITC-0101013SEPTEMBER 29, 2021100-004TWJRGJRGPROPOSED POND SUMMARY TABLE:PONDDESC100-YRWSEL.(FT)VOLUMEPROVIDED(AC-FT)4916.902.73DETENTION POND2.68501*VOLUMEREQUIRED(AC-FT)WQCVWSEL(FT)4913.390.27WQCV(AC-FT)*POND 501 IS SIZED TO PROVIDE DETENTION AND WATER QUALITY FOR 12.33 ACRES OF ATTRIBUTABLE AREA(BASINS1-17) FOR THE HARMONY TECHNOLOGY PARK 5041 DEVELOPED AREA AND INCLUDES A TOTAL OF 1.29ACRES (BASINS OS9, OS12 & OS13) OF OFFSITE AREA.
TTTECHNOLOGY PARKWAY
(85' ROW)PRECISION DRIVE(66' ROW)ROCK CREEK DRIVE(ROW VARIES)PROPERTY BOUNDARYUTILITY EASEMENT(REC. NO 20080041258)PROPERTY BOUNDARYPROPERTY BOUNDARYPROPERTYBOUNDARYPROPOSED BUILDING427 LF SILT FENCEALONG NORTHCURB OF ROCK CREEK DRIVE610 LF SILT FENCE ALONG NORTHCURB OF ROCK CREEK DRIVE ANDEAST CURB OF TECHNOLOGY PKWY643 LF SILT FENCE ALONG SOUTHCURB OF PRECISION DRIVE ANDEAST CURB OF TECHNOLOGY PKWY1220 LF SILT FENCE ALONG SOUTH CURBOF PRECISION DRIVE AND AROUNDOUTER WEST EDGE OF PROPOSED PONDDRAINAGE & UTILITY EASEMENT(REC. NO 20080041257)DRAINAGE & UTILITY EASEMENT(REC. NO 20080071164)INSTALL OUTLET GRAVEL FILTER(SEE DETAIL, SHEET C-007)LOT 1LOT 2LOT 3TRACT A15
12
13 14
16 17
18 152014161718191718
1919
1919
20
20
20
18
19
1716161717
18161718
1716171818 1920181920
18
1
9
2018
192020
201011
12 132018192
0
18
1819 1515
13
1616 1717 1814 1920
1918
20
19
18 1820
18
19
1718151416171818
18
17
18172018
18
15
14
14
15
1415
15
17
1
7
17
16
16
16
17
IPIPIPIPVTCVTCRSRSIPRSRSVTCRSRSRSRRRRGFGFGFGFGRADING & UTILITY EASEMENT(REC. NO. 20150029090)SANITARY SEWER EASEMENT(REC. NO. 20160048879)9' UTILITY EASEMENT(REC. NO. 2001085362)16' DRAINAGE EASEMENT(REC. NO. 20160049345)IPIPIPIPIPIPIPRRASPEN0'SCALE: 1" = 30'30'60'SHEET No:PROJECT/ LOCATION:
DRAWING:OFCHECKED BY:DESIGNED BY:DRAWN BY:DESCRIPTION OF REVISION:DATE:REVISED BY:APPROVED BY:REV. #
1
2
3
4
5
6
7
P
R
E
L
IM
INARYNOT
FOR
CON
S
TRU
CT
IONproject no:date: FIFTY FORTY ONE TECHNOLOGY PARKWAY
FORT COLLINS, COLORADO
EROSION CONTROL PLANC-005513SEPTEMBER 29, 2021100-004JRGJRGJRGNOTES: .1.PERIMETER SILT FENCE SHALL BE INSTALLED ALONGPROPERTY BOUNDARY, AND IS SHOWN OFFSET FROMPROPERTY BOUNDARY ON THIS PLAN FOR CLARITY.·PERIMETER SILT FENCE AROUND SITE = 2653 LF2.ALL DISTURBED AREAS ARE TO BE SEEDED AND MULCHED.3.STOCK PILES SHALL NOT TO EXCEED 10' IN HEIGHT.4.ALL OFFSITE AREAS DISTURBED DURING CONSTRUCTION ARETO BE RE-VEGETATED AND RETURNED TO HISTORICCONDITION. STRAW WATTLES OR GRAVEL INLET FILTERS MAYBE INSTALLED (IF NECESSARY AND AS REQUIRED) ONEXISTING, OFFSITE/DOWNSTREAM INLETS.5.VEHICLE TRACKING PAD(S) LOCATIONS SHALL BE DETERMINEDBY THE CONTRACTOR, PRIOR TO CONSTRUCTION, AND SHALLBE INSTALLED ACCORDINGLY.6.SEE SHEET C-006 & C-007 FOR EROSION CONTROL NOTES ANDDETAILS.7.NORTH AMERICAN GREEN C350 FABRIC WILL BE UTILIZED ATMINOR OUTFALL LOCATIONS SHOWN, WITH RIPRAP UTILIZEDWHERE LARGER STORM FLOWS WILL DISCHARGE TO THEPROPOSED DETENTION POND.8.PERMANENT STORMWATER CONTROL MEASURES SUCH ASRAINGARDENS, BIOSWALES OR BIORETENTION PONDS, SHALLBE CONSTRUCTED IN THE LAST PHASE OF CONSTRUCTION ONTHE SITE TO MINIMIZE THE POTENTIAL FOR SEDIMENTATION.9.NO DEBRIS OR MUD SHALL BE TRACKED ONTO ADJACENTSTREETS AND ANY TRACKING THAT DOES OCCUR, WILL BECLEANED IMMEDIATELY BY THE CONTRACTOR.LEGEND .INSTALL VEHICLE TRACKING PADINSTALL SILT FENCEINSTALL CONCRETE WASHOUTHAY OR STRAW DRY MULCH (1-5%)INSTALL 12" STRAW WATTLE CHECK DAMLIMITS OF DISTURBANCEINSTALL CURB INLET GRAVEL FILTERINSTALL AREA INLET GRAVEL FILTERPROPOSED DIRECTION OF SURFACE FLOWINSTALL ROCK SOCK FILTERINSTALL GRAVEL CURB CHECK BAGINSTALL NORTH AMERICAN GREEN C350PROPOSED MAJOR CONTOUR - 5 FT INTERVALPROPOSED MINOR CONTOUR - 1 FT INTERVALEXISTING MAJOR CONTOUR - 5 FT INTERVALEXISTING MINOR CONTOUR - 1 FT INTERVALVTCSFWIPIPGBMUCWORSGFEXISTING DIRECTION OF SURFACE FLOWINSTALL RIPRAP PROTECTION (TYPE M D =12")RR502526FOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2 BUSINESS DAYS IN ADVANCECENTER OF COLORADOCALL UTILITY NOTIFICATION1-800-922-1987MEMBER UTILITIES.
www.herefordnrcd.com/Straw_Wattles.pdf) AND PER DETAILSAND INSTALLATION INSTRUCTIONS CALLED FOR ON THIS SHEET.2. IF GRAVEL INLET FILTERS ARE USED, REFER TO "CURB INLET GRAVEL FILTER" DETAIL, THIS SHEET.STRAWWATTLE/ROCKSOCK CHECKDAMwww.herefordnrcd.com/Straw_Wattles.pdfWOODENSTAKE(TYP)STRAWWATTLEWOODENSTAKE(TYP)EMBEDWATTLE/ROCKSOCK FILTERS3" TO 5" INTOSOILEMBEDWATTLE/ROCKSOCK 3" TO 5"INTO SOILSHEET No:PROJECT/ LOCATION:
DRAWING:OFCHECKED BY:DESIGNED BY:DRAWN BY:DESCRIPTION OF REVISION:DATE:REVISED BY:APPROVED BY:REV. #
1
2
3
4
5
6
7
P
R
E
L
IM
INARYNOT
FOR
CON
S
T
RU
C
T
IONproject no:date: FIFTY FORTY ONE TECHNOLOGY PARKWAY
FORT COLLINS, COLORADO
EROSION CONTROL NOTES & DETAILSC-006613SEPTEMBER 29, 2021100-004JRGJRGJRGFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2 BUSINESS DAYS IN ADVANCECENTER OF COLORADOCALL UTILITY NOTIFICATION1-800-922-1987MEMBER UTILITIES.
SLOPEINSTALLATIONDETAILDrawing Not To Scale1.Prepare soil before installing rollederosion control products (RECPs),including any necessaryapplication of lime, fertilizer, andseed.2.Begin at the top of the slope byanchoring the RECPs in a6"(15cm) deep X 6"(15cm) widetrench with approximately 12"(30cm) of RECPs extended beyondthe up-slope portion of the trench.Anchor the RECPs with a row ofstaples/stakes approximately 12"(30cm) apart in the bottom of thetrench. Backfill and compact thetrench after stapling. Apply seed tothe compacted soil and fold theremaining 12"(30cm) portion ofRECPs back over the seed andcompacted soil. Secure RECPsover compacted soil with a rowof staples/stakes spacedapproximately 12"(30cm) apartacross the width of the RECPs.3.Roll the RECPs (A) down or (B)horizontally across the slope.RECPs will unroll with appropriateside against the soil surface. AllRECPs must be securely fastenedto soil surface by placingstaples/stakes in appropriatelocations as shown in the staplepattern guide.4.The edges of parallel RECPs mustbe stapled with approximately 2" -5" (5-12.5cm) overlap dependingon the RECPs type.5.Consecutive RECPs spliced downthe slope must be end over end(Shingle style) with an approximate3"(7.5cm) overlap. Staple throughoverlapped area, approximately12"(30cm) apart across entireRECPs width.Drawn on: 5-4-17Disclaimer:The information presented herein is general design information only. For specific applications,consult an independent professional for further design guidance.2"-5"(5-12.5cm)3B42513A12"(30cm)6"(15cm)6"(15cm) *NOTE:In loose soil conditions, the use ofstaple or stake lengths greater than6"(15cm) may be necessary toproperly secure the RECP's.3"(7.5cm)5401 St. Wendel - Cynthiana Rd.Poseyville, IN 47633PH: 800-772-2040www.nagreen.comCHANNELINSTALLATIONDETAILDrawing Not To Scale1.Prepare soil before installing rollederosion control products (RECPs),including any necessary application oflime, fertilizer, and seed.2.Begin at the top of the channel byanchoring the RECPs in a 6"(15cm)deep X 6"(15cm) wide trench withapproximately 12"(30cm) of RECPsextended beyond the up-slope portionof the trench. Use ShoreMax mat at thechannel/culvert outlet as supplementalscour protection as needed. Anchor theRECPs with a row of staples/stakesapproximately 12"(30cm) apart in thebottom of the trench. Backfill andcompact the trench after stapling. Applyseed to the compacted soil and fold theremaining 12"(30cm) portion of RECPsback over the seed and compacted soil.Secure RECPs over compacted soilwith a row of staples/stakes spacedapproximately 12" apart across thewidth of the RECPs.3.Roll center RECPs in direction of waterflow in bottom of channel. RECPs willunroll with appropriate side against thesoil surface. All RECPs must besecurely fastened to soil surface byplacing staples/stakes in appropriatelocations as shown in the staple patternguide.4.Place consecutive RECPs end-over-end(Shingle style) with a 4"-6" overlap. Usea double row of staples staggered 4"apart and 4" on center to secureRECPs.5.Full length edge of RECPs at top of sideslopes must be anchored with a row ofstaples/stakes approximately 12"(30cm)apart in a 6"(15cm) deep X 6"(15cm)wide trench. Backfill and compact thetrench after stapling.6.Adjacent RECPs must be overlappedapproximately 2"-5" (5-12.5cm)(Depending on RECPs type) andstapled.7.In high flow channel applications astaple check slot is recommended at 30to 40 foot (9 -12m) intervals. Use adouble row of staples staggered4"(10cm) apart and 4"(10cm) on centerover entire width of the channel.8.The terminal end of the RECPs must beanchored with a row of staples/stakesapproximately 12" (30cm) apart in a6"(15cm) deep X 6"(15cm) wide trench.Backfill and compact the trench afterstapling.Drawn on: 5-4-17Disclaimer:The information presented herein is general design information only. For specific applications,consult an independent professional for further design guidance.2"-5"(5-12.5cm)62412"(30cm)6"(15cm)6"(15cm)4"-6"(10-15cm)86"(15cm)574"(10cm)31ABCABC NOTES:*Horizontal staple spacing should bealtered if necessary to allow staples tosecure the critical points along the channelsurface.**In loose soil conditions, the use of stapleor stake lengths greater than 6"(15cm) maybe necessary to properly secure theRECP's. CRITICAL POINTSA. Overlaps and SeamsB. Projected Water LineC. Channel Bottom/Side Slope Vertices4"(10cm)6"(15cm)5401 St. Wendel - Cynthiana Rd.Poseyville, IN 47633PH: 800-722-2040www.nagreen.comOUTLET PIPEENDS OF GRAVEL FILTER TO BEKEYED INTO FILL SLOPE.TOE OF FILLFLOWGRAVEL FILTER(3/4"Ø ± GRAVEL,WRAPPED IN CHICKENWIRE)MAINTENANCE NOTES:1. FORM CHICKEN WIRE WRAP ALONG FRONT OF OUTLET STRUCTURE AND EXTENDING INTO EMBANKMENT OF POND.2. PACK WITH 3/4" GRAVEL AND ROLL & TWIST CHICKEN WIRE WRAP AT TOP TO HOLD TOGETHER (WIRE TIE, IF NECESSARY).GRAVEL FILTER SHALL BE 18" TALL x 18" WIDE AND SLOPE TOWARDS OUTLET STRUCTURE OR LAID UP AGAINST OUTLETSTRUCTURE FOR STABILITY.3. SEDIMENT BASIN FILTER SHALL BE INSPECTED PERIODICALLY AND AFTER EACH RAIN EVENT, AND REPAIRED WHENNECESSARY. ACCUMULATED SEDIMENT SHALL BE REMOVED.4. SEDIMENT BASIN FILTER SHALL BE REMOVED AFTER IT HAS SERVED ITS PURPOSE.OUTLET PIPEFILTEREDWATERRUNOFF18" TALL GRAVEL FILTER.18"18"OUTLET STRUCTUREOUTLET STRUCTURESHEET No:PROJECT/ LOCATION:
DRAWING:OFCHECKED BY:DESIGNED BY:DRAWN BY:DESCRIPTION OF REVISION:DATE:REVISED BY:APPROVED BY:REV. #
1
2
3
4
5
6
7
P
R
E
L
IM
INARYNOT
FO
R
CON
S
T
RU
C
T
IONproject no:date: FIFTY FORTY ONE TECHNOLOGY PARKWAY
FORT COLLINS, COLORADO
EROSION CONTROL DETAILSC-007713SEPTEMBER 29, 2021100-004JRGJRGJRG