HomeMy WebLinkAboutGOLDEN MEADOWS BUSINESS PARK, G.S.A. BUILDING - I-P SITE PLAN REVIEW - 98-88 - CORRESPONDENCE - RESPONSE TO APPLICANT (2)Develaent Services • Planning Department City of Fort Collins September 29, 1988 Mr. Al Antonio c/o Empire Development Company 950 Wadsworth Blvd., Suite 201 Lakewood, CO. 80215 Dear Mr. Antonio: This letter is to clarify the status of the proposed office building for the Fish and Wildlife Service to be located on Lots 1,2,3, and 4 of the Golden Meadows Business Park in Fort Collins. The site is zoned I-P, Industrial Park. According to the Zoning Code of the Cite of Fort Collins, offices are a permitted use in the I-P zone. For this project to receive final approval from the City of Fort Collins, it must be reviewed through the I-P Site Plan Review Process. This process takes approxi- mately three weeks. The project has been reviewed on a conceptual level by the City of Fort Collins Conceptual Review Team on September 26, 1988. During this conceptual review, the City identified certain conditions that have to be met before final approval would be granted. Should the conditions of approval be met to the full satisfact- ion of the Planning Department and the affected City agencies and outside utility providers, then, upon receipt of all proper fees and documentation, the proposal would accepted by the City as a final plan. It is the City of Fort Collins, Department of Planning position that the following conditions must be met prior to final approval: The applicant shall submit a traffic impact analysis identifying the trip generation and associated traffic impacts on adjacent public streets. Any public improvements necessitated by the impacts identified by the traffic impact analysis must be constructed as part of the proposed project. Such an analysis shall also include a vicinity map and analysis of nearby planned or existing curb cuts in the Golden Meadows Business Park. 2. The applicant shall submit a drainage report and a drainage and grading plan that meets the submittal requirements of the City of Fort Collins Stormwater Utility. Such report shall refer to the master drainage study that has been done for the subdivision. The findings of the report shall conform to the parameters of the master drainage study and address the impacts associated with the proposed project. 300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 • 0 3. The applicant shall agree to construct any public improvements (street, sidewalk, curb, gutter, handicap ramps) that are adjacent to the subject property and are not yet constructed. The applicant shall agree to construct said improvements by way of a Development Agreement that shall be executed prior to final approval of the Site Plan Review. 4. The applicant shall agree to develop the site in such a manner that meets or exceeds the Zoning Code for setbacks, height, bulk, area, landscape, and parking requirements. 5. The applicant shall agree to pay all associated fees of development that will be payable at the time of building permit. Such fees include the Street Oversizing fee, Water and Sewer Tap fees, Water and Sewer Plant Investment fees, Storm Drainage Basin fee, and sales tax. The applicant further agrees to pay the negotiated development cost to the City of Fort Collins Light and Power Department at a time independent of building permit issuance. 6. The applicant shall agree to design and construct all drive way cuts in such a manner to include curb returns of a minimum 15 foot radius. 7. The applicant shall agree that all signage will conform to the City of Fort Collins Sign Code. In summary, it is the determination of the Planning Department that the proposed project on Lots 1,2,3, and 4 of the Golden Meadows Business Park is in confor- mance with the I-P zone district and would not have to go through the planned unit development process. The only review process is the I-P Site Plan Review process which results in final approval. There is no "preliminary process", only mandatory conceptual review. Based on the conceptual review meeting of Septem- bcr 26, 1988, the conditions listed above would have to be met before final approval would be granted through the I-L Site Plan Review process. If the above conditions are met to the satisfaction of the City of Fort Collins, and all fees are paid, appropriate documents are provided, and all design guidelines as specified in the Zoning Code and other policy documents, then the project would receive final approval through the I-P Site Plan Review process. If there are any questions, please call the Planning Department at 221-6750. Sincerely, r l Ted Shepard Project Planner TS/bh