HomeMy WebLinkAboutGUARDIAN SELF STORAGE - FDP210018 - DOCUMENT MARKUPS - ROUND 2 - UTILITY PLANS (3)Please keep in
mind that this will
need to be elevated
18" above BFE
JR Response: Note
added to plans.
Please show
floodplain/floodway
and Erosion Buffer
Line work.
A stability study is
required for work in
the erosion buffer,
per section 10-202
of City Municipal
Code as well as a
pre and post
construction no-rise
certification.
JR Response:Addressed,
floodplain and erosion buffer
added to plans.
Proposed staging
area is in the
floodway/floodplain
and no temporary
or permanent
storage of materials
is allowed in the
floodway. Please
consider moving to
a different location.
JR Response: SSA
moved out of
floodway/ floodplain
The No-Rise
certification
submitted during
PDP had no
mention of the
outfall. Please be
advised that ALL
work in the
floodway will
require a pre and
post construction
no-rise certification.
JR Response:Addressed and
noted .