Loading...
HomeMy WebLinkAboutGUARDIAN SELF STORAGE - FDP210018 - DOCUMENT MARKUPS - ROUND 2 - UTILITY PLANS (3)Please keep in mind that this will need to be elevated 18" above BFE JR Response: Note added to plans. Please show floodplain/floodway and Erosion Buffer Line work. A stability study is required for work in the erosion buffer, per section 10-202 of City Municipal Code as well as a pre and post construction no-rise certification. JR Response:Addressed, floodplain and erosion buffer added to plans. Proposed staging area is in the floodway/floodplain and no temporary or permanent storage of materials is allowed in the floodway. Please consider moving to a different location. JR Response: SSA moved out of floodway/ floodplain The No-Rise certification submitted during PDP had no mention of the outfall. Please be advised that ALL work in the floodway will require a pre and post construction no-rise certification. JR Response:Addressed and noted .