HomeMy WebLinkAboutGUARDIAN SELF STORAGE - FDP210018 - DOCUMENT MARKUPS - ROUND 2 - UTILITY PLANS (2)Please review the configuration of existing drainage pipes here. Our information shows that the 2 existing pipes cross and do not intersect. Please label ROW line please remove this headwall JR Response: existing and pro- posed pipe configuration revised JR Response: Addressed JR Response: Addressed Is this gas line being relocated? If so, please show as different or remove from this drawing. Is this section of storm and drainage structure being removed? If so, please show as different, or remove from this plan. 1 1 .7 f t 9 .6 f t 1 1 .3 f t Connection point for underdrain in ROW. This will require encroachment permit from Engineering. 7.6 ft JR Response: Addressed, pipe and headwall re- moved JR Response: Addressed, relocated gas line re- moved from drawing JR Response: An en- croachment permit is not need per Marc Virata Label wall,(max ht) Please show tie-in at PL unless you plan to work north of the PL If gas line is to be removed, please do not show on this plan. The sand filter area and side slopes should be in an exclusive drainage easement and not combined with a utility easement JR Response: Addressed, relocated gas line re- moved from drawing JR Response: Addressed, easements revised JR Response: Addressed JR Response: Addressed, tie-in shown at PL. Connection point for underdrain.... see previous comments. Major encroachment permit? There are too many spot elevations on this plan and the text is wiping out other linework. Please present these spot elevations on another plan, or with another approach, so that the line work is not wiped out by text. 20-ft? Forebay required here. Please show and label the Temporary Construction Easement also. Are any details needed for installation of underdrain system? Cleanouts needed at underdrain bends. JR Response: Addressed JR Response: Addressed JR Response: Addressed, detail view added JR Response: Addressed, cleanouts added JR Response: An en- croachment permit is not need per Marc Virata JR Response: Addressed, forebay added 10ft inlet -modified type R. -I am not clear how much flow is intercepted here. -What is residual street flow. 10ft inlet modified type R 19.5 cfs 15-ft inlet modified type R High tailwater (10yr)(pipe design criteria ).Q100 =70 cfs Low tailwater (inlet design to match pipe capacity) Q100 = 141 cfs 39.8 cfs What is the pipe flow here? 18 cfs pipe 18 cfs pipe 11.3 cfs pipe ? 46.4 cfs pipe Please provide more explanation of total flows at DP OS3 and DP 16. I am not sure I understand how flows are being summed here. How much flow is being intercepted at these inlets? In order to provide a total of 141 cfs capture in the system, I am back-calcing 53 cfs here. Please confirm. Feel free to contact me to discuss with any questions! 102 cfs (full flow)/ 31 cfs (high tailwater)? JR Response: 9.0 cfs pipe JR Response: 9.4 cfs pipe JR Response: 9.8 cfs pipe JR Response: 17.8 cfs pipe JR Response: 19.9 cfs pipe JR Response: 46.4cfs pipe 6.3 cfs bypass JR Response: Inlet Inter- cepts 8.7cfs and bypasses 6.3cfs JR Response: 0.2 cfs pipe half 14.15 cfs offsite street flow JR Response: 17.6 cfs pipe JR Response:west inlet intercepts 19.4cfs East inlet intercepts 15.95 cfs North pipe 49 cfs West pipe 17.6cfs East pipe 7.4cfs Inlet interception 29.9cfs 46.4+17.6+7.4+29.9 = 101.3cfs JR Response: 101.3 cfs pipe JR Response: 39.8 cfs pipe JR Response: Bypass 12.8 JR Response: 141.10 cfs pipe JR Response: pipe 24.6 surface DP18 +DPOS2+DPOS3+Offsite street flow of 22.3cfs =0.3+4.1+1.5+22.3=28.2cfs Confluenced =28.0cfs DP16 is piped flow 15.2+24.6 =39.8cfs JR Response: Pipe 24.6 cfs JR Response: Bypass 13.6 + bypass 6.3+ dp15 2.1cfs =19.4cfs JR Response: A table summarizing inlet inter- ception and bypassed flows has been added for clarity for the 100 year condition. JR Response: intercepted 15.2 JR Response: Sump inlets intercept a combined flow of 37.3cfs Please show existing and and any proposed grading. Show existing trails and sidewalks Provide maintenance access to the manhole vault from Fossil Creek Parkway.: We will need reinforced turf section, 15-ft wide, supporting 40-tons. reinforce the concrete path crossings show how proposed pipe will connect to existing pipe Add Note to the effect of: All storm drain pipes constructed in or near groundwater will required gasketed joints. Add cut off wall (north of Fossil Creek Parkway). Provide detail for cutoff wall. JR Response: Addressed JR Response: Addressed JR Response: Addressed JR Response: Addressed is a 15-inch pipe large enough to handle required flows? JR Response: Addressed JR Response: Yes There is an existing drainage pipe here The existing pipes do not not cross, please field investigate and update design to collect both systems in this manhole is this a custom structure or 5-ft standard MH? Text problem remove pipe JR Response: Addressed JR Response: Addressed. Now utilizing a 4' manhole. JR Response: Addressed. See demo plan. JR Response: Addressed EC Plans should show construction work near Fossil Creek and the corresponding disturbed area and erosion control measures. JR Response: Addressed Does the plan set call out the sand media specs anywhere? JR Response: Addressed 1. ALL MANHOLE AND TRANSITION STRUCTURES SHALL BE PROVIDED WITH CHANNELIZING CONCRETE AND ACCESS STEP RUNGS PER CITY OF FORT COLLINS UTILITIES STORMWATER CONSTRUCTION DETAILS. 2. THE SPECIFIC LOCATIONS AND ARRANGEMENT OF STEPS AND PATH FROM STREET LEVEL TO BASE INVERT AT EACH STRUCTURE SHALL BE DETERMINED AND APPROVED IN THE FIELD BY THE CITY'S INSPECTOR. ANY GEOMETRICS OF THE CHANNELIZATION CONCRETE AND ACCESS STEP RUNGS SHOWN IN THESE PLANS SHOULD BE CONSIDERED SCHEMATIC AND TO BE DETERMINED IN THE FIELD PER STRUCTURE. 3. STEP RUNGS, SHALL BE PROVIDED AT 12" ON CENTER MAXIMUM, AND SHALL CONFORM TO CITY OF FORT COLLINS UTILITIES STORMWATER CONSTRUCTION DETAILS. 4. STEPS SHALL BE MOUNTED TO BARREL RISERS AND STRUCTURAL WALLS WHERE POSSIBLE, AND PROVIDED WITH TOE POCKETS IN CHANNELIZING CONCRETE SO AS NOT TO PROJECT INTO THE FLOW AREA. WHERE CONDITIONS REQUIRE STEPS TO BE MOUNTED TO CHANNELIZING CONCRETE, ADDITIONAL REINFORCING OF #3 BARS AT 12" EACH WAY (EPOXY-COATED) WILL BE REQUIRED IN THE CHANNELIZING CONCRETE, EXTENDING A MINIMUM OF 3'-0" EACH WAY FROM STEPS. 5. HORIZONTAL LOCATIONS OF AT-GRADE MANHOLE OPENINGS SHALL BE COORDINATED WITH OPENINGS IN TOP SLABS OF STRUCTURES AND REINFORCING AROUND THE OPENINGS ADJUSTED ACCORDINGLY. 6. THE FOLLOWING COVER SHALL BE PROVIDED FOR REINFORCEMENT (UNLESS OTHERWISE NOTED): CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3" ALL OTHER CONCRETE LOCATIONS: 2" 6. ALL STRUCTURES SHALL BEAR ON A MINIMUM OF 24" COMPACTED CLASS 6 GRAVEL BEDDING MATERIAL OVER UNDISTURBED SUBGRADE OR EXCAVATED AND RECONSTRUCTED SUBGRADE. THE HORIZONTAL EXTENTS OF THE BEDDING MATERIAL SHALL BE A MINIMUM OF 1'-6" BEYOND THE OUTER EDGES OF STRUCTURE BOTTOM SLABS. 7. REFER TO GEOTECHNICAL REPORT #20165033 BY TERRACON FOR ADDITIONAL REQUIREMENTS REGARDING EXCAVATION, AND BACKFILLING. 8. AVAILABLE GEOTECHNICAL INFORMATION IS NOT ADEQUATE FOR CONFIRMATION OF DESIGN ALLOWABLE BEARING PRESSURE VALUES OR PRESENCE OF SUITABLE SUBGRADE MATERIALS. THE CONTRACTOR SHALL ENGAGE A QUALIFIED GEOTECHNICAL ENGINEER TO OBSERVE THE STRUCTURE EXCAVATIONS. IF MATERIALS OBSERVED BY THE GEOTECHNICAL ENGINEER ARE DEEMED INADEQUATE FOR PERMANENT STORM SEWER STRUCTURE SUPPORT, THE HORIZONTAL AND VERTICAL LIMITS OF OVEREXCAVATION AND SUBGRADE MATERIAL REPLACEMENT SHALL BE INCREASED TO THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS. 9. EXCAVATIONS SHALL BE DESIGNED BY A REGISTERED PROFESSIONAL ENGINEER IN ACCORDANCE WITH APPLICABLE OSHA REQUIREMENTS. 10.CONTRACTOR IS ADVISED THAT DEWATERING MAY BE REQUIRED. ALL WORK SHALL BE DONE IN ACCORDANCE WITH CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS. GRADE 60 REINFORCING STEEL IS REQUIRED. ALL REINFORCING STEEL SHALL BE EPOXY COATED UNLESS OTHERWISE NOTED. EXCEPT WHERE DETAILED OTHERWISE IN THESE PLANS, THE FOLLOWING TABLE GIVES THE MINIMUM CLASS B (STAGGERED) LAP SPLICE LENGTH FOR EPOXY COATED REINFORCING BARS. THESE SPLICE LENGTHS SHALL BE INCREASED BY 25% FOR BARS SPACED AT LESS THAN 6" ON CENTER. BAR SIZE #4 #5 #6 #7 #8 #9 #10 #11 SPLICE LENGTH FOR 2'-6" 3'-1" 4'-7" 5'-4" N/A N/A N/A N/A CLASS D CONCRETE THE ABOVE SPLICE LENGTHS SHALL BE INCREASED BY 30 PERCENT FOR NON-STAGGERED SPLICES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STABILITY OF THE STRUCTURES DURING CONSTRUCTION. E.F. =EACH FACE O.F. =OUTSIDE FACE F.F. =FAR FACE T.&B.=TOP AND BOTTOM N.F. =NEAR FACE T.F. =TOP FACE I.F. =INSIDE FACE B.F.=BOTTOM FACE STATIONS, ELEVATIONS, AND DIMENSIONS CONTAINED IN THESE PLANS ARE CALCULATED FROM A RECENT FIELD SURVEY. THE CONTRACTOR SHALL VERIFY ALL DEPENDENT DIMENSIONS IN THE FIELD BEFORE ORDERING OR FABRICATING ANY MATERIAL. THE INFORMATION SHOWN ON THESE PLANS CONCERNING THE TYPE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATION AS TO THE TYPE AND LOCATION OF UNDERGROUND UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO AT 1-800-922-1987 AT LEAST 2 DAYS (NOT INCLUDING THE DAY OF NOTIFICATION) PRIOR TO ANY EXCAVATION OR OTHER EARTHWORK. ALL CAST-IN-PLACE CONCRETE SHALL BE CLASS D UNLESS NOTED OTHERWISE. ALL REINFORCING SHALL BE TIED AND CAST-IN UNLESS NOTED OTHERWISE OR APPROVED BY ENGINEER. DRILLED AND EPOXIED REINFORCING BARS, WHEN APPROVED, SHALL BE EMBEDDED A MINIMUM OF 6 INCHES OR AS SPECIFIED BY THE EPOXY MANUFACTURER. GENERAL NOTES AASHTO, 8th EDITION LRFD DESIGN METHOD: LOAD AND RESISTANCE FACTOR DESIGN. LIVE LOAD: HL-93. LATERAL EARTH PRESSURE: 60 P.C.F (AT-REST E.F.P.) ALLOWABLE BEARING PRESSURE: 2000 P.S.F (ASSUMED) GROUNDWATER TABLE = 3' BELOW GRADE (ASSUMED) REINFORCED CONCRETE: CLASS D CONCRETE:f'c = 4,500 psi REINFORCING STEEL:f'y = 60,000 psi CAST-IN-PLACE CONCRETE INLET STRUCTURES CONNECTING TO PRECAST CONCRETE STORM SEWER PIPES. DIMENSIONS VARY PER STRUCTURE. CAST-IN-PLACE CONCRETE AND SEGMENTAL GRAVITY BLOCK RETAINING WALLS (MAXIMUM RETAINED HEIGHT = 3'-6") STRUCTURAL STEEL SHADE STRUCTURE ON CONCRETE SPREAD FOOTINGS. DESIGN DATA (INLET STRUCTURES) STRUCTURE DESCRIPTIONS STRUCTURE DRAWING INDEX S01 GENERAL NOTES AND SPECIFICATIONS S02 STORM STRUCTURE 1 S03 STORM STRUCTURE 2 S04 STORM STRUCTURE 3 S05 STORM STRUCTURE 4 S06 STORM STRUCTURE 5 S07 STORM STRUCTURE 6 S08 MISCELLANEOUS DETAILS STRUCTURE NOTES: SECTION OR DETAIL IDENTIFICATION CROSS-REFERENCE SHEET NUMBER ( -- = SAME SHEET) A XX Correct text problems 5'-4" 8" EXISTING 24"CL 8"4'-0"8"6'-212"INV. IN = FIELD VERIFY (EXISTING 24")8"4'-612"1'-0"4'-612"8"6'-212"TOC EL. = 4967.03 4'-0"8"8" STM MH-1, SPECIAL STRUCTURE PLAN VIEW SCALE: 1/2" = 1'-0" - STM MH-1, SPECIAL STRUCTURE SECTION VIEW SCALE: 1/2" = 1'-0" - 1 A STM MH-1, SPECIAL STRUCTURE SECTION VIEW SCALE: 1/2" = 1'-0" - B TOC EL. = 4967.03 TOC EL. = 4961.83 8" KEY MAP SCALE: 1" = 100'2" CLR.3" CLR.2" CLR.5'-4" 8"4'-0"8" #5 @ 6" EA WAY 24" RCPCL B - A - N 8" (TYP) STRUCTURE 1 #4 @ 12" EA WAY TOP & BTM MATS 4"3'-0"(4) #4 x 1'-0" 4" INV. OUT = 4962.33 (24" RCP) INV. IN = FIELD VERIFY (EXISTING 24") 5'-4"5'-4"8"8"4'-0"8"8"24" RCPCL 1'-0"TOC EL. = 4961.83 1'-0"4'-8" #4 x @ 6" #4 @ 6" INV. OUT = 4962.33 (24" RCP) 1'-2"1'-2"24"Ø CAST IRON LID REF. CITY OF FORT COLLINS STANDARD DETAILS 2" CLR.3" CLR. #4 @ 12" EA WAY TOP & BTM MATS3'-0"#4 x @ 6" 1'-0" 1'-0"4'-8" #4 x @ 6" #4 @ 6" EXISTING 24"CL EEE E E text problem We think there there is an existing pipe here, please field verify Isn't there an existing or proposed pipe here? Is this north arrow correct? I am confused with this detail center mh cover in structure 6'-9"8"CL8"3'-0"1'-0"INV. IN = 4942.43 (EXISTING 18")8"7'-812"7'-812"8"9'-412"1'-0"TOC EL. = 4937.86 TOC EL. = 4946.38 10'-412" 12'-412" 1'-0"1'-0" 4'-8" 1'-0"8" STM MH-2, SPECIAL STRUCTURE PLAN VIEW SCALE: 1/2" = 1'-0" - STM MH-2, SPECIAL STRUCTURE SECTION VIEW SCALE: 1/2" = 1'-0" - 1 A STM MH-2, SPECIAL STRUCTURE SECTION VIEW SCALE: 1/2" = 1'-0" - B TOC EL. = 4946.38 TOC EL. = 4938.018"8"8" KEY MAP SCALE: 1" = 100'2" CLR.3" CLR.2" CLR.12'-412" 1'-0"10'-412"1'-0" #4 @ 6" #5 @ 6" A - B -N8" (TYP) 2" CLR. (TYP) #5 @ 12" EA. WAY TOP & BTM MATS STRUCTURE 2 EXISTING 30"CLE X I S T I N G 1 8 " INV. IN = 4942.43 (EXISTING 18") INV. IN = 4940.28 (EXISTING 30") INV. OUT = 4938.64 (42" RCP) INV. IN = 4940.28 (EXISTING 30") 2'-5" 1'-0" 7'-1"2'-612"2'-612"8"4 2 " R C P C L 3'-0"10"6'-412"1'-2"1'-0"9'-412" #5 @ 12" #5 x @ 6" #5 @ 12" EA. WAY TOP & BTM MATS 1'-2"1'-2"24"Ø CAST IRON LID REF CITY OF FORT COLLINS STANDARD DETAILS 5'-1" #5 @ 12" #5 @ 6" #4 #7 @ 6" #4 @ 12"4'-0"#5 x @ 6" 3'-0"3'-0"#4 x @ 12" 12" (4) RODS @ 30" MAX 2" CLR TO HOOK 1'-3"3'-0"#4 x @ 12" 12"4'-0"#5 x @ 6" 3'-0"1'-8"MINEMBED8" (TYP) SEE CITY OF FORT COLLINS UTILITIES STANDARD DETAIL D-7A FOR CURB FACE ASSEMBLY CONSTRUCTION. EEE E E add 24-inch MH cover please locate MH cover at intersection of pipe flowlines Please channelize flowlines on vault floor 10'-0"8"3 4 x 5 8 H E R C P CL1'-0"4'-10"6'-1"8"7'-9"1'-0"TOF EL. = 4936.78 TOC EL. = 4943.58 10'-0" 12'-0" 15" RCPCL 1'-0"1'-0" 1'-0"1'-0" STM MH-3, SPECIAL STRUCTURE PLAN VIEW SCALE: 1/2" = 1'-0" - STM MH-3, SPECIAL STRUCTURE SECTION VIEW SCALE: 1/2" = 1'-0" - 1 A STM MH-3, SPECIAL STRUCTURE SECTION VIEW SCALE: 1/2" = 1'-0" - B TOC EL. = 4943.58 TOF EL. = 4936.82 8"8" 5'-0"5'-0" KEY MAP SCALE: 1" = 100'2" CLR.3" CLR.2" CLR.12'-0" 1'-0"10'-0"1'-0" A - B -N2" CLR. (TYP) INV. IN = 4937.59 (34x53 HERCP) INV. IN = 4937.59 (15" RCP) 4 8 " R C PCL 18" RCPCL3'-2"10'-0"8"1'-0"2'-8"5'-4"90°0'7'-9"1'-2"4'-5"1'-0"INV. OUT = 4937.48 (48" RCP) INV. IN = 4937.59 (34x53 HERCP) INV. IN = 4937.59 (15" RCP) #5 @ 6" #6 @ 6" 0'-9"X(4) #6 x #6 @ 4" #5 @ 10" E.W. STRUCTURE 390°0'1'-2"(6) RODS @ 30" O.C. MAX. DO NOT PLACE DIRECTLY ABOVE PIPE. 3'-0"5'-0" #5 @ 12" #5 @ 6"3'-0"#5 x @ 6" 3'-0" #4 @ 12"3'-0"#4 x @ 12" 12" 10'-0" #5 @ 10" E.W.3'-0"#5 x @ 6" 3'-0"3'-0"#4 x @ 12" 12" #5 @ 12" #5 @ 6" #7 @ 6" #4 @ 12" #5 @ 6" #4 @ 12" E.W. SEE CITY OF FORT COLLINS UTILITIES STANDARD DETAIL D-7A FOR CURB FACE ASSEMBLY CONSTRUCTION. #5 @ 6" #6@ 6" 1'-2"1'-10"EEE E E 24-inch MH covers Please channelize flowlines on vault floor add structural section looking at west wall why is the roof benched? can this be flat? 4'-4"8"2 4 " R C PCL8"3'-0"8"11'-912"INV. IN = 4942.33 (24" RCP)8"10'-112"1'-0"10'-112"8"11'-912"1'-0"TOC EL. = 4936.53 TOC EL. = 4947.33 36" RCPCL 15'-0" 16'-4"36" RCPCL8"8" INV. OUT = 4937.13 (36" RCP) 3'-0"8"8" STM MH-4, SPECIAL STRUCTURE PLAN VIEW SCALE: 1/2" = 1'-0" - STM MH-4, SPECIAL STRUCTURE SECTION VIEW SCALE: 1/2" = 1'-0" - 1 A STM MH-4, SPECIAL STRUCTURE SECTION VIEW SCALE: 1/2" = 1'-0" - B TOC EL. = 4947.33 TOC EL. = 4936.538"8"8"1'-6"1'-6"7'-6"7'-6" KEY MAP SCALE: 1" = 100' 1'-6"10'-3"(4) #6 x 2" CLR.3" CLR.2" CLR.15'-0" 16'-4" 8"15'-0"8" #4 @ 6" #5 @ 6" 24" RCPCL A - B -N8" (TYP) (4) #4 STRUCTURE 4 #6 x @ 4" ON CL WALL4" 4"4"5'-0"3'-0"5'-0"#6 x @ 9" #6 @ 9" #6 x @ 4" ON CL WALL 4" INV. OUT = 4937.13 (36" RCP) INV. IN = 4942.33 (24" RCP) 1'-10" 4'-4" 166°51' 128°9' 1'-2"1'-2"24"Ø CAST IRON LID REF CITY OF FORT COLLINS STANDARD DETAILS (4) #4 x (6) RODS @ 30" MAX 8" (TYP) (5) #4 1'-6" #6 @ 9" #4 @ 9"5'-0"#6 x @ 9" (5) #4 SEE CITY OF FORT COLLINS UTILITIES STANDARD DETAIL D-7A FOR CURB FACE ASSEMBLY CONSTRUCTION. EEE E E 24-inch mh cover Please channelize flowlines on vault floor 9'-4"8"36" RCPCL8"8'-0"8"8'-11"1'-0"6'-11"1'-0"6'-1034"1'-0"8'-1034"1'-0"TOC EL. = 4936.51 TOC EL. = 4944.41 48" RCPCL 12'-0" 13'-4" 8"8" INV. OUT = 4937.13 (29x45 HERCP) 8'-0"8"8" STM MH-5, SPECIAL STRUCTURE PLAN VIEW SCALE: 1/2" = 1'-0" - STM MH-5, SPECIAL STRUCTURE SECTION VIEW SCALE: 1/2" = 1'-0" - 1 A STM MH-5, SPECIAL STRUCTURE SECTION VIEW SCALE: 1/2" = 1'-0" - B TOC EL. = 4944.41 TOC EL. = 4936.518"8"8"3'-7"4'-5"5'-8"6'-4" KEY MAP SCALE: 1" = 100'2" CLR.3" CLR.2" CLR.2" CLR.12'-0" 13'-4" 8"8" 36" RCPCL A - B - N 8" (TYP) STRUCTURE 5 INV. IN = 4937.23 (48" RCP) INV. IN = 4937.23 (36" RCP) INV. IN = 4937.23 (48" RCP) 48" RCPCL DUAL 29x45 HERCPCL 2" CLR.3" CLR.2" CLR.2" CLR.C 48" RCPL 4" #5 x @ 6" #5 @ 6" ON C WALL 1'-3"7'-8"#5 @ 6" EA WAY TOP & BOT MATS #4 @ 6" EA WAY TOP & BTM MATS #4 @ 6" EA WAY TOP & BTM MATS #5 @ 6" EA WAY TOP & BTM MATS #5 x @ 6" #5 @ 6" ON C WALL 1'-3"7'-8"1'-2"1'-2"24"Ø CAST IRON LID REF CITY OF FORT COLLINS STANDARD DETAILS L L #5 @ 6" 3'-0"4'-0" #5 @ 6" 3'-0"4'-0"EEE E E show underdrain connection provide 36-inch MH cover provide 24-inch MH covers Please channelize flowlines on vault floor 9'-212"8"1'-0"7'-712"7'-212"INV. IN = 4936.57 (29x45 HERCP) (EXISTING)1'-0"5'-212"1'-0"5'-234"1'-0"7'-234"1'-0"TOC EL. = 4935.95 TOC EL. = 4942.12 29 x 45 HERCP (EXISTING) CL 4'-0"#5 x @ 12" 13'-412" 14'-412" CL 1'-0" INV. OUT = 4936.47 (29x45 HERCP) (NEW) 1'-0"1'-0" STM MH-6, SPECIAL STRUCTURE PLAN VIEW SCALE: 1/2" = 1'-0" - STM MH-6, SPECIAL STRUCTURE SECTION VIEW SCALE: 1/2" = 1'-0" - 1 A STM MH-6, SPECIAL STRUCTURE SECTION VIEW SCALE: 1/2" = 1'-0" - B TOC EL. = 4942.12 TOC EL. = 4935.95 8" 3'-3"3'-1112" (FIELD VERIFY) KEY MAP SCALE: 1" = 100'2" CLR.3" CLR.2" CLR.2" CLR.1'-0"1'-0" A - B - N 8" (TYP) #5 @ 12" STRUCTURE 6 29 x 45 HERCP (NEW) CL 5'-6" (FIELD VERIFY)4' -11"3' -5" 11'-10" 10'-3" 1'-0"2'-9"12'-512"1'-0"5'-6"2'-5"8"8"29 x 45 HERCP (EXISTING) CL29 x 45 HERCP (NEW)2" CLR.3" CLR.CL 29 x 45 HERCP (NEW) CL29 x 45 HERCP (NEW) #6 @ 6" EA WAY #5 @ 12" EA WAY 1'-2"1'-2"24"Ø CAST IRON LID REF CITY OF FORT COLLINS STANDARD DETAILS #5 @ 12" EA WAY 1'-3"6'-0"#5 x @ 12" #5 @ 6" EA WAY #6 @ 6" EA WAY #5 @ 12" EA WAY #5 @ 12" EA WAY #5 @ 6" EA WAY #5 @ 12" 1'-3"6'-0"#5 x @ 12" 3-0"4'-0"#5 x @ 12" 1'-3"4'-0"#5 x @ 12" 1'-3" 113°29' 128°2' 118°28' MH-6, TOP SLAB REINFORCING PLAN PLAN VIEW SCALE: 1/2" = 1'-0" #6 HOOP #5 @ 6"EA WAY (TOP MAT) #6 @ 6" EA WAY (BOT MAT)4'-0"#5 x @ 12" 3'-0" - 2 ADD'L #5 ADD'L #5 ADD'L #5 EEE Provide 2 -36- inch MH covers above the flow lines of each channelize floor of box CORNER REINFORCING DETAIL 3/4" = 1'-0" A (DETAIL NOT USED) 3/4" = 1'-0" B SLAB REINFORCING AT MANHOLE OPENING NO SCALE D REINFORCING AT PIPE PENETRATIONS 1/4" = 1'-0" A BACKFILL REQUIREMENTS 1/4" = 1'-0" C HORIZ BARS EACH FACE SEE DETAILS FOR SIZE AND SPACING MATCH SIZE AND SPACING OF WALL HORIZ BARS × VERT BARS EACH FACE SEE DETAILS FOR SIZE AND SPACING TERMINATE WITH STD HOOK WHERE 1'-3" EXT CANNOT BE ACHIEVED TERMINATE HORIZ BARS AT OUTSIDE FACE WITH STD HOOK VARIES1'-6"2'-0"MIN.UNDISTURBED NATIVE SOILS (TYP) STRUCTURE BACKFILL (CLASS 1) OR APPROVED ALTERNATIVE UNDISTURBED NATIVE SOILS OR ENGINEERED FILL (TYP) STABILIZED SUBGRADE REF: GENERAL STRUCTURE NOTES FINISHED GRADE INLET OR MANHOLE STRUCTURE TRIM BARS: (2) ADDITIONAL T&B, EACH FACE. MATCH SLAB REINF SIZE. TRIM BARS: (2) #5 DIAGONAL T&B 1'-3"EXT, TYP2" CLR, TYPTERMINATE WITH STD HOOK WHERE 1'-3" EXT CANNOT BE ACHIEVED TRIM BARS: (1) ADDITIONAL EACH FACE, MATCH WALL REINF SIZE TRIM BARS: (4) #5×(D+18") DIAGONAL @ 45°, ONE EACH SIDE CTR'D IN WALL 2" C L R, T Y P "D"24" MH RING AND COVER FOR SLAB CONST SEE STD DTL S-701 1'-6"SPLICE LENGTHSPLICE LENGTH #6 RING W/ 30" LAP