Loading...
HomeMy WebLinkAboutGUARDIAN SELF STORAGE - FDP210018 - DOCUMENT MARKUPS - ROUND 2 - UTILITY PLANSFORT COLLINS - LOVELAND WATER DISTRICT AND SOUTH FORT COLLINS SANITATION DISTRICT NOTES: 1. ALL WATER AND SANITARY SEWER CONSTRUCTION SHALL BE PERFORMED ACCORDING TO THE FORT COLLINS-LOVELAND WATER DISTRICT AND THE SOUTH FORT COLLINS SANITATION DISTRICT STANDARDS AND SPECIFICATIONS. 2. CONSTRUCTION OF WATER AND SEWER FACILITIES REQUIRE A PRECON MEETING WITH DISTRICT INSPECTION STAFF PRIOR TO CONSTRUCTION. 3. CONTRACTOR SHALL NOTIFY DISTRICT INSPECTORS PRIOR TO STARTING WORK. 4. CONTRACTOR SHALL CONTACT THE SANITATION DISTRICT INSPECTOR FOR SEWER INSPECTION 48 HOURS PRIOR TO CONNECTING TO EXISTING SEWER STUBS. 5. IF GROUNDWATER IS ENCOUNTERED WITHIN DEPTH OF SEWER CONSTRUCTION, MANHOLES MUST BE WATER-PROOFED. 6. CONTRACTOR SHALL CONTACT THE WATER DISTRICT FOR WATER INSPECTION 48 HOURS PRIOR TO CONNECTING TO EXISTING INFRASTRUCTURE. 7. ALL COMMERCIAL DOMESTIC SERVICES REQUIRE A REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTION DEVICE. 8. ALL WATER LINES SHALL BE A MINIMUM OF (5) FIVE FEET AND A MAXIMUM OF (6) SIX FEET BELOW FINAL GRADE. 9. ALL DISTRICT VALVES SHALL ONLY BE OPERATED BY DISTRICT OPERATIONS STAFF. 10. PIPE PRESSURE AND VACUUM TESTING SHALL BE WITNESSED BY DISTRICT INSPECTORS. WATERLINE BACTERIA TESTS SHALL ALSO BE TAKEN BY DISTRICT INSPECTORS. 11. ONCE THE SYSTEM IS OPERATIONAL AND ALL TESTS HAVE PASSED, CONTRACTOR SHALL REQUEST SUBSTANTIAL COMPLETION WITH A LETTER TO THE DISTRICT. 12. AS-BUILTS SHALL BE SUBMITTED IN PDF AND DWG TO THE DISTRICT FOR FINAL APPROVAL. 13. ONCE ALL PUNCH LIST ITEMS ARE COMPLETE, EASEMENTS ARE RECORDED, AND AS-BUILT FILES ARE APPROVED, THE CONTRACTOR SHALL REQUEST FINAL COMPLETION WITH A LETTER TO THE DISTRICT THAT INCLUDES THE DOLLAR VALUE OF THE WATER AND SEWER IMPROVEMENTS LISTED SEPARATELY. JR Response: Addressed CALL OUT SIZE OF EXISTING VALVES (8"). 3/4" WATER SERVICE TAP 6" GV PLEASE CALL OUT ALL NEW BENDS, FITTINGS, ETC TO ACCOMPLISH THE PROPOSED RELOCATION. ALL FITTTINGS TO BE MECHANICALLY RESTRAINED. Show existing 8" PVC Water line. Show existing waterline and show where, and how, new water line will be rerouted (a bend will be needed in this location). JR Response: Addressed JR Response: Addressed JR Response: Addressed JR Response: Addressed, noted added for fittings JR Response: Addressed JR Response: Addressed