Loading...
HomeMy WebLinkAboutSIT AND STAY DOG BAR - PDP210016 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT NARRATIVE MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES. o: 970.224.5828 | w: ripleydesigninc.com RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521 September 22, 2021 Project Narrative Sit and Stay Dog Bar - Project Development Plan Design/Development Team Property Owner/Developer: Patrick Duncan Planner/Landscape Architect: Ripley Design Architect: VFLA Civil Engineer: Olsson Zoning District CS (Service Commercial) Project Summary Proposed Building Area: 19,065 sf Proposed Parking: 92 spaces Proposed Bike Parking: 15 spaces Building Height: 2 stories (28’) Project Site & History The site is located at 1524 North College Avenue, Lot 3 of Country Club Corners Six Filing. The project site is approximately 94,269 square feet or 2.16 acres and is currently vacant. The property is bordered by a multi-tenant commercial building to the north, Firehouse car wash and a vacant parcel to the west, and the Health District Family Clinic to the south. The primary access to the proposed development will be from the existing private drive which intersects with College Avenue between Burger King and First National Bank. Secondary points of access would extend from Bristlecone Drive to the south and Willox Ln to the north. A Concept Plan was submitted on April 29, 2021, followed by a Conceptual Review Meeting held on May 28, 2021. Proposed Land Use The applicants are proposing to construct a two-level building with approximately 19,065 square feet. Approximately 7,847 square feet of the building will be dedicated to a restaurant use (no MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES. o: 970.224.5828 | w: ripleydesigninc.com RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521 dogs beyond service animals will be permitted inside the restaurant). The remainder of the building will be utilized for indoor dog kennels and an indoor dog park and office space. An outdoor patio will be situated adjacent to the restaurant on the south and west sides of the building. This patio will be allowed to be occupied by leashed dogs only. Beyond the patio is the fenced-in dog park where dogs can roam freely. Within the dog park along the western property boundary, there will be a small structure to include outdoor restaurants and bar service. A raised stage with canopy will be located at the southwest corner of the property. The stage will be used for additional seating within the dog park as well as for occasional events. Site Design The project site is situated between two private drives to the east and west. While a shared parking agreement exists across the Country Club Corners subdivision, the project is proposing to provide all necessary parking on-site. Along the western property boundary, an enhanced sidewalk has been designed to provide a street-like drive feel by widening the sidewalk to 10’ and incorporating trees in tree grates. The main access into the building will come from the west side. There will also be an employee entrance on the east side of the building, and to the south is an entrance that will be used for private events. Within the dog park, surfacing will primarily consist of artificial turf. The turf areas will be irrigated to keep the park clean and reduce odors. Architectural Design The architecture embodies the enthusiasm the project team has for bringing this highly desirable product to northern Fort Collins. The building will consist of a two-story structure with areas designated for a restaurant, overnight dog kennel, and indoor dog park use. Inspiration for the building and materials has been drawn from the industrial character of surrounding structures in the neighborhood with metal siding and muted tones. The mass of the building will be broken up through articulations in the building façade, varying window patterns, and a diversity of materials. Deep canopies at building entrances will enhance the character of the building while also helping to increase visibility of the main visitor entrances. Site Drainage and Stormwater Treatment Detention will be provided to treat the required runoff volume difference between the 100-year developed flow rate the 2-year historic release rate. A portion of the runoff will be treated by a raingarden located at the northeast corner of the site. The remaining detention volume will be treated by underground vaults below the parking lot. Domestic Utility Service Water and sanitary sewer services are to be provided by the City of Fort Collins. A sanitary main is located along the east side of the property within the common drive aisle. Sanitary and grease trap services will be provided from the east and stubbed through the adjacent site parking are. A MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES. o: 970.224.5828 | w: ripleydesigninc.com RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521 domestic water main is located along the west side of the property within the common drive aisle. Fire service and domestic water service will be provided from the west. A meter vault will be provided within landscape area to the northwest of the building. Development Phasing Schedule Construction is scheduled to begin late summer/early fall 2022 and will be completed in a single phase.