Loading...
HomeMy WebLinkAboutFOOTHILLS UNITARIAN CHURCH EXPANSION - MJA210002 - SUBMITTAL DOCUMENTS - ROUND 3 - ELEVATIONSMAIN FLOOR100'-0"METAL FASCIA & SOFFIT,MEDIUM BRONZEMETAL CAP FLASHING TO MATCH CMU COLOR @ CMU WALLSSTUCCOSPLIT FACE CMUSTUCCO CONTROL JOINTS, TYP25'-1"18'-1 7/8"ANGLED WALL PROJECTS IN FRONT OF CLERESTORY WALL BEHIND BY 5' TO 12'-6"EXISTING CURVED, SPLIT FACE CMU WALLEXISTING SPLIT FACE CMU WALLEXISTING STUCCOEXISTING ASPHALT SHINGLE ROOF3'-0"RECESSED ENTRANCEPARAPET WALL STEPS BACK FROM CLERESTORY WALL 2'207'-1 5/8"NEW SANCTUARY104'-7 5/8"EXISTING SANCTUARY BUILDING102'-6"METAL CAP, MEDIUM BRONZEALUMINUM CLAD RESIDENTIAL STYLE WINDOWSPARAPET HEIGHT CHANGES AT MATERIAL CHANGEWALL MOUNTED LIGHT FIXTURE25'-0"2'-3 1/2"MAIN FLOOR100'-0"EXST LOWER FLOOR91'-0"NEW LOWER FLOOR89'-0"ROOF TOP UNIT, SEE 3D VIEW FOR ACTUAL VISIBILITY1'-1 3/4"1'-1 3/4"METAL WINDOW SHADING FINS, MEDIUM BRONZEROOF OVERHANGENTIRE BUILDING172'-6 3/8"NEW SANCTUARY72'-10 3/4"25'-1"RESIDENTIAL ALUMINUM CLAD WINDOW (SIM TO EXISTING)SPLIT FACE CMU FINSSTUCCOGABION WALLMETAL DOWNSPOUT,MED BRONZEWALL MOUNTED LIGHT FIXTURE14'-1 3/4"17'-7 3/4"CONNECTOR ADDITION BEYONDMETAL FASCIA, SOFFIT & GUTTER, MEDIUM BRONZESTUCCO JOINT, TYP.ELECTRICAL GEAR AND METERSCALEPROJECT NUMBERDRAWN BYDATEREVISIONSCHECKED BYCOPYRIGHT 2021 EWERS ARCHITECTURE PCstructural engineercivil engineerKL&A, INC.BASELINE ENGINEERINGmechanical + electrical engineerGIVEN & ASSOCIATES, INClandscape architectSAARINEN ASSOCIATES1/8" = 1'-0"BIM 360://1700-Foothills Unitarian/1700-CD1.rvt9/14/2021 2:48:41 PMEXTERIOR ELEVATIONSAND 3D VIEWS1815 YORKTOWN AVENUE FORT COLLINS COLORADO1700AEO09.15.21PJEA.2FORT COLLINS DEVELOPMENTREVIEW1/8" = 1'-0"1NORTHWEST ELEVATION1/8" = 1'-0"2SOUTHWEST ELEVATION3VIEW FROM DRAKE ROAD4VIEW FROM YORKTOWN AVE5AERIAL VIEW FROM NORTHWESTRTU SCREENING RTU SCREENING MAIN FLOOR100'-0"NEW ADDRESS NUMBERS ADDED, VISIBLE FROM YORKTOWN AVENUE.NEW CONSTRUCTION CONNECTIONG EXISTING BUILDINGS BEYOND COURTYARDEXISTING EDUCATION BUILDINGEXISTING SANCTUARY BUILDING18'-1 3/4"EXISTING TREE IN COURTYARD TO REMAINMECHANICAL EQUIPMENT, SEE 3D VIEWS FOR ACTUAL SCREENINGNEW SANCTUARY BEYONDSTUCCOMETAL CAP, MED BRONZE24'-4 1/8"ENTIRE BUILDING (EXISTING)169'-2 3/8"EXISTING EDUCATION BUILDING31'-0"EXISTING SANCTUARY BUILDING98'-8 3/8"MAIN FLOOR100'-0"EXST LOWER FLOOR91'-0"NEW LOWER FLOOR89'-0"EXISTING EDUCATION BUILDINGEXISTING SANCTUARY BEYONDSTANDING SEAM METAL ROOF, MED BRONZEMETAL FASCIA & GUTTER, MED BRONZESTUCCOSPLIT FACE CMUMETAL CAP, MED BRONZEFLASHING/CAP TO MATCH CMUROOF MOUNTED PV PANELSSTUCCO JOINTS, TYP25'-1"14'-1 3/4"ANGLED WALLCMU AND UPPER WALL STEPPED BACK FROM ANGLED WALLEXISTING EDUCATION BUILDING143'-5 5/8"SANCTUARY ADDITION80'-0"RESIDENTIAL ALUMIMUM CLAD WINDOWS (SIM TO EXISTING)207'-1 5/8"SCALEPROJECT NUMBERDRAWN BYDATEREVISIONSCHECKED BYCOPYRIGHT 2021 EWERS ARCHITECTURE PCstructural engineercivil engineerKL&A, INC.BASELINE ENGINEERINGmechanical + electrical engineerGIVEN & ASSOCIATES, INClandscape architectSAARINEN ASSOCIATES1/8" = 1'-0"BIM 360://1700-Foothills Unitarian/1700-CD1.rvt9/14/2021 2:48:55 PMEXTERIOR ELEVATIONSAND 3D VIEWS1815 YORKTOWN AVENUE FORT COLLINS COLORADO1700AEO09.15.21PJEA.3FORT COLLINS DEVELOPMENTREVIEW1/8" = 1'-0"1NORTHEAST ELEVATION1/8" = 1'-0"2SOUTHEAST ELEVATION3VIEW FROM EAST PARKING ENTRANCE4AERIAL VIEW FROM EAST5AERIAL VIEW FROM SOUTHRTU SCREENING