HomeMy WebLinkAbout205 E PLUM ST CARRIAGE HOUSE - FDP210013 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCommunity Development and Neighborhood Services 281 North College AvenuePO Box 580Fort Collins, CO 80522970.221.6689970.224.6134 faxfcgov.com/developmentreviewSeptember 29, 2021John
Runkles 205 E Plum StFort Collins, CO 80524RE:205 E Plum St Carriage House, FDP210013, Round Number 3Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of 205 E Plum St Carriage House. If you have questions about any comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Tenae Beane via phone at 9702246119 or via email at tbeane@fcgov.com. Comment Summary:Department: Development Review CoordinatorContact: Tenae Beane,
9702246119, tbeane@fcgov.comTopic: GeneralComment Number: 7 Comment Originated: 06/08/202106/08/2021: FOR HEARING:The proposed development project is subject to a Type
1 Review. The decision maker for your project will be an Administrative Hearing Officer at a public hearing. For the hearing, we will formally notify surrounding property owners within
800 feet (excluding public rightofway and publicly owned open space). As your Development Review Coordinator, I will assist with preparing the mailing and coordinating the hearing date
with your team.Department: Planning ServicesContact: Clark Mapes, 9702216225, cmapes@fcgov.comTopic: GeneralComment Number: 3 Comment Originated: 08/12/202108/10/2021:
The entire parking area has to be improved with gravel.Comment Number: 5 Comment Originated: 09/29/202109/29/2021: Per our conversation yesterday, a 6' screen fence panel
is needed to enclose the west edge of the parking area.Department: Engineering Development ReviewContact: Sophie Buckingham, sbuckingham@fcgov.comTopic: GeneralComment Number:
2 Comment Originated: 06/07/202109/21/2021: FOR APPROVAL UNRESOLVED:The easement dedication process must be completed before the final plan can be approved. You can find information
about the dedication process at https://www.fcgov.com/engineering/pdf/Easrowdedications2017.pdf?148166001008/04/2021: Thank you for submitting a legal description of the easement to
be dedicated. We have processed your application fee. The next step will be to fill out a deed for the easement. The template can be found at https://www.fcgov.com/engineering/devrev.php
under the document entitled General Deed. In the third blank within the template, please write Utilities. You will need to fill in the blanks and have your attorney sign this document
when it is completed. If you have questions, please feel free to contact me at sbuckingham@fcgov.com or 9704164344.06/07/2021: Please indicate if there are existing utility easements
on or around the property, including in the alley. If there are no existing easements, the applicant will need to dedicate easements as part of this project.Department: Technical ServicesContact:
Jeff County, 9702216588, jcounty@fcgov.comTopic: Site PlanComment Number: 1 Comment Originated: 06/07/202109/28/2021: FOR FINAL APPROVALUNRESOLVED:Please revise the
legal description as marked. See redlines.Department: Traffic OperationContact: Steve Gilchrist, 9702246175, sgilchrist@fcgov.comTopic: Traffic Impact StudyComment Number: 1
Comment Originated: 06/07/202106/07/2021: FOR INFORMATION ONLY: Traffic Impact Study waived during Conceptual Review. No further comments.Department: Light And PowerContact:
Austin Kreager, 9702246152, akreager@fcgov.comTopic: GeneralComment Number: 3 Comment Originated: 06/08/202106/08/2021: INFORMATION:Electric Capacity Fee, Building Site
charges and any system modification charges necessary will apply to this development.Comment Number: 4 Comment Originated: 06/08/202106/08/2021: INFORMATION:You may contact
Austin Kreager, project engineering if you have questions. (970) 2246152. You may reference Light & Power’s Electric Service Standards at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_FINAL_18November2016_Amendment.pdfYou
may reference our policies, development charge processes, and use our fee estimator at http://www.fcgov.com/utilities/business/buildersanddevelopers.Department: Outside AgenciesContact:
Don Kapperman, don_kapperman@comcast.com, Topic: GeneralComment Number: 1 Comment Originated: 06/01/202107/21/2021: 07/21/2021: If Comcast facility needs to be moved in
the alley then the owner / developer will have to cover the cost to relocate.