Loading...
HomeMy WebLinkAbout205 E PLUM ST CARRIAGE HOUSE - FDP210013 - SUBMITTAL DOCUMENTS - ROUND 3 - RESPONSE TO STAFF REVIEW COMMENTSCommunity Development and Neighborhood Services 281 North College AvenuePO Box 580Fort Collins, CO 80522970.221.6689970.224.6134 faxfcgov.com/developmentreviewAugust 13, 2021John Runkles 205 E Plum StFort Collins, CO 80524RE: 205 E Plum St Carriage House, FDP210013, Round Number 2Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of 205 E Plum St Carriage House. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Tenae Beane via phone at 9702246119 or via email at tbeane@fcgov.com. Comment Summary:Department: Development Review CoordinatorContact: Tenae Beane, 9702246119, tbeane@fcgov.comTopic: GeneralComment Number: 1 Comment Originated: 06/08/202106/08/2021: INFORMATION:I will be your primary point of contact throughout the development review and permitting process. If you have any questions, need additional meetings with the project reviewers, or need assistance throughout the process, please let me know and I can assist you and your team. Please include me in all email correspondence with other reviewers and keep me informed of any phone conversations. Thank you!Comment Number: 2 Comment Originated: 06/08/202106/08/2021: INFORMATION:As part of your resubmittal you will respond to the comments provided in this letter. This letter is provided to you in Microsoft Word format. Please use this document to insert responses to each comment for your submittal, using a different font color. When replying to the comment letter please be detailed in your responses, as all comments should be thoroughly addressed. Provide reference to specific project plans or explanations of why comments have not been addressed, when applicable, avoiding responses like noted or acknowledged.Comment Number: 3 Comment Originated: 06/08/202106/08/2021: INFORMATION:Please follow the Electronic Submittal Requirements and File Naming Standards found at https://www.fcgov.com/developmentreview/files/electronic submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888. File names should begin with the file type, followed by the project information, and round number. Example: UTILITY PLANS_PROJECT NAME_PDP_Rd2.pdfComment Number: 4 Comment Originated: 06/08/202106/08/2021: INFORMATION:Resubmittals are accepted any day of the week, with Wednesday at noon being the cutoff for routing the same week. When you are ready to resubmit your plans, please notify me advanced notice as possible.Comment Number: 5 Comment Originated: 06/08/202106/08/2021: INFORMATION:Temporary Service Changes City of Fort Collins Development ReviewIn order to continue providing thorough reviews and giving every project the attention it deserves, the City of Fort Collins is implementing temporary changes in how we serve our development customers. As you may be aware, we are experiencing staff shortages in a number of key departments, which has begun to impact the timeliness of our reviews. We recognize that development and construction play a critical role in our community’s vibrancy and economic recovery, and we have been exploring options for mitigating impacts to ourcustomers. As a result, we will be making some temporary service changes.Beginning Monday May 10th one additional week of review time will be added to all 1st and 2nd round submittals (increase from 3 weeks to 4 weeks).Comment Number: 6 Comment Originated: 06/08/202106/08/2021: INFORMATION:LUC 2.211 Lapse, Rounds of Review: Applicants, within one hundred eighty (180) days of receipt of written comments and notice to respond from the Cityon any submittal (or subsequent revision to a submittal) of an application for approval of a development plan, shall file such additional or revised submittal documents as are necessary to address such comments from the City. If the additional submittal information or revised submittal is not filed within said period of time, the development application shall automatically lapse and become null and void.Comment Number: 7 Comment Originated: 06/08/202106/08/2021: FOR HEARING:The proposed development project is subject to a Type 1 Review. The decision maker for your project will be an Administrative Hearing Officer at a public hearing. For the hearing, we will formally notify surrounding property owners within 800 feet (excluding public rightofway and publicly owned open space). As your Development Review Coordinator, I will assist with preparing the mailing and coordinating the hearing date with your team.Comment Number: 8 Comment Originated: 06/08/202106/08/2021: FOR HEARING:All "For Hearing" comments need to be addressed and resolved prior to moving forward with scheduling the Hearing. Staff would need to be in agreement the project is ready for Hearing approximately 3 5 weeks prior to the hearing.Department: Planning ServicesContact: Clark Mapes, 9702216225, cmapes@fcgov.comTopic: GeneralComment Number: 2 Comment Originated: 08/10/202108/12/2021: See my email regarding crucial staff findings on the modification request. Parking Issue resolved by adding 2 compact parking places, no modification needed.Comment Number: 3 Comment Originated: 08/12/202108/10/2021: Parking would have to be improved with gravel, with a viable cross section design and edge containment. But this is a secondary consideration to the comment above.Inspected by Wes Lamarque, 5 of the 6 spaces already have gravel.In order tomatch existing gravel, in the 6th space will have no barrier below, and not be retained as it meets the gravel alley. We will use the same type of gravel that is currently in the alley.Comment Number: 4 Comment Originated: 08/12/202108/12/2021: One other thing that I don't recall discussing is the floor area limit in the rear yard. That's 33% of the area of the rear half of the lot. It APPEARS to not be an issue. And like all other comments, secondary to #2.Floor area is 700 square feet (435 per level). Rear half of lot is 3,500 square feet. We are using 20% of rear half of lot.Department: Engineering Development ReviewContact: Sophie Buckingham, sbuckingham@fcgov.comTopic: GeneralComment Number: 2 Comment Originated: 06/07/202108/04/2021: Thank you for submitting a legal description of the easement to be dedicated. We have processed your application fee. The next step will be to fill out a deed for the easement. The template can be found at https://www.fcgov.com/engineering/devrev.php under the document entitled General Deed. In the third blank within the template, please write Utilities. You will need to fill in the blanks and have your attorney sign this document when it is completed. If you have questions, please feel free to contact me at sbuckingham@fcgov.com or 9704164344.06/07/2021: Please indicate if there are existing utility easements on or around the property, including in the alley. If there are no existing easements, the applicant will need to dedicate easements as part of this project.Comment Number: 3 Comment Originated: 06/07/202108/04/2021: Thank you for indicating on the site plan that the new electric utility line will be installed underground.06/07/2021: The City of Fort Collins Land Use Code Section 3.3.2.D.7 requires new utility lines to be installed underground. Please install the new electric utility line for the carriage house underground.Department: WaterWastewater EngineeringContact: Wes Lamarque, 9704162418, wlamarque@fcgov.comTopic: GeneralComment Number: 2 Comment Originated: 08/10/202108/10/2021: FOR APPROVAL:The existing sewer service is under the garage. Also, the plan does not show how the new carriage house will be connected to the existing sewer service. The sewer service needs to be relocated out from under the garage and routed around the new carriage house. Also, please show how the new carriage house will be connected to the existing sewer service.Upon inspection, Wes Lamarque approve our plan for using a Y connection to tie into the sewer in the parking lot, and NOT relocate the sewer that is currently under the building. The impervious area is listed on a table in the upper right hand of the site plan. It is 350 square feet.Department: Light And PowerContact: Austin Kreager, 9702246152, akreager@fcgov.comTopic: GeneralComment Number: 3 Comment Originated: 06/08/202106/08/2021: INFORMATION:Electric Capacity Fee, Building Site charges and any system modification charges necessary will apply to this development.Comment Number: 4 Comment Originated: 06/08/202106/08/2021: INFORMATION:You may contact Austin Kreager, project engineering if you have questions. (970) 2246152. You may reference Light & Power’s Electric Service Standards at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_FINAL_18November2016_Amendment.pdfYou may reference our policies, development charge processes, and use ourfee estimator at http://www.fcgov.com/utilities/business/buildersanddevelopers.Department: Building ServicesContact: Katy Hand, khand@fcgov.comTopic: Building Insp Plan ReviewComment Number: 2 Comment Originated: 08/09/202108/09/2021: 13D fire suppression system is required per PFA. 13D systems need to be submitted for permit to PFA and must be installed by a licensed fire suppression contractor.Contact: Russell Hovland, 9704162341, rhovland@fcgov.comTopic: Building Insp Plan ReviewComment Number: 1 Comment Originated: 06/07/202106/07/2021: INFORMATIONAL: A permit is required for this project and construction shall comply with adopted codes as amended. Please visit ourwebsite for a list of current adopted building codes and local amendments for building permit submittal: https://www.fcgov.com/building/codes.phphttps://www.fcgov.com/building/energycodePlease read the residential permit application submittal checklist for complete requirements.Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.Frost Depth: 30 inches.Wind Loads: Risk Category II (most structures):· 140mph (Ultimate) exposure B or· Front Range Gust Map published by The Structural Engineer's Association of  Seismic Design: Category B.Climate Zone: Zone 5Energy Code: Current IRC chapter 11 + local amemdments. INFORMATIONAL ITEMS: · 3ft min setback from roof overhang to property line is required for fire sprinkled houses.· Bedroom egress windows (emergency escape openings) required in all bedrooms.· Prescriptive energy compliance with increased insulation values is required for buildings using electric heat.· A passing building air tightness (blower door) test is required for certificate of occupancy.Department: Technical ServicesContact: Jeff County, 9702216588, jcounty@fcgov.comTopic: Site PlanComment Number: 1 Comment Originated: 06/07/202108/10/2021: FOR FINAL APPROVAL:Please revise the legal description as marked. See redlines.06/07/2021: FOR FINAL APPROVAL:Please revise the legal description as marked. See redlines.Department: Outside AgenciesContact: Don Kapperman, don_kapperman@comcast.com, Topic: GeneralComment Number: 1 Comment Originated: 06/01/202107/21/2021: 07/21/2021: If Comcast facility needs to be moved in the alley then the owner / developer will have to cover the cost to relocate.06/01/2021: Comcast doenot have any issues. Thank you