September 10, 2021
Alex Garvert
Ripley Design Inc
419 Canyon Ave Suite 200
Fort Collins, CO 80524
RE: Kechter Farm Mixed-Use Townhomes, FDP210021, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Kechter Farm Mixed-Use Townhomes. If you have questions
about any comments, you may contact the individual commenter or direct your quest ions
through your Development Review Coordinator, Tenae Beane via phone at 970-224-6119
or via email at tbeane@fcgov.com.
Ripley Design Inc. Response:
Northern Engineering Response:
Comment Summary:
Department: Development Review Coordinator
Contact: Tenae Beane, 970-224-6119, tbeane@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/07/2021
09/07/2021: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Ripley Design Inc. Response: Thank you Tenae.
Comment Number: 2 Comment Originated: 09/07/2021
09/07/2021: INFORMATION:
As part of your resubmittal you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
2
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable, avoiding responses like noted or
acknowledged.
Ripley Design Inc. Response: Responses to these comments will be included with the next submittal.
Comment Number: 3 Comment Originated: 09/07/2021
09/07/2021: INFORMATION:
Please follow the Electronic Submittal Requirements and File Naming
Standards found at https://www.fcgov.com/developmentreview/files/electronic
submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888.
File names should begin with the file type, followed by the project information,
and round number. Example: UTILITY PLANS_PROJECT
NAME_PDP_Rd2.pdf
Ripley Design Inc. Response: The documents submitted will follow the File Naming Standards shown above.
Northern Engineering Response: The documents submitted will follow the File Naming Standards shown above.
Comment Number: 4 Comment Originated: 09/07/2021
09/07/2021: INFORMATION:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are ready to resubmit your
plans, please notify me advanced notice as possible.
Ripley Design Inc. Response: We are re-submitting on Wednesday, September 14. We will notify you as soon as we are sure that
the submittal package is complete and ready to submit.
Comment Number: 5 Comment Originated: 09/07/2021
09/07/2021: INFORMATION:
Temporary Service Changes - City of Fort Collins Development Review
In order to continue providing thorough reviews and giving every project the
attention it deserves, the City of Fort Collins is implementing temporary
changes in how we serve our development customers. As you may be aware,
we are experiencing staff shortages in a number of key departments, which has
begun to impact the timeliness of our reviews. We recognize that development
and construction play a critical role in our community’s vibrancy and economic
recovery, and we have been exploring options for mitigating impacts to our
customers. As a result, we will be making some temporary service changes.
Beginning Monday May 10th one additional week of review time will be added
to all 1st and 2nd round submittals (increase from 3 weeks to 4 weeks).
Ripley Design Inc. Response: After discussing with staff, we are hoping for a 2 week staff review turn around.
Comment Number: 6 Comment Originated: 09/07/2021
09/07/2021: FOR FINAL APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this
3
project. I will provide a recording checklist and process information when we
are closer to this step.
Ripley Design Inc. Response: Thank you Tenea.
Northern Engineering Response: Understood, thank you.
Department: Planning Services
Contact: Clark Mapes, 970-221-6225, cmapes@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/07/2021
09/07/2021: IFOR FINAL APPROVAL ONLY: Back to the semantics from the
hearing: On Site Plan sheets 2 & 3 please add
'(Modification of Standards Approved)'
to the Major Walkway Spine' labels. Not a big deal, but staff is constantly trying
to build common understanding about the code, and, it will prevent
questions/confusion in the future.
Ripley Design Inc. Response: The above note has been added to the Major Walkway Spine lables on site plan sheets 2 & 3.
Comment Number: 2 Comment Originated: 09/07/2021
09/07/2021: Similarly, on the Site Plan please add a note, looks like #20:
Modifications Approved: "Two modifications of standards were approved for
Building Variation and Building Orientation to Streets."
Ripley Design Inc. Response: The above note has been added to the “General Notes” section on the Cover sheet.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: General
Comment Number: 7 Comment Originated: 09/08/2021
9/8/2021: FOR FINAL APPROVAL
Please review Forestry redlines to review final tree-utility conflicts.
Ripley Design Inc. Response: Tree noted in redlines has been adjusted to avoid utility conflict with a main line.
5/24/2021: FOR FINAL
Final tree counts and tree/utility separation to be verified at FDP.
Ripley Design Inc. Response: Understood and thank you for reviewing the plans while Nils is away.
Comment Number: 8 Comment Originated: 09/08/2021
9/8/2021: FOR FINAL APPROVAL
EX1 of the utility plans, specifically the tree removal plan, is incorrect and not
consistent with the tree removal, protection, and transplant plans on the
landscape plans. Please update the utility plans to show the specific trees which
are to be protected and transplanted. Refer to pages 8 and 9 of the landscape
plan. Additionally, please include the City of Fort Collins Tree Protection notes
to the demo plan within the utility set.
Ripley Design Inc. Response: We have coordinated with Northern Engineering to ensure our Tree Mitigation plans match the Utility
Demo Plan.
Northern Engineering Response: The Tree Mitigation plans and Demolition plans have been coordinated to provide consistent
4
information, including the Tree Protection notes.
Comment Number: 9 Comment Originated: 09/08/2021
9/8/2021: FOR FINAL APPROVAL
There is a storm main or other utility shown within the right of way along Ziegler
Rd. Please clarify what this utility is and if it is private or public, to stay in use or
be abandoned. The shade tree separation is less than 2-ft in some locations,
which is not preferred from a tree health perspective or longevity of the utility. If
this is a proposed utility, please explore shifting it further away from the
proposed trees (10-ft).
Ripley Design Inc. Response: Northern went to the field and verified the storm drain showing in the right of way along Ziegler does
not and exist and has been removed from the Site and Landscape plan.
Comment Number: 10 Comment Originated: 09/08/2021
9/8/2021: DEVELOPMENT AGREEMENT
Forestry provided DA language to City Engineer, Dave Betley.
Ripley Design Inc. Response: Thank you for taking care of that Dave B.
Department: Engineering Development Review
Contact: Dave Betley, 970-221-6573, dbetley@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/24/2021
08/24/2021: FOR APPROVAL: Please label the storms drain on the plans as
public or private. The designation helps with the construction inspection.
Northern Engineering Response: Storm labels have been updated to reflect private and public lines.
Comment Number: 2 Comment Originated: 08/24/2021
08/24/2021: FOR APPROVAL: The development will need a variance for the
location of the driveway in Ziegler Road. There is an existing driveway located
approximately 150 feet to the south of the project. The existing driveway is low
volume. Please draft the request and submit the request with the next plan
review.
Northern Engineering Response: A variance request will be provided at the next plan review.
Comment Number: 3 Comment Originated: 08/24/2021
08/24/2021: FOR APPROVAL: Please add spot elevations at the top and
bottom of all the handicapped ramps. The ramps are located within the arc of
the curb returns. Can they be constructed to meet ADA slopes? The engineer
may want to provide more information on the plans to show that they meet ADA.
Northern Engineering Response: Spot elevations have been included for the plan review and have been configured to provide
ADA compliance.
Comment Number: 4 Comment Originated: 09/07/2021
5
09/07/2021: FOR APPROVAL: The applicant will need to enter into a
Development Agreement for the project.
Ripley Design Inc. Response: Black Timber has submitted a Development Agreement Form.
Northern Engineering Response: Understood.
Comment Number: 5 Comment Originated: 09/08/2021
09/08/2021: FOR APPROVAL: There is a new storm drain line listed on the
plans along Ziegler Road. The engineer has claimed that this does not exist.
Please verify if this storm drains exists or not. The current location could
interfere with the placement of the street trees and needs to be resolved before
approval.
Northern Engineering Response: Based on best available information it is believed the storm drain line listed on the plans along
Ziegler Road
Department: Traffic Operation
Contact: Steve Gilchrist, 970-224-6175, sgilchrist@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/06/2021
09/06/2021: FOR FINAL APPROVAL: The Stop signs for the two exits of this
development should be placed in advance of the sidewalks as you approach
Trilby and Ziegler. The No Left Turn sign (symbol) will need to be placed on the
backside of the existing eastbound Keep Right sign, and the No Left Turn
plaque (word version) is not required. Please call out in the plans.
Ripley Design Inc. Response: Sign location updated at both site entrances.
Northern Engineering Response: Sign locations have been updated and the No Left Turn sign is called out as requested.
Department: Erosion Control
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 09/02/2021
09/02/2021: FOR FINAL APPROVAL:
Please submit an Erosion Control Escrow / Security Calculation based upon the
accepted Erosion Control Plans to meet City Criteria. (FCDCM Ch 2 Section
6.1.5)
Northern Engineering Response: The aforementioned Calculations have been provided.
Please address all redlined comments provided on the plans.
Northern Engineering Response: All red lines on the Erosion Control sheet have been addressed.
Comment Number: 2 Comment Originated: 09/02/2021
09/02/2021: INFORMATION ONLY:
The City Manager’s development review fee schedule under City Code 7.5 -2
was updated to include fees for Erosion Control and Stormwater Inspections.
6
As of January 1st, 2021, these fees will be collected on all projects for such
inspections.
The Erosion Control fees are based on; the number of lots, the total site
disturbance, the estimated number of years the project will be active and the
Stormwater Inspection Fees are based on the number of LID/WQ Features that
are designed for on this project.
Based on the proposed site construction associated with this project we are
assuming 6 lots, 2.66 acres of disturbance, 1 years from demo through build out
of construction and an additional 3 years till full vegetative stabilization due to
seeding. Which results in an Erosion Control Fee estimate of $1435.1.
Since no Water Quality or LID facilities are proposed there is no Water Quality
Inspection Fee.
Please note that as the plans and any subsequent review modifications of the
above-mentioned values change the fees may need to be modified. I have
provided a copy of the spreadsheet used to arrive at these estimates for you to
review.
Northern Engineering Response: Understood. We will review the spreadsheet and provide any follow up questions.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 09/07/2021
09/07/2021: No additional comments from Stormwater Engineering.
Northern Engineering Response: Noted.
Department: Light And Power
Contact: Cody Snowdon, 970-416-2306, csnowdon@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/08/2021
09/08/2021: FOR APPROVAL:
Please see redlines for minor revisions and cleanup items.
Northern Engineering Response: Redlines and minor revisions have been addressed.
Department: Environmental Planning
Contact: Scott Benton, (970)416-4290, sbenton@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/07/2021
09/07/2021: 09/02/2021: FOR FINAL APPROVAL: It appears that there is no
transition from irritated turf to the prairie seed mix along the southern side of the
paved walkway where the northwestern portion of irrigated turf other than a
change in hatching on the landscape plan. Depending on the turf species used,
7
it can slowly creep into the prairie seed mix. Please provide some kind of
barrier (perennial bed, impermeable surface, etc.) to facilitate that irrigated turf
to native transition.
Ripley Design Inc. Response: We have included a shrub bed between the irrigated turf and native seed to prevent the two different
mixes from spreading into each other.
Comment Number: 2 Comment Originated: 09/07/2021
09/07/2021: 09/02/2021: FOR FINAL APPROVAL: Please clarify specific turf
species on the Landscape Plan and the blend percentages to ensure the
project water budget chart gets adequately calculated.
Ripley Design Inc. Response: We have added the turf species mix to the landscape plans. I have reached out to the supplier for the
seed mix percentage, but they were unable to provide that information. I reached out to Scott Benton and Kelly Smith about a
suggested turf mix
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 09/02/2021
09/02/2021: FOR FINAL APPROVAL:
Please provide the following information for the Benchmark Statement in the
EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM - X.XX’.
Northern Engineering Response: The Benchmark Statement has been updated using the format provided.
Comment Number: 4 Comment Originated: 09/02/2021
09/02/2021: FOR FINAL APPROVAL:
Some of the sheet titles in the sheet index do not match the sheet titles on the
noted sheets. See redlines.
Northern Engineering Response: The sheet index has been revised to reflect the appropriate sheet titles.
Comment Number: 5 Comment Originated: 09/02/2021
09/02/2021: FOR FINAL APPROVAL:
There are spelling issues. See redlines.
8
Northern Engineering Response: Spelling issues have been addressed.
Comment Number: 6 Comment Originated: 09/02/2021
09/02/2021: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Northern Engineering Response: The line over text issues have been addressed.
Comment Number: 7 Comment Originated: 09/02/2021
09/02/2021: FOR FINAL APPROVAL:
There are text over text issues. See redlines.
Northern Engineering Response: The text over text issues have been resolved.
Comment Number: 8 Comment Originated: 09/02/2021
09/02/2021: FOR FINAL APPROVAL:
There is text that needs to be masked. Mask all text in hatched areas. See
redlines.
Northern Engineering Response: All text has been masked.
Topic: Plat
Comment Number: 1 Comment Originated: 09/02/2021
09/02/2021: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter. If you have any specific questions about the redlines, please contact John
Von Nieda at 970-221-6565 or jvonnieda@fcgov.com
Northern Engineering Response: The plat has been updated per the requested corrections. Northern is in agreement with the
requested redlines.
Topic: Site Plan
Comment Number: 2 Comment Originated: 09/02/2021
09/02/2021: FOR FINAL APPROVAL:
Some of the sheet titles in the sheet index do not match the sheet titles on the
noted sheets. See redlines.
Ripley Design Inc. Response: Updated the sheet index on the cover sheet to match all sheet titles in the Site Plan and Landscape
Plan sheet sets.
Department: Outside Agencies
Contact: Don Kapperman, Comcast, don_kapperman@comcast.com,
Topic: General
Comment Number: 1 Comment Originated: 08/19/2021
08/19/2021: Comcast does not have any issues.
Ripley Design Inc. Response: Thank you.
Contact: Sam Lowe, Fort Collins-Loveland Water District, 970-226-3104,
slowe@fclwd.com,
Topic: General
Comment Number: 2 Comment Originated: 09/03/2021
09/03/2021: Please see attached comments from FCLWD and SFSD.
Northern Engineering Response: Response to comments have been addressed and coordinated with outside agencies including
9
the availability of the existing easement provided on the 3rd Filing plat.