HomeMy WebLinkAboutSTANFORD SENIOR LIVING - FDP210017 - SUBMITTAL DOCUMENTS - ROUND 2 - ELEVATIONSSTUCCO 2
CEMENTITIOUS
SIDING
SPLIT FACE CMU
STUCCO 1
GARAGE OPENING-
METAL FRAME W/ MESH
SCREENS
ALUMINUM
STOREFRONT
VINYL WINDOW
STUCCO 2 STUCCO 1STEEL RAILING
CEMENTITIOUS
SIDING
PREFINISHED METAL
WALL CAP
STUCCO
REVEAL
SITE WALL AND
FENCE BEYOND
STUCCO
BANDING
PREFINISHED
METAL FASCIA
MONROE
AVE.
147' - 6"
149' - 6"
MECHANICAL SCREEN
BEYOND -EMBOSSED
METAL PANEL
ROOF ACCESS
STAIR TOWER
STEEL
SUNSHADE
MECHANICAL LOUVER
BASEMENT LEVEL
90' - 0"
FIRST FLOOR LEVEL
112' - 0"
SECOND FLOOR LEVEL
THIRD FLOOR LEVEL
134' - 7"
FOURTH FLOOR LEVEL
LAMBSTONGUE65' - 5 3/4"100' - 0"
STEEL BALCONY
AND RAILING
123' - 3 1/2"123' - 3 1/2"
1. ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF, TYP
EXTERIOR ELEVATION GENERAL NOTES
EXTERIOR FINISH SCHEDULE
STUCCO 1 COLOR LIGHT GREY
STUCCO 2 COLOR DARK GREY
STONE COLOR TAN
CEMENTITIOUS SIDING DARK BROWN
TRIM DARK GREY & LIGHT GREY
SPLIT FACE CMU DARK GREY
STEEL SUNSHADES DARK GREY
STOREFRONT FRAME BLACK
BALCONY RAILING BLACK
GARAGE ENTRY GARAGE OPENING -
METAL FRAME W/ MESH
SCREENS, DARK GREY
ALUMINUM
STOREFRONT
CEMENTITIOUS
SIDING
MANUFACTURED
STONE VENEER
STUCCO 2
STUCCO 1
WALL MOUNTED
LIGHT FIXTURE
SPLIT FACE CMU
MECHANICAL LOUVER
CEMENTITIOUS SIDING
PREFINISHED
METAL WALL CAP
STEEL RAILING
STEEL SUNSHADE
STEEL SUNSHADE
VINYL WINDOW
MANUFACTURED STONE SILL
PRECAST
CONCRETE HEADER
SPLIT FACE
CMUPORTE
COCHERE
STUCCO
REVEAL
MECHANICAL SCREEN -
EMBOSSED METAL PANEL
MECHANICAL SCREEN -
EMBOSSED METAL PANEL
ADDRESS
NUMBERS
147' - 6"
ROOF ACCESS STAIR TOWER
MECHANICAL SCREEN BEYOND -
EMBOSSED METAL PANEL
STUCCO BANDINGMECHANICAL VENT
VINYL WINDOW
STUCCO 1
PREFINISHED METAL FASCIA
PRECAST
CONCRETE
HEADER
PRECAST CONCRETE SILL
CEMENTITIOUS SIDING ALUMINUM
STOREFRONT
RECESSED SPLIT FACE CMU BANDINGRECESSED SPLIT FACE CMU BANDING
100' - 0"
FIRST FLOOR LEVEL
BRAKE METAL
ACCENT
PRECAST
CONCRETE SILL
PREFINISHED METAL WALL CAP
STUCCO BANDING
STEEL
SUNSHADE
CEMENTITIOUS
SIDING
STUCCO 1
STUCCO 2
149' - 6"
LOW SITE WALL
SITE FENCE
STEEL
RAILING
100' - 0"
MECHANICAL SCREN BEYOND -
EMBOSSED METAL PANEL
MECHANICAL
VENT
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DESIGN
STRUCTURAL ENGINEER:
RAKER RHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTEGRATED MECHANICAL, LLC
ELECTRICAL ENGINEER:
APS INC. ELECTRICAL ENGINEERS
9/8/2021 9:04:30 AM9/8/2021 9:04:30 AMC:\Users\laura\Documents\STANFORD_v20_Laura_vfla.rvtA1
EXTERIOR
ELEVATIONS
STANFORD
SENIOR LIVING
FORT COLLINS, CO
PLANNING SUBMITTAL
2020-35
SCALE:1/16" = 1'-0"2 PLANNING ELEVATION -EAST
SCALE:1/16" = 1'-0"1 PLANNING ELEVATION -SOUTH
SCALE:1/16" = 1'-0"3 PLANNING ELEVATION -NORTHEAST
SCALE:4 PERSPECTIVE VIEW -SOUTHEAST CORNER
PLANNING SUBMITTAL 1 12-23-2020
PLANNING RESUBMITTAL 1 03-31-2021
PLANNING SUBMITTAL 2 04-28-2021
FDP PLANNING SUBMITTAL 07-14-2021
FDP PLANNING SUBMITTAL 09-08-2021
CEMENTITIOUS
SIDING
STUCCO 1 STUCCO 2 ALUMINUM
STOREFRONT
PREFINISHED
METAL WALL CAP
STEEL
SUNSHADE
STUCCO BANDING
VINYL
WINDOW
MECHANICAL SCREEN
BEYOND
MECHANICAL SCREEN
BEYOND
149' - 6"
147' - 6"
100' - 0"
EXTERIOR EXIT STAIR
1. ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF, TYP
EXTERIOR ELEVATION GENERAL NOTES
EXTERIOR FINISH SCHEDULE
STUCCO 1 COLOR LIGHT GREY
STUCCO 2 COLOR DARK GREY
STONE COLOR TAN
CEMENTITIOUS SIDING DARK BROWN
TRIM DARK GREY & LIGHT GREY
SPLIT FACE CMU DARK GREY
STEEL SUNSHADES DARK GREY
STOREFRONT FRAME BLACK
BALCONY RAILING BLACK
STUCCO BANDING
STUCCO 1
STUCCO 2
STEEL SUNSHADE STUCCO REVEAL
STEEL RAILING
CEMENTITIOUS SIDING
ALUMINUM STOREFRONT MECHANICAL VENT
STUCCO 2
STUCCO BANDING
STUCCO 1
147' - 6"
100' - 0"
SPLIT FACE
CMU
STEEL SUNSHADE
VINYL WINDOW
CEMENTITIOUS SIDING
ALUMINUM STOREFRONT
PREFINISHED METAL
WALL CAP
ROOF ACCESS
STAIR TOWER
ROOF ACCESS
STAIR TOWER
VINYL WINDOW
MECHANICAL SCREEN
BEYOND -EMBOSSED
METAL PANEL
147' - 6"148' - 6"149' - 6"
EXTERIOR EXIT
STAIR BEYOND
STUCCO 1
STUCCO 2
PREFINISHED METAL
WALL CAP
STEEL SUNSHADE
CEMENTITIOUS SIDINGMECHANICAL VENTVINYL
WINDOW
STUCCO BANDING
STUCCO REVEAL
100' - 0"
149' - 6"149' - 6"148' - 6"
STEEL RAILING
147' - 6"
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DESIGN
STRUCTURAL ENGINEER:
RAKER RHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTEGRATED MECHANICAL, LLC
ELECTRICAL ENGINEER:
APS INC. ELECTRICAL ENGINEERS
9/8/2021 9:05:08 AM9/8/2021 9:05:08 AMC:\Users\laura\Documents\STANFORD_v20_Laura_vfla.rvtA2
EXTERIOR
ELEVATIONS
STANFORD
SENIOR LIVING
FORT COLLINS, CO
PLANNING SUBMITTAL
2020-35
SCALE:1/16" = 1'-0"2 PLANNING ELEVATION -WEST
SCALE:1/16" = 1'-0"1 PLANNING ELEVATION -NORTH
SCALE:1/16" = 1'-0"3 PLANNING ELEVATION -NORTHWEST
SCALE:4 PERPSECTIVE VIEW -NORTHWEST CORNER
PLANNING SUBMITTAL 1 12-23-2020
PLANNING RESUBMITTAL 1 03-31-2021
PLANNING SUBMITTAL 2 04-28-2021
FDP PLANNING SUBMITTAL 07-14-2021
FDP PLANNING SUBMITTAL 09-08-2021
A37
A3
3
A3 4
A3
8
20' - 0"STEEL DOORS, PAINT DARK GREY
8" SPLIT FACE CMU,
DARK GREY
CONCRETE PAD
28' - 0"
SLOPE
GENERATOR
CONTINUOUS STEEL ANGLE,
PAINT BLACK
6 YARD
DUMPSTER, TYP.
95 GALLON
RECEPTACLE, TYP.
SPLIT FACE CMU, DARK GREY
PREFINISHED METAL WALL CAP, BLACK
108' - 2 1/2"
108' - 2 1/2"
SPLIT FACE CMU,
DARK GREY
PREFINISHED METAL WALL CAP, BLACK
STEEL DOOR,
PAINTED BLACK
SPLIT FACE CMU
108' - 2 1/2"
PREFINISHED METAL
WALL CAP, BLACK
SPLIT FACE
CMU -DARK
GREY
STEEL DOORS, PAINT
DARK GREY
108' - 2 1/2"
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DESIGN
STRUCTURAL ENGINEER:
RAKER RHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTEGRATED MECHANICAL, LLC
ELECTRICAL ENGINEER:
APS INC. ELECTRICAL ENGINEERS
9/8/2021 9:06:27 AM9/8/2021 9:06:27 AMC:\Users\laura\Documents\STANFORD_v20_Laura_vfla.rvtA3
PERSPECTIVE VIEWS
STANFORD
SENIOR LIVING
FORT COLLINS, CO
PLANNING SUBMITTAL
2020-35
SCALE:1 PERSPECTIVE VIEW -SOUTHWEST
SCALE:2 PERSPECTIVE VIEW -NORTHEAST
SCALE:5 PERSPECTIVE VIEW -PORTE COCHERE
PLANNING SUBMITTAL 1 12-23-2020
PLANNING RESUBMITTAL 1 03-31-2021
PLANNING SUBMITTAL 2 04-28-2021
FDP PLANNING SUBMITTAL 07-14-2021
FDP PLANNING SUBMITTAL 09-08-2021
SCALE:1/8" = 1'-0"6 ENLARGED PLAN -TRASH ENCLOSURE FDP
SCALE:1/8" = 1'-0"4 TRASH ENCLOSURE ELEVATION WEST
SCALE:1/8" = 1'-0"3 TRASH ENCLOSURE ELEVATION SOUTH
SCALE:1/8" = 1'-0"8 TRASH ENCLOSURE ELEVATION NORTH
SCALE:1/8" = 1'-0"7 TRASH ENCLOSURE ELEVATION EAST
DIGITAL MATERIAL BOARD LEGEND
STUCCO TEXTURE CEMENTITIOUS LAP SIDING
CEMENTITOUS SIDING COLOR
DARK BROWNSTUCCO 2 COLOR (DARK GREY)STUCCO 1 COLOR (LIGHT GREY)
STOREFRONT FRAME VINYL WINDOW FRAMESYNTHENTIC STONE
FRAME COLOR (BLACK)FRAME COLOR (DARK TAN)
STEEL SUNDHADES
SPLIT FACE CMU
CEMENTITIOUS SHIPLAP SIDING
CEMENTITOUS SIDING COLOR
DARK BROWN
METAL SCREEN AT GARAGE
OPENINGS (BLACK)
FRAME COLOR (BLACK)
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DESIGN
STRUCTURAL ENGINEER:
RAKER RHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTEGRATED MECHANICAL, LLC
ELECTRICAL ENGINEER:
APS INC. ELECTRICAL ENGINEERS
9/8/2021 9:06:44 AM9/8/2021 9:06:44 AMC:\Users\laura\Documents\STANFORD_v20_Laura_vfla.rvtA4
DIGITAL MATERIAL
BOARD
STANFORD
SENIOR LIVING
FORT COLLINS, CO
PLANNING SUBMITTAL
2020-35
SYNTHETIC STONE
SPLIT FACE CMU SHIP LAP SIDING
STUCCO COLOR 1
STUCCO COLOR 2
GAURDRAIL
ROOF TOP PATIO
STUCCO COLOR 2
CEMENTITIOUS
SIDING
SYNTHETIC STONE
VINYL WINDOW
STOREFRONT
ASSEMBLY
STUCCO COLOR 2PORTE COCHERE
SHIP LAP SIDING
PLANNING SUBMITTAL 1 12-23-2020
PLANNING RESUBMITTAL 1 03-31-2021
PLANNING SUBMITTAL 2 04-28-2021
FDP PLANNING SUBMITTAL 07-14-2021
FDP PLANNING SUBMITTAL 09-08-2021
SUNSHADE
MANUFACTURED STONE VENEER
PRECAST CONCRETE SILL
RECESSED SPLIT FACE CMU
ALUMINUM STOREFRONT
PRECAST CONCRETE HEADER
PRECAST CONCRETE SILL
STUCCO
SPLIT FACE CMU
PRE CAST HEADER
METAL FRAME W/ MESH SCREENS
VINYL WINDOW
CEMENTITIOUS SIDING
MANUFACTURED
STONE VENEER
PRECAST
CONCRETE SILL
RECESSED SPLIT
FACE CMU
ALUMINUM
STOREFRONT
PRECAST CONCRETE
HEADER
PRECAST CONCRETE
SILL
STUCCO
STUCCO 2
VINYL WINDOW
CEMENTITIOUS SIDING
STUCCO 2
STUCCO 1
VINYL WINDOW
STUCCO REVEAL
MANUFACTURED
STONE VENEER
PRECAST
CONCRETE SILL
RECESSED SPLIT
FACE CMU
SPLIT FACE CMU
PRE CAST HEADER
METAL FRAME W/
MESH SCREENS
RECESSED SPLIT
FACE CMU
STUCCO BAND
STUCCO
VINYL WINDOW
CEMENTITIOUS SIDING
5
A5
3
A5
6
A5
4
A5
4
A5
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DESIGN
STRUCTURAL ENGINEER:
RAKER RHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTEGRATED MECHANICAL, LLC
ELECTRICAL ENGINEER:
APS INC. ELECTRICAL ENGINEERS
9/8/2021 9:06:49 AM9/8/2021 9:06:49 AMC:\Users\laura\Documents\STANFORD_v20_Laura_vfla.rvtA5
ELEVATION DETAILS
STANFORD
SENIOR LIVING
FORT COLLINS, CO
PLANNING SUBMITTAL
2020-35
PLANNING SUBMITTAL 1 12-23-2020
PLANNING RESUBMITTAL 1 03-31-2021
PLANNING SUBMITTAL 2 04-28-2021
FDP PLANNING SUBMITTAL 07-14-2021
FDP PLANNING SUBMITTAL 09-08-2021
SCALE:1 AXON SOUTH
SCALE:3 WINDOW DETAIL AT FIRST FLOOR LEVEL
SCALE:4 WINDOW AXON AT RESIDENITAL UNIT
SCALE:5 WINDOW DETAIL AT AL UNIT
SCALE:6 WINDOW DETAIL AT GARAGE LEVEL
SCALE:2 AXON NORTH
MONROE DR
STANFORD RD CYCLE
APARTMENTS
MARRIOTT
HOTEL
PARKING LOT
MONROE DR
STANFORD RD CYCLE
APARTMENTS
MARRIOTT
HOTEL
PARKING LOT
MONROE DR
STANFORD RD CYCLE
APARTMENTS
MARRIOTT
HOTEL
PARKING LOT
MONROE DR
STANFORD RD CYCLE
APARTMENTS
MARRIOTT
HOTEL
PARKING LOT
MONROE DR
STANFORD RD CYCLE
APARTMENTS
MARRIOTT
HOTEL
PARKING LOT
MONROE DR
STANFORD RD CYCLE
APARTMENTS
MARRIOTT
HOTEL
PARKING LOT
L.U.C. CODE SECTION 3.2.3 -SOLAR ACCESS, ORIENTATION, SHADING
Project Summary
The proposed project is a four-story senior housing facility located at the southwest corner of
Monroe Dr and Stanford Road. The existing vacant lot is located in the CG (General
Commercial) Zone District and the Transit-Oriented Development Overlay Zone. A shadow study
is provided as required for any building over 40 feet tall. The fourth floor roof line is at 56 feet
above the ground plane along Monroe Drive and 66 feet above the southern parking lot. The
site’s topography slopes to create a walk-out basement condition on the south side of the
property. The shadow study is summarized in the following paragraphs. Per LUC code section
3.2.3 (E), the 25 foot wall comparison is not required because the property is located in the
Transit Overlay District.
Study Overview
A shadow study was performed on the proposed four-story senior housing facility. The shadows
were generated using a computer modeling program called Revit Architecture. Per code section
3.2.3(A), a study must be done on December 21 to demonstrate the longest shadow day of the
year (winter solstice). We included June 21st is our study as well to show the shortest day of the
year (Summer Solstice). This allowed the shadow study to look at the longest and shortest
shadow days of the year. We also looked at three times for each day; 9am, noon, and 3pm. This
allowed the study to look at the change of the shadows throughout the day.
Conclusion
June 21
June 21 is the longest day of the year and the sun is the highest in the sky. This creates the
shortest shadows. Our graphics show that the shadows barely reach off of the property all day
long. The shadows do not affect the Cycle Apartments or adjacent Marriot Hotel.
December 21
On December 21, the longest shadow day of the year, the shadows of the building reach across
Monroe Drive to the Cycle Apartments property at 9am, noon, and 3pm, however the shadows
do not reach the buildings. Even though, the shadows are the longest on this day, the number of
affected buildings has not increased. This is a result of the site's location and relation to Monroe
Drive and Stanford Road.
In final summary, the shadow study shows that the proposed building allows sunlight to the
adjacent buildings throughout all times of the year. The shadows do reach the Cycle Apartment,
Marriot Hotel or Aspen Leaf Apartments on the longest shadow day of the year.
SHADOW STUDY SUMMARY
419 Canyon Ave Suite 200, Fort Collins, CO 80521 | 970.224.1191
108 East Lincolnway, Cheyenne, WY 82001 | 307.635.5710
www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARONSON ARCHITECTURE + INTERIORS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
COPYRIGHT:
SHEET ISSUANCES
DESCRIPTION DATE
N O T F O R C O N S T R U C T I O N
F O R R E F E R E N C E O N L Y
A R C H I T E C T U R E + I N T E R I O R S
CIVIL ENGINEER:
NORTHERN ENGINEERING
LANDSCAPE ARCHITECT:
RIPLEY DESIGN
STRUCTURAL ENGINEER:
RAKER RHODES ENGINEERING
MECHANICAL & PLUMBING ENGINEER:
INTEGRATED MECHANICAL, LLC
ELECTRICAL ENGINEER:
APS INC. ELECTRICAL ENGINEERS
9/8/2021 9:07:23 AM9/8/2021 9:07:23 AMC:\Users\laura\Documents\STANFORD_v20_Laura_vfla.rvtA6
SHADOW STUDY
STANFORD
SENIOR LIVING
FORT COLLINS, CO
PLANNING SUBMITTAL
2020-35SUMMER SOLSTICE
JUNE 21
WINTER SOLSTICE
DECEMBER 21
SCALE:
6 SHADOW STUDY -SUMMER 9AM
SCALE:
5 SHADOW STUDY -SUMMER NOON
SCALE:
4 SHADOW STUDY -SUMMER 3PM
SCALE:
3 SHADOW STUDY -WINTER 9AM
SCALE:
2 SHADOW STUDY -WINTER NOON
SCALE:
1 SHADOW STUDY -WINTER 3PM
PROJECT NORTH
PLANNING SUBMITTAL 1 12-23-2020
PLANNING RESUBMITTAL 1 03-31-2021
PLANNING SUBMITTAL 2 04-28-2021
FDP PLANNING SUBMITTAL 07-14-2021
FDP PLANNING SUBMITTAL 09-08-2021