HomeMy WebLinkAboutNORTHFIELD COMMONS - FDP210022 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY
DELICH Mercy Housing TIS, April 2021 ASSOCIATES
Table 3 shows the short range (2022) total morning and afternoon peak hour
operation at the Suniga/Steeley and Suniga/Right-in Right-out intersections. The
Suniga/Steeley and Suniga/Right-in Right-out intersections will meet the Fort Collins
operational criteria with proposed geometry. Calculation forms for these analyses are
provided in Appendix A.
Table 4 shows the long range (2035) total morning and afternoon peak hour
operation at the Suniga/Steeley and Suniga/Right-in Right-out intersections. The
Suniga/Steeley and Suniga/Right-in Right-out intersections will meet the Fort Collins
operational criteria with proposed geometry. Calculation forms for these analyses are
provided in Appendix B.
In both the short range and long range futures, the operation (level of service) at
the Suniga/Steeley intersection area the same as that at the Suniga/West Site Access
intersection in the cited TIS.
Figure 6 shows the recommended geometry at the Suniga/Steeley and
Suniga/Right-in Right-out intersections. Right-turn lane, approaching the Steeley Drive
and the Right-in/Right-out Access, are not required based upon LCUASS, Figure 8-4. As
an arterial street, Suniga Road should have a four-lane cross and left-turn lanes at the
Suiga/Steeley intersection.
The Mercy Housing development is proposing a right-in/right-out, east of the
Suniga/Steeley intersection. The right-in/right-out is approximately 500 feet from Steeley
Drive and approximately 250 feet from the proposed intersection to the east. It meets
intersection spacing from Steeley Drive. It does not meet intersection from the proposed
intersection to the east. However, it is unlikely that there will be any northbound right-
turning vehicles, from the right-in/right-out access, that will make a left-turn at the proposed
intersection to the east.
It is concluded that the Suniga/Steeley and Suniga/Right-in Right-out
intersections will meet the Fort Collins operational criteria with proposed geometry. As
an arterial street, Suniga Road should have a center median lane to accommodate left-
turning vehicles. It is respectfully requested that no further transportation analyses
related to the proposed development of Mercy Housing be required at this time.
VineCollegeConifer
kory
RedwoodJer
omeBlue SpruceSuniga
SCALE: 1"=1000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Mercy Housing TIS, April 2021
Northfield
Development
Mercy
Housing
SITE PLAN Figure 2
DELICH
ASSOCIATES
Mercy Housing TIS, April 2021
DELICH Mercy Housing TIS, April 2021 ASSOCIATES
TABLE 1
Trip Generation South of Suniga Road per Northfield TIS
Code Use Size AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
220 Condos 65 D.U. 7.32 476 0.11 7 0.35 23 0.35 23 0.21 14
TABLE 2
Revised Trip Generation South of Suniga Road
Code Use Size AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
220 Condos 84 D.U. 7.32 614 0.11 9 0.35 30 0.35 30 0.21 17
220 Condos/Townhomes 20 D.U. 7.32 146 0.11 2 0.35 7 0.35 7 0.21 4
Total 760 11 37 37 21
AM/PM
SITE GENERATED TRAFFIC Figure 3
DELICH
ASSOCIATES
Mercy Housing TIS, April 2021Steeley DriveSuniga Road
5/15
12/7
1/4
3/222/1212/71/4
5/18
5/15
Right-in/Right-out
AM/PM
SHORT RANGE (2022) TOTAL
PEAK HOUR TRAFFIC Figure 4
DELICH
ASSOCIATES
Mercy Housing TIS, April 2021Steeley DriveSuniga Road
169/202
139/221
1/4
3/222/120/012/742/320/025/2119/45
103/197
5/18
8/29
156/158
5/15
Right-in/Right-out
LONG RANGE (2035) TOTAL
PEAK HOUR TRAFFIC Figure 5
DELICH
ASSOCIATES
Mercy Housing TIS, April 2021Steeley DriveSuniga Road
555/560
420/625
5/5
5/525/150/015/1045/350/025/2025/45
385/600
5/20
10/30
540/515
5/15
Right-in/Right-outAM/PM
Rounded to Nearest
5 Vehicles
DELICH Mercy Housing TIS, April 2021 ASSOCIATES
TABLE 3
Short Range (2022) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Suniga/Steeley
(stop sign)
EB LT A A
WB LT A A
NB LT/T/RT B B
SB LT/T/RT B B
OVERALL A A
Suniga/R-in R-out Site Access
(stop sign)
SB LT A A
OVERALL A A
TABLE 4
Long Range (2035) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Suniga/Steeley
(stop sign)
EB LT A A
WB LT A A
NB LT/T/RT C C
SB LT/T/RT C C
OVERALL A A
Suniga/R-in R-out Site Access
(stop sign)
SB LT A A
OVERALL A A
Figure 6
DELICH
ASSOCIATES
Mercy Housing TIS, April 2021Steeley DriveSuniga Road
Right-in/Right-outSTOPSTOP STOP
- Denotes Lane
SHORT RANGE (2022) AND
LONG RANGE (2035) GEOMETRY
APPENDIX A
1
HCM 6th TWSC
1: Steeley Drive & Suniga Road short total am
am 9:43 am 12/27/2019 Baseline Synchro 11 Light Report
JMD
Intersection
Int Delay, s/veh 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 19 103 5 5 156 8 22 0 12 25 0 42
Future Vol, veh/h 19 103 5 5 156 8 22 0 12 25 0 42
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 400 - - 400 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 22 121 6 6 184 9 26 0 14 29 0 49
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 193 0 0 127 0 0 272 373 64 306 372 97
Stage 1 ------168168-201201-
Stage 2 ------104205-105171-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1378 - - 1457 - - 659 556 987 623 557 940
Stage 1 ------817758-782734-
Stage 2 ------890731-889756-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1378 - - 1457 - - 615 545 987 605 546 940
Mov Cap-2 Maneuver ------615545-605546-
Stage 1 ------804746-769731-
Stage 2 ------840728-862744-
Approach EB WB NB SB
HCM Control Delay, s 1.1 0.2 10.4 10.1
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)709 1378 - - 1457 - - 779
HCM Lane V/C Ratio 0.056 0.016 - - 0.004 - - 0.101
HCM Control Delay (s) 10.4 7.7 - - 7.5 - - 10.1
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0.3
2
HCM 6th TWSC
1: Steeley Drive & Suniga Road short total pm
pm 2:10 pm 12/27/2019 Baseline Synchro 11 Light Report
JMD
Intersection
Int Delay, s/veh 2.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 45 197 18 15 158 29 12 0 7 21 0 32
Future Vol, veh/h 45 197 18 15 158 29 12 0 7 21 0 32
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 400 - - 400 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 53 232 21 18 186 34 14 0 8 25 0 38
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 220 0 0 253 0 0 478 605 127 461 598 110
Stage 1 ------349349-239239-
Stage 2 ------129256-222359-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1346 - - 1309 - - 470 410 900 484 414 922
Stage 1 ------640632-743706-
Stage 2 ------861694-760626-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1346 - - 1309 - - 433 389 900 460 392 922
Mov Cap-2 Maneuver ------433389-460392-
Stage 1 ------615607-714696-
Stage 2 ------814684-723602-
Approach EB WB NB SB
HCM Control Delay, s 1.3 0.6 12 11
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)535 1346 - - 1309 - - 660
HCM Lane V/C Ratio 0.042 0.039 - - 0.013 - - 0.094
HCM Control Delay (s) 12 7.8 - - 7.8 - - 11
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.1 0.1 - - 0 - - 0.3
3
HCM 6th TWSC
2: R-in/R-out & Suniga Road short total am
am 9:43 am 12/27/2019 Baseline Synchro 11 Light Report
JMD
Intersection
Int Delay, s/veh 0.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 139 1 0 169 0 3
Future Vol, veh/h 139 1 0 169 0 3
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length -----0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 164 1 0 199 0 4
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 83
Stage 1 ------
Stage 2 ------
Critical Hdwy -----6.94
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy -----3.32
Pot Cap-1 Maneuver - - 0 - 0 960
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -----960
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB WB NB
HCM Control Delay, s 0 0 8.8
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h)960 - - -
HCM Lane V/C Ratio 0.004 - - -
HCM Control Delay (s) 8.8 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) 0 - - -
4
HCM 6th TWSC
2: R-in/R-out & Suniga Road short total pm
pm 2:10 pm 12/27/2019 Baseline Synchro 11 Light Report
JMD
Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 221 4 0 202 0 2
Future Vol, veh/h 221 4 0 202 0 2
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length -----0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 260 5 0 238 0 2
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 133
Stage 1 ------
Stage 2 ------
Critical Hdwy -----6.94
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy -----3.32
Pot Cap-1 Maneuver - - 0 - 0 892
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -----892
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB WB NB
HCM Control Delay, s 0 0 9
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h)892 - - -
HCM Lane V/C Ratio 0.003 - - -
HCM Control Delay (s) 9 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) 0 - - -
5
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
6
APPENDIX B
7
HCM 6th TWSC
1: Steeley Drive & Suniga Road long total am
am 9:43 am 12/27/2019 Baseline Synchro 11 Light Report
JMD
Intersection
Int Delay, s/veh 1.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 25 385 5 5 540 10 25 0 15 25 0 45
Future Vol, veh/h 25 385 5 5 540 10 25 0 15 25 0 45
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 400 - - 400 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 26 405 5 5 568 11 26 0 16 26 0 47
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 579 0 0 410 0 0 754 1049 205 839 1046 290
Stage 1 ------460460-584584-
Stage 2 ------294589-255462-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 991 - - 1145 - - 298 226 802 259 227 707
Stage 1 ------551564-465496-
Stage 2 ------690494-727563-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 991 - - 1145 - - 271 219 802 248 220 707
Mov Cap-2 Maneuver ------271219-248220-
Stage 1 ------537549-453494-
Stage 2 ------641492-694548-
Approach EB WB NB SB
HCM Control Delay, s 0.5 0.1 16.3 15.2
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)361 991 - - 1145 - - 426
HCM Lane V/C Ratio 0.117 0.027 - - 0.005 - - 0.173
HCM Control Delay (s) 16.3 8.7 - - 8.2 - - 15.2
HCM Lane LOS C A - - A - - C
HCM 95th %tile Q(veh) 0.4 0.1 - - 0 - - 0.6
8
HCM 6th TWSC
1: Steeley Drive & Suniga Road long total pm
pm 2:10 pm 12/27/2019 Baseline Synchro 11 Light Report
JMD
Intersection
Int Delay, s/veh 1.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 45 595 15 10 515 30 10 0 10 20 0 35
Future Vol, veh/h 45 595 15 10 515 30 10 0 10 20 0 35
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 400 - - 400 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 47 626 16 11 542 32 11 0 11 21 0 37
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 574 0 0 642 0 0 1021 1324 321 987 1316 287
Stage 1 ------728728-580580-
Stage 2 ------293596-407736-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 995 - - 939 - - 191 155 675 202 156 710
Stage 1 ------381427-467498-
Stage 2 ------691490-592423-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 995 - - 939 - - 173 146 675 190 147 710
Mov Cap-2 Maneuver ------173146-190147-
Stage 1 ------363407-445492-
Stage 2 ------647484-555403-
Approach EB WB NB SB
HCM Control Delay, s 0.6 0.2 19.2 17.1
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)275 995 - - 939 - - 356
HCM Lane V/C Ratio 0.077 0.048 - - 0.011 - - 0.163
HCM Control Delay (s) 19.2 8.8 - - 8.9 - - 17.1
HCM Lane LOS C A - - A - - C
HCM 95th %tile Q(veh) 0.2 0.1 - - 0 - - 0.6
9
HCM 6th TWSC
2: R-in/R-out & Suniga Road long total am
am 9:43 am 12/27/2019 Baseline Synchro 11 Light Report
JMD
Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 420 5 0 555 0 5
Future Vol, veh/h 420 5 0 555 0 5
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length -----0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 442 5 0 584 0 5
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 224
Stage 1 ------
Stage 2 ------
Critical Hdwy -----6.94
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy -----3.32
Pot Cap-1 Maneuver - - 0 - 0 779
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -----779
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB WB NB
HCM Control Delay, s 0 0 9.7
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h)779 - - -
HCM Lane V/C Ratio 0.007 - - -
HCM Control Delay (s) 9.7 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) 0 - - -
10
HCM 6th TWSC
2: R-in/R-out & Suniga Road long total pm
pm 2:10 pm 12/27/2019 Baseline Synchro 11 Light Report
JMD
Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 221 4 0 202 0 2
Future Vol, veh/h 221 4 0 202 0 2
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length -----0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 233 4 0 213 0 2
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 119
Stage 1 ------
Stage 2 ------
Critical Hdwy -----6.94
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy -----3.32
Pot Cap-1 Maneuver - - 0 - 0 910
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -----910
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB WB NB
HCM Control Delay, s 0 0 9
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h)910 - - -
HCM Lane V/C Ratio 0.002 - - -
HCM Control Delay (s) 9 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) 0 - - -
11