HomeMy WebLinkAboutH-25 MULTI-FAMILY - FDP210008 - DOCUMENT MARKUPS - ROUND 3 - UTILITY PLANS (2)HARMONY ROAD
STRAUSS CABIN ROAD0 50
SCALE: 1" = 50'
1002550
FINAL DEVELOPMENT PLANNORTH
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADEXISTING CONDITIONS AND DEMO PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC2.0 CJS19059.02_EX_SITE_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_EX_SITE_PROD.dwg, C2.0 EXISTING CONDITIONS AND DEMO PLAN, 5/26/2021 9:30:48 AM, VGentry, 1:16/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed
BLDG
3
BLDG
6
CAR CARE
CENTER
CAR CARE
BIKE RACKS
2
FINAL DEVELOPMENT PLANNORTH
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSITE AND HORIZONTAL CONTROL PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC3.2 CJS19059.02_HC_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 20
SCALE: 1" = 20'
401020
NORTH
0 100
SCALE: 1" = 100'
20050100
PLAN NOTES
1 NEW ASPHALT PAVING
NEW CONCRETE WALK
NEW ACCESSIBILITY RAMP
NEW 4" PAINTED WHITE STRIPE AT 3' O.C. (TYP.)
NEW PAINTED INTERNATIONAL DISABLED SYMBOL (TYP.)
NEW 4" PAINTED WHITE PARKING STRIPE (TYP.)
NEW CONCRETE DRIVE APPROACH PER LCUASS STANDARDS
12" WHITE STOP BAR
STOP SIGN (R1-1)
NEW TRASH PAD AND ENCLOSURE (SEE ARCH. FOR DETAILS)
2
3
4
5
6
7
8
9
10
NEW BIKE RACKS11
POOL AND AMENITY AREA12
TRANSFORMER PAD
PARK SPACE/PLAYGROUND
PEDESTRIAN TRAIL CONCRETE
DEAD-END BARRICADE
13
14
15
16
SECONDARY EMERGENCY ACCESS WITH FENCING AND ROLL-OVER CURB17
LANDSCAPE WALL FOR TREE PROTECTION18
NEW CURB AND GUTTER (TYP.)19
DOG PARK WITH BREAKAWAY FENCING20
LANDSCAPE BERMS (TYP.)21
DOGHOUSES WITH FIRE RISER (TYP.)22
LIGHT POLES23
PICNIC TABLES AND CORNHOLE24
PEDESTRIAN HANDICAP RAMPS AND CROSSWALK (TYP.)25
SIDEWALK CHASE AND FLUME (TO MATCH EXISTING WIDTH)26
STANDARD 90 DEGREE PARKING SPACE WITH 2' OVERHANG (TYP.)27
SIDEWALK ANGLED PARKING SPACE WITH 2' OVERHANG (TYP.)28
STANDARD COMPACT PARKING SPACES (TYP.)29
PARALLEL PARKING SPACES (TYP.)30
CRITICAL ROOT ZONE OF TREES TO REMAIN AND BE PROTECTED31
2 FT CONCRETE PAN32
18 IN OUTFLOW CURB AND GUTTER33
18 IN INFLOW CURB AND GUTTER34
TRANSITION FOR CURB AND GUTTER TYPES35
P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_HC_PROD.dwg, C3.2 SITE AND HORIZONTAL CONTROL PLAN, 5/26/2021 9:32:00 AM, VGentry, 1:1Line Over Text
Line Over Text
6/22/2021
All circled line over text on
this sheet have been
addressed
BLDG
1
CAR CARE
BIKE RACKS
1
FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.1 CJS19059.02_GRAD_PROD-2.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10
SCALE: 1" = 10'
20510
NORTH
0 100
SCALE: 1" = 100'
20050100
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.
“”
“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-2.dwg, C4.1 GRADING PLAN, 5/26/2021 9:37:06 AM, VGentry, 1:1Text Over Text
Line Over Text
6/22/2021
All circled line over text on
this sheet have been
addressed
BLDG
2
CAR CARE
BIKE RACKS
2
FINAL DEVELOPMENT PLANNORTH
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.2 CJS19059.02_GRAD_PROD-2.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10
SCALE: 1" = 10'
20510
NORTH
0 100
SCALE: 1" = 100'
20050100
“”
“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-2.dwg, C4.2 GRADING PLAN, 5/26/2021 9:37:32 AM, VGentry, 1:16/22/2021
Line Over Text &
Text Over Text
All circled line over text on
this sheet have been
addressed
BLDG
3
CAR CARE
BIKE RACKS
3
FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.3 CJS19059.02_GRAD_PROD-2.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10
SCALE: 1" = 10'
20510
NORTH
0 100
SCALE: 1" = 100'
20050100
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.MATCHLINE-SEE SHEET C4.17“”
“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-2.dwg, C4.3 GRADING PLAN, 5/26/2021 9:38:15 AM, VGentry, 1:16/22/2021
Text Over Text
Text Over Text
All circled line over text on
this sheet have been
addressed
BLDG
4
CAR CARE
BIKE RACKS
4
FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.4 CJS19059.02_GRAD_PROD-2.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10
SCALE: 1" = 10'
20510
NORTH
0 100
SCALE: 1" = 100'
20050100
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY ENGINEER DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
“”
“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-2.dwg, C4.4 GRADING PLAN, 5/26/2021 9:39:01 AM, VGentry, 1:16/22/2021
Line Over Text
All circled line over text on
this sheet have been
addressed
BLDG
6
CAR CARE
CENTER
CAR CARE
BIKE RACKS
6
FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.6 CJS19059.02_GRAD_PROD-3.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10
SCALE: 1" = 10'
20510
NORTH
0 100
SCALE: 1" = 100'
20050100
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.
“”
“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-3.dwg, C4.6 GRADING PLAN, 5/26/2021 10:30:47 AM, VGentry, 1:16/22/2021
Text Over Text
Text Over Text
**All circled are line over text,
except as noted.**
All circled line over text on
this sheet have been
addressed
CAR CARE
BIKE RACKS
7
FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.7 CJS19059.02_GRAD_PROD-3.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10
SCALE: 1" = 10'
20510
NORTH
0 100
SCALE: 1" = 100'
20050100
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.
“”
“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-3.dwg, C4.7 GRADING PLAN, 5/26/2021 10:31:04 AM, VGentry, 1:16/22/2021
Line Over Text
All circled line over text on
this sheet have been
addressed
CAR CARE
BIKE RACKS
8
FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.8 CJS19059.02_GRAD_PROD-3.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10
SCALE: 1" = 10'
20510
NORTH
0 100
SCALE: 1" = 100'
20050100
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.
“”
“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-3.dwg, C4.8 GRADING PLAN, 5/26/2021 10:31:18 AM, VGentry, 1:16/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed
BLDG
9
CAR CARE
BIKE RACKS
9
FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.9 CJS19059.02_GRAD_PROD-3.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10
SCALE: 1" = 10'
20510
NORTH
0 100
SCALE: 1" = 100'
20050100
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.
“”
“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-3.dwg, C4.9 GRADING PLAN, 5/26/2021 10:51:00 AM, VGentry, 1:16/22/2021
Text Over Text
**All circled are line over text,
except as noted.**
All circled line over text on
this sheet have been
addressed
BLDG
7
BLDG
8
CAR CARE
BIKE RACKS
10
FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.10 CJS19059.02_GRAD_PROD-3.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10
SCALE: 1" = 10'
20510
NORTH
0 100
SCALE: 1" = 100'
20050100
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.
“”
“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-3.dwg, C4.10 GRADING PLAN, 5/26/2021 10:51:52 AM, VGentry, 1:16/22/2021
Text Over Text
**All circled are line over text,
except as noted.**
All circled line over text on
this sheet have been
addressed
BLDG
7
CAR CARE
BIKE RACKS
11
16 16 17
17
FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.11 CJS19059.02_GRAD_PROD-4.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10
SCALE: 1" = 10'
20510
NORTH
0 100
SCALE: 1" = 100'
20050100
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.
“”
“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-4.dwg, C4.11 GRADING PLAN, 5/26/2021 10:40:04 AM, VGentry, 1:16/22/2021
Text Over Text
**All circled are line over text,
except as noted.**
All circled line over text on
this sheet have been
addressed
BLDG
11
CAR CARE
BIKE RACKS
13
16 16 17
17
FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.13 CJS19059.02_GRAD_PROD-4.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10
SCALE: 1" = 10'
20510
NORTH
0 100
SCALE: 1" = 100'
20050100
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.
“”
“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-4.dwg, C4.13 GRADING PLAN, 5/26/2021 10:41:30 AM, VGentry, 1:16/22/2021
Text Over Text
**All circled are line over text,
except as noted.**
All circled line over text on
this sheet have been
addressed
CAR CARE
BIKE RACKS
15
16 16 17
17
FINAL DEVELOPMENT PLANNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADGRADING PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC4.15 CJS19059.02_GRAD_PROD-4.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 10
SCALE: 1" = 10'
20510
NORTH
0 100
SCALE: 1" = 100'
20050100
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.
“”
“”P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_GRAD_PROD-4.dwg, C4.15 GRADING PLAN, 5/26/2021 10:43:02 AM, VGentry, 1:16/22/2021
Text Over Text
Line Over Text
All circled line over text on
this sheet have been
addressed
BLDG
1
BLDG
2 BLDG
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
4
BLDG
11
BLDG
5
BLDG
8
CAR CARE
CENTER
EX FIBER OPTIC VAULT
EX 24" RCP
INV=4845.5EX ELECTRICAL CABINET
FIBER OPTIC VAULT
0 50
SCALE:
1:50_XREF
1002550
FINAL DEVELOPMENT PLANNORTH
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADOVERALL UTILITY PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.0 CJS19059.02_UTIL_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02UTILITY NOTES:
1.ALL WATER MUST BE CONSTRUCTED PER CURRENT FORT COLLINS-LOVELAND WATER DISTRICT (FCLWD)
SPECIFICATIONS.
2.ALL SEWER MUST BE CONSTRUCTED PER CURRENT SOUTH FORT COLLINS SANITATION DISTRICT
SPECIFICATIONS.
3.BUILDINGS 1-12 REQUIRE 1 1/2 INCH METER. PIPE ON BUILDING SIDE OF METER WILL BE UP-SIZED TO
2-INCH DIAMETER 5 FEET BUILDING SIDE OF THE METER VAULT.
4.SANITARY SEWER SERVICES TO BUILDINGS ARE 6-INCH DIAMETER AT 1% MINIMUM WITH A CLEAN-OUT
LOCATED 5-FEET OUTSIDE THE BUILDING FOOTPRINT.
5.SEE PLUMBING PLANS FOR EXACT LOCATIONS OF WHERE SERVICES LEAVE THE BUILDING FOOTPRINTS.
EASEMENT NOTE:
1.EASEMENTS ARE LABELED AS ACCESS (A), UTILITY (U), DRAINAGE EASEMENT (DE) AND EMERGENCY
ACCESS EASEMENT (EAE) AS REFLECTED ON THE PLAT.P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_UTIL_PROD.dwg, C5.0 OVERALL UTILITY PLAN, 5/26/2021 9:54:25 AM, VGentry, 1:16/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
11
BLDG
8
C.O.
C.O.
C.O.
C.O.
C.O.
UTILITY EASEMENT (TYP)
UTILITY EASEMENT (TYP)
UTILITY EASEMENT (TYP)
F.D.C.
F.D.C.
F.D.C.
F.D.C.
BLDG
1
2 BLDG
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
4
BLDG
11
BLDG
5
BLDG
8
CAR CARE
BIKE RACKS
FINAL DEVELOPMENT PLANNORTH
FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSANITARY SEWER PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.1 CJS19059.02_SAN_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.0230 15 0 30 60
SANITARY LINE A PLAN VIEW
SANITARY LINE A PROFILE VIEW
HORIZONTAL SCALE:1" = 30'
VERTICAL SCALE: 1"=5'
UTILITY NOTES:
1.ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE ALL SEWER MUST BE
CONSTRUCTED PER SFCSD CURRENT CONSTRUCTION SPECIFICATIONS.
2.ALL PIPE MEASUREMENTS ARE FROM CENTER OF STRUCTURE TO CENTER OF
STRUCTURE
P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_SAN_STREET_A.dwg, C5.1 SANITARY SEWER PLAN AND PROFILE, 5/26/2021 10:57:51 AM, Rstraus, 1:16/22/2021
Cut Off Text
Line Over Text
All circled line over text on
this sheet have been
addressed
BLDG
2 BLDG
3
CAR CARE
CENTER
BLDG
1
2 BLDG
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
4
BLDG
11
BLDG
5
BLDG
8
CAR CARE
BIKE RACKS
30 15 0 30 60
FINAL DEVELOPMENT PLANNORTH
FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSANITARY SEWER PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.4 CJS19059.02_SAN_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02SANITARY LINE D PLAN VIEW
SANITARY LINE D PROFILE VIEW
HORIZONTAL SCALE:1" = 30'
VERTICAL SCALE: 1"=5'
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY ENGINEER DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
UTILITY NOTES:
1.ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE ALL SEWER MUST BE
CONSTRUCTED PER SFCSD CURRENT CONSTRUCTION SPECIFICATIONS.
2.ALL PIPE MEASUREMENTS ARE FROM CENTER OF STRUCTURE TO CENTER OF
STRUCTURE
P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_SAN_STREET_A.dwg, C5.4 SANITARY SEWER PLAN AND PROFILE, 5/26/2021 10:58:30 AM, Rstraus, 1:16/22/2021
Text Over Text
BLDG
1
BLDG
2 BLDG
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
4
BLDG
11
BLDG
5
BLDG
8
CAR CARE
BIKE RACKS
BLDG
12
BLDG
10
BLDG
11
30 15 0
HORIZONTAL SCALE:1" = 30'
30 60
VERTICAL SCALE: 1"=5'
STORM DRAIN A PLAN VIEW
STORM DRAIN A PROFILE VIEW FINAL DEVELOPMENT PLANNORTH
FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.5 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.5 STORM DRAIN A, 5/26/2021 9:59:55 AM, VGentry, 1:16/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed
BLDG
1
BLDG
2 BLDG
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
4
BLDG
11
BLDG
5
BLDG
8
CAR CARE
BIKE RACKS
BLDG430 15 0
HORIZONTAL SCALE:1" = 30'
30 60
VERTICAL SCALE: 1"=5'
STORM DRAIN B PLAN VIEW
STORM DRAIN B PROFILE VIEW FINAL DEVELOPMENT PLANNORTH
FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.6 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.6 STORM DRAIN, 5/26/2021 10:00:10 AM, VGentry, 1:16/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed
BLDG11BLDG5BLDG
1
BLDG
2 BLDG
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
4
BLDG
11
BLDG
5
BLDG
8
CAR CARE
BIKE RACKS
FINAL DEVELOPMENT PLANNORTH
FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.7 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.0230 15 0 30 60
STORM DRAIN C PLAN VIEW
HORIZONTAL SCALE:1" = 30'
VERTICAL SCALE: 1"=5'
STORM DRAIN C PROFILE VIEW
HORIZONTAL SCALE:1" = 30'
VERTICAL SCALE: 1"=5'
STORM DRAIN C PROFILE VIEW
STORM DRAIN C PLAN VIEW
P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, 5.7 STORM DRAIN C, 5/26/2021 10:00:27 AM, VGentry, 1:16/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed
BLDG
1
BLDG
2 BLDG
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
4
BLDG
11
BLDG
5
BLDG
8
CAR CARE
BIKE RACKS
BLDG7CAR CARE
CENTER
30 15 0
HORIZONTAL SCALE:1" = 30'
30 60
VERTICAL SCALE: 1"=5'
STORM DRAIN G PLAN VIEW
STORM DRAIN E PROFILE VIEW FINAL DEVELOPMENT PLANNORTH
FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.8 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02HORIZONTAL SCALE:1" = 30'
VERTICAL SCALE: 1"=5'
STORM DRAIN G PROFILE VIEW
STORM DRAIN E PLAN VIEW
NORTH
P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.8 STORM DRAIN E & G, 5/26/2021 10:00:46 AM, VGentry, 1:16/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed
BLDG
1
BLDG
2 BLDG
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
4
BLDG
11
BLDG
5
BLDG
8
CAR CARE
BIKE RACKS
BLDG
5
30 15 0
HORIZONTAL SCALE:1" = 30'
30 60
VERTICAL SCALE: 1"=5'
STORM DRAIN F PLAN VIEW
STORM DRAIN F PROFILE VIEW FINAL DEVELOPMENT PLANNORTH
FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.9 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.9 STORM DRAIN F, 5/26/2021 10:01:05 AM, VGentry, 1:16/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed
BLDG
1
BLDG
2 BLDG
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
4
BLDG
11
BLDG
5
BLDG
8
CAR CARE
BIKE RACKS
30 15 0
HORIZONTAL SCALE:1" = 30'
30 60
VERTICAL SCALE: 1"=5'
STORM DRAIN H PLAN VIEW
STORM DRAIN H PROFILE VIEW FINAL DEVELOPMENT PLANNORTH
FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.10 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.10 STORM DRAIN H, 5/26/2021 10:01:18 AM, VGentry, 1:16/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed
BLDG
1
BLDG
2 BLDG
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
4
BLDG
11
BLDG
5
BLDG
8
CAR CARE
BIKE RACKS
BLDG
30 15 0
HORIZONTAL SCALE:1" = 30'
30 60
VERTICAL SCALE: 1"=5'
STORM DRAIN I PLAN VIEW
STORM DRAIN I PROFILE VIEW FINAL DEVELOPMENT PLANNORTH
FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.11 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.11 STORM DRAIN I, 5/26/2021 10:50:09 AM, Rstraus, 1:16/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
11
BLDG
5
BLDG
8
CAR CARE
BIKE RACKS
30 15 0
HORIZONTAL SCALE:1" = 30'
30 60
VERTICAL SCALE: 1"=5'
STORM DRAIN OUTFALL PLAN VIEW
STORM DRAIN OUTFALL PROFILE VIEW FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.12 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02FINAL DEVELOPMENT PLANNORTH
P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.12 STORM DRAIN OUTFALL, 5/26/2021 10:01:45 AM, VGentry, 1:16/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
11
BLDG
5
BLDG
8
CAR CARE
BIKE RACKS
BLDG730 15 0
HORIZONTAL SCALE:1" = 30'
30 60
VERTICAL SCALE: 1"=5'
STORM DRAIN POOL PLAN VIEW
STORM DRAIN POOL PROFILE VIEW FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADSTORM DRAIN PLAN AND PROFILEH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.13 CJS19059.02_STORM_STREET_A.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.02FINAL DEVELOPMENT PLANNORTH
P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_STORM_STREET_A.dwg, C5.13 STORM DRAIN POOL, 5/26/2021 10:01:55 AM, VGentry, 1:16/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed
BLDG
1
BLDG
2 BLDG
3
BLDG
6
BLDG
12
BLDG
10
BLDG
7
BLDG
9
BLDG
4
BLDG
11
BLDG
5
BLDG
8
CAR CARE
CENTER
EX FIBER OPTIC VAULT
EX 24" RCP
INV=4845.5
EX ELECTRICAL CABINET
FIBER OPTIC VAULT
CAR CARE
BIKE RACKS
FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONE. HARMONY ROAD & STRAUSS CABIN ROADWATERLINE PLANH-25 MULTI FAMILYHARMONY I-25 SUBDIVISIONFORT COLLINS, COC5.15 CJS19059.02_WATER_PROD.DWGRS/EB/VJG2/19/201ST PDP SUBMITTAL7/01/209/30/2010/26/204/07/215/26/21-2ND PDP SUBMITTAL3RD PDP SUBMITTAL4TH PDP SUBMITTAL1ST FDP SUBMITTAL2ND FDP SUBMITTAL---19059.020 40
SCALE: 1" =
40'_XREF
802040 FINAL DEVELOPMENT PLANNORTH
NOTE:
-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE
ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE
STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.
-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN
THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS
ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.
NORTH
0 100
SCALE: 1" =
100'_XREF
20050100
UTILITY NOTES:
1.ALL DRIVE AISLES CONTAIN A UTILITY EASEMENT, SEE PLAT FOR DETAILS.
2.ALL WATER MUST BE CONSTRUCTED PER CURRENT FORT COLLINS-LOVELAND WATER
DISTRICT (FCLWD) SPECIFICATIONS.
3.ALL SEWER MUST BE CONSTRUCTED PER CURRENT SOUTH FORT COLLINS SANITATION
DISTRICT SPECIFICATIONS.
4.BUILDINGS 1-12 REQUIRE 1 1/2 INCH METER. PIPE ON BUILDING SIDE OF METER WILL BE
UP-SIZED TO 2-INCH DIAMETER 5 FEET BUILDING SIDE OF THE METER VAULT.
5.SANITARY SEWER SERVICES TO BUILDINGS ARE 6-INCH DIAMETER AT 1% MINIMUM WITH A
CLEAN-OUT LOCATED 5-FEET OUTSIDE THE BUILDING FOOTPRINT.
6.SEE PLUMBING PLANS FOR EXACT LOCATIONS OF WHERE SERVICES LEAVE THE BUILDING
FOOTPRINTS.P:\19059_02_H25_Multi_Family_Dev_Ph_I\CADD_C3D\PRODUCTION_DWG\19059.02_WATER_PROD.dwg, C5.12 WATERLINE PLAN, 5/26/2021 10:04:00 AM, VGentry, 1:16/22/2021
Text Over Text
Text Over Text
All circled line over text on
this sheet have been
addressed
6/22/2021
**All circled are line over text.**
All circled line over text on
this sheet have been
addressed