April 02, 2021
Mike Mcbride
MMLA Landscape + Planning
2339 Spruce Creek Dr
Fort Collins, CO 80528
RE: Fort Collins-Loveland Water District Expansion, ODP210001, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Fort Collins-Loveland Water District Expansion. If you have
questions about any comments, you may contact the individual commenter or direct your
questions through your Development Review Coordinator, Tenae Beane via phone at
970-224-6119 or via email at tbeane@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Clark Mapes, 970-221-6225, cmapes@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/30/2021
03/30/2021: The southern part of the plan raises significant questions needing
more attention regarding Fossil Ridge Drive and the existing stormwater facility.
Response: We have been coordinating with PFA and Engineering to satisfy these requirements
Comment Number: 2 Comment Originated: 03/30/2021
03/30/2021: Otherwise, staff will support the ODP and APU with no other
comments, based on the history of the property and lack of new impacts that
would prevent findings under Section 1.3.4.
Department: PFA
Contact: Marcus Glasgow, 970-416-2338, mglasgow@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/30/2021
03/30/2021: There is some concern with dead-end access roads on this site.
2
Snead Dr. exceeds 660 feet and would require a second point of access. The
neighboring site (Fossil Ridge Dr) is a dead end access road that exceeds 150
feet with no turnaround. If Fossil Ridge Dr connected to Snead Dr, this would
correct both issues.
Response: A fire turnaround for the end of Fossil Ridge Drive has been provided. This turnaround is also
intended to satisfy the modification of standards to Section 3.6.2 of the Land Use Code.
Comment Number: 2 Comment Originated: 03/30/2021
03/30/2021: FIRE LANE/ ACCESS ROAD SPECIFICATIONS
A fire lane plan shall be submitted for approval prior to installation. In addition to
the design criteria already contained in relevant standards and policies, any
new fire lane must meet the following general requirements:
-Fire lanes established on private property shall be dedicated by plat or
separate document as an Emergency Access Easement.
-Maintain the required 20 foot minimum unobstructed width & 14 foot minimum
overhead clearance. Where road widths exceed 20 feet in width, the full width
shall be dedicated unless otherwise approved by the AHJ.
-Additional fire lane requirements are triggered for buildings greater than 30' in
height. Refer to Appendix D105 of the International Fire Code.
-Be designed as a flat, hard, all-weather driving surface capable of supporting
40 tons.
-Dead-end fire access roads in excess of 150 feet in length shall be provided
with an approved turnaround area for fire apparatus.
-Dead-end roads shall not exceed 660 feet in length without providing for a
second point of access. Dead-end access roads in excess of 1320 feet in
length require a third point of access. Dead-end access roads in excess of
2640 feet in length require a fourth point of access.
-The required turning radii of a fire apparatus access road shall be a minimum
of 25 feet inside and 50 feet outside. Turning radii shall be detailed on
submitted plans.
-Dedicated fire lanes are required to connect to the Public Way unless
otherwise approved by the AHJ.
-Fire lane to be identified by red curb and/or signage, and maintained
unobstructed at all times.
-Fire lane sign locations or red curbing should be labeled and detailed on final
plans. Refer to LCUASS detail #1418 & #1419 for sign type, placement, and
spacing. Appropriate directional arrows required on all signs.
- In remote rural applications, fire lane standards may be modified with the
approval of the fire marshal; examples might include reduction in road width or
road surface.
International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix
D; FCLUC 3.6.2(B)2006 and Local Amendments.
Response: Fire turnaround has been provided.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/30/2021
03/30/2021: The status of Fossil Ridge Drive to the south being stubbed to the
3
boundary of this site would require that it either extend and tie into the ODP
boundary, or be formally terminated into a cul-de-sac bulb as provided in 3.6.2
of the Land Use Code. The applicant would need to address this aspect of the
code with the ODP, either through the indication of formally terminating the
street as a cul-de-sac bulb/temporary turnaround, providing connectivity in some
manner through the property, or by the submitting of a modification request to 3.6.2(D).
Response: A modification of standards is being pursued to satisfy this requirement.
Department: Traffic Operation
Contact: Steve Gilchrist, 970-224-6175, sgilchrist@fcgov.com
Topic: Traffic Impact Study
Comment Number: 1 Comment Originated: 03/29/2021
03/29/2021: Based on the letter/narrative provided by the applicant, the
anticipated increase in trips/traffic that will be generated with the expansion of
this site and addition of approximately 10 employees is not expected exceed
the threshold required for a Traffic Impact Study. Before waiving the TIS we
would however like some further information regarding the anticipated traffic
generated by the proposed water filling station, (i.e. number of registered clients
per day.) Please update the narrative to provide this information.
Response: Traffic narrative has been updated to reflect trips generated by the water filling station.
Department: Environmental Planning
Contact: Scott Benton, (970)416-4290, sbenton@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/30/2021
03/30/2021: FOR HEARING: The ‘drainage ditch’ in the northeast corner of the
site (where trees T-11 to T-16 are located) will merit a Natural Habitat Buffer
Zone. The ditch is a former irrigation ditch that serves as a wildlife corridor
(3.4.1(A)(2)(n)). American plums, an important food and forage shrub species
that has been declining in Fort Collins, are present in the bottom of the ditch.
The plums qualify as ‘significant remnants of native plant communities’ (3.4.1(A)
(2)(a)).
The Buffer Zone Table in 3.4.1 stipulates buffering requirement of 50’ for each
feature. In this case the plums are contained in the ditch so the 50’ buffer would
be applied to the ditch top of bank. Fortunately, the proposed site plan doesn’t
directly disturb the ditch or the plums, but the access does intrude into the 50’
buffer on the south side of the ditch. The area of the NHBZ can be altered in
shape and does not have to be contiguous, etc. (3.4.1(E)(1)), therefore the
NHBZ can extend beyond 50’ to the north, west, or wherever is needed to make
up for the intrusion on the south side. Additionally, weed management be
required in the NHBZ; the weed management plan will be needed at the time of
PDP submittal. Also, the Planning Objectives document states, ‘There are no
wetlands or significant natural habitats within the boundaries of the site.’ Please
update accordingly.
Response: The Natural Habitat Buffer Zone has been indicated on the Overall Development Plan and
Planning Objectives have been updated.
4
Comment Number: 2 Comment Originated: 03/30/2021
03/30/2021: FOR HEARING: Please add a table to the site plan that includes
the following:
- amount of buffer area that would be required by a 50' buffer from the ditch
top of bank
- amount of buffer area provided on these plans
- minimum buffer distance
- maximum buffer distance
- average buffer distance
Response: Buffer table has been added
Comment Number: 3 Comment Originated: 03/30/2021
03/30/2021: FOR HEARING: According to Section 2.3.2(H)(3)(5) of the Land
Use Code, "the overall development plan shall show the general location and
approximate size of all natural areas, habitats and features within its boundaries
and shall indicate the applicant's proposed rough estimate of the natural area
buffer zones as required pursuant to Section 3.4.1(E)." The plans will need to
include approximate buffer zones for the ditch and plums.
Please include the following note on the ODP: "This Overall Development Plan
shows the general location and approximate size of all natural areas, habitats,
and features within its boundaries and the proposed rough estimate of the
natural area buffer zones as required by Land Use Code Section 3.4.1(E).
Detailed mapping of the site's natural areas, habitats, and features will be
provided at the time of individual PDP submittals. General buffer zones shown
on this ODP may be reduced or enlarged by the decision maker during the PDP process."
Response: This note has been added to the Overall Development Plan.
Comment Number: 4 Comment Originated: 03/30/2021
03/30/2021: FOR HEARING: Please add the following statement to the notes
on any sheets of the ODP, Master Utility Plan and Master Drainage Plan that
show the Natural Habitat Buffer Zone: "Please see Section 3.4.1 of the Land
Use Code for allowable uses within the natural habitat buffer zones."
Response: This note has been added to the plans.
Comment Number: 5 Comment Originated: 03/30/2021
03/30/2021: FOR HEARING: Please add an Environmental Planner signature
to all plans that show the NHBZ.
Response: Signature block has been added.
Comment Number: 6 Comment Originated: 03/30/2021
03/30/2021: FOR HEARING: Please revise note #9 under Tree Protection
Notes to read as follows:
If tree removal is necessary, please include the following note on the tree
mitigation plan and/or landscape plan, as appropriate:
“NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING
SEASON (FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A
PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A
NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE
PROJECT SITE. THE SURVEY SHALL BE SENT TO THE CITY
ENVIRONMENTAL PLANNER. IF ACTIVE NESTS ARE FOUND, THE CITY
WILL COORDINATE WITH RELEVANT STATE AND FEDERAL
5
REPRESENTATIVES TO DETERMINE WHETHER ADDITIONAL
RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY.”
Response: Note has been revised.
Comment Number: 7 Comment Originated: 03/30/2021
03/30/2021: INFORMATION ONLY: The Natural Habitat Buffer Zone will need
to be portrayed and labeled on the site, grading, utility, and landscape plan at
the time of PDP submittal.
Response: Noted
Comment Number: 8 Comment Originated: 03/30/2021
03/30/2021: INFORMATION ONLY: If the project progresses to the final
development plan stage, Development Agreement language regarding the
natural features on site will be provided.
Response: Noted
Department: Stormwater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
Topic: General
Comment Number: 8 Comment Originated: 03/30/2021
03/30/2021: FOR INFORMATION ONLY:
The ODP is conceptual in nature, at the time of PDP, the drainage design and
assumptions will need to be verified and shown to be in compliance with City
criteria. LID will need to be designed and shown on the plans for the PDP
submittal.
Response: Noted.
Comment Number: 9 Comment Originated: 03/30/2021
03/30/2021: FOR INFORMATION ONLY:
For the additional development to release stormwater flows at the existing
100-yr discharge rate, the PDP project will need to provide a 'beat the peak'
analysis. This will also need to include documentation that there is infrastructure
to convey these peak flows to Fossil Creek w/o negative impacts to any
adjacent properties and per City drainage criteria. It may be worth coordinating
with the adjacent Guardian Storage project, to confirm their proposed
infrastructure can accommodate the updated hydrograph from your proposed
site.
If this cannot be shown, then new impervious areas will need to be detained to
the historic 2-yr release rate. Discharges from existing impervious areas is
grandfathered.
Response: Noted.
Comment Number: 10 Comment Originated: 03/30/2021
03/30/2021: FOR APPROVAL:
It looks like the existing WQ pond will be reduced by the parking area
expansion. Will this detention pond area have enough volume? Please clarify.
Please remember the modified detention area will need to meet current
landscaping standards.
Response: Rough detention calculations have been provided.
Comment Number: 11 Comment Originated: 03/30/2021
03/30/2021: FOR APPROVAL:
6
Show City floodplain/ floodway on the ODP map.
Response: Floodplain has been shown on the Master Utility and Drainage Plan.
Comment Number: 12 Comment Originated: 03/30/2021
03/30/2021: FOR APPROVAL:
Provide previous drainage report documentation with ODP drainage memo.
Response: Previous drainage report has been provided.
Comment Number: 13 Comment Originated: 03/30/2021
03/30/2021: FOR INFORMATION:
For final approval, groundwater level documentation will need to be provided,
showing that the bottom of all detention and water quality facilities are 2-feet or
greater than the seasonal high groundwater level (July-Sept).
Response: Groundwater level documentation will be provided.
Department: Water-Wastewater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/30/2021
03/30/2021: FOR INFORMATION ONLY.
No Comment. Site is in the FCLWD/SFCSD.
Department: Erosion Control
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 03/25/2021
03/25/2021: No Comments from Erosion and Sediment Control on ODP. ESC
Plans (and report if over 1 acre) may be needed at FDP submittal.
Response: Noted
Department: Floodplain
Contact: Claudia Quezada, (970)416-2494, cquezada@fcgov.com
Topic: Floodplain
Comment Number: 2 Comment Originated: 03/29/2021
03/29/2021: INFORMATION ONLY:
A portion of this property is located in the City-regulated, 100-year Fossil Creek
floodway/floodplain and must comply with the safety regulations of Chapter 10
of City Municipal Code.
Response: Noted
Comment Number: 3 Comment Originated: 03/29/2021
03/29/2021: Based on the drawings submitted for review, it appears that all
improvements are outside of the regulatory floodway/floodplain. However, as
the project continues through the planning process, if any improvements are
proposed within the floodplain/floodway the applicant will be required to obtain
a floodplain use permit and comply with the safety regulations of Chapter 10 of
City Municipal Code.
Response: Noted
Comment Number: 4 Comment Originated: 03/29/2021
7
03/29/2021: Any construction activities in the regulatory floodway must also
include a no-rise certification prepared by a Professional Engineer licensed in
Colorado, per Section 10-45 of City Municipal Code.
Response: Noted
Comment Number: 5 Comment Originated: 03/29/2021
03/29/2021: Development review checklists and permit application forms for
floodplain requirements can be obtained at
https://www.fcgov.com/utilities/what-we-do/stormwater/flooding/forms-document
s. Please utilize checklist (see redlines) when preparing plans for resubmittal.
Response: Noted
Comment Number: 6 Comment Originated: 03/29/2021
03/29/2021: Please show the boundaries of the floodplain and floodway on
drawings per Floodplain Development Review checklist. Contact Beck
Anderson of Stormwater Master Planning at banderson@fcgov.com for
floodplain CAD line work.
Response: Floodplan boundary has been shown on the Master Utility and Drainage Plan
Comment Number: 7 Comment Originated: 03/29/2021
03/29/2021: INFORMATION ONLY:
The City of Fort Collins is expecting new regulatory mapping in the next year
due to the 2019 Fossil Creek Trail LOMR. Any future development will be
subject to the floodplain map and regulations effective at that time. Property
owners need to be aware that the floodplain may be remapped and may
change on their property.
Response: Noted
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/30/2021
03/30/2021: INFORMATION:
Light and Power currently serves the property with a 75kVA 3phase transformer
located along Snead Dr at the front of the existing building.
Response: Noted
Comment Number: 2 Comment Originated: 03/30/2021
03/30/2021: INFORMATION:
If an increase in electric capacity is needed as part of the project then electric
capacity fees, development fees, building site charges and any system
modification charges necessary to feed the site will apply to the project. Please
contact me to discuss development fees or visit the following website for an
estimate of charges and fees related to this project:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Response: Noted
Comment Number: 3 Comment Originated: 03/30/2021
03/30/2021: INFORMATION:
Any existing and/or proposed Light and Power electric facilities that are within
8
the limits of the project must be located within a utility easement.
Response: Noted
Comment Number: 4 Comment Originated: 03/30/2021
03/30/2021: INFORMATION:
For additional information on our renewal energy programs please visit the
website below or contact John Phelan (jphelan@fcgov.com).
https://www.fcgov.com/utilities/business/go renewable
Response: Noted
Comment Number: 5 Comment Originated: 03/30/2021
03/30/2021: INFORMATION:
The City of Fort Collins now offers gig-speed fiber internet, video and phone
service. Contact Julianna Potts with Fort Collins Connexion at 970-207-7890 or
jpotts@fcgov.com for commercial grade account support, RFPs and bulk agreements.
Response: Noted
Comment Number: 6 Comment Originated: 03/30/2021
03/30/2021: INFORMATION:
Please contact Tyler Siegmund with Light & Power Engineering if you have any
questions at 970.416.2772 Please reference our policies, construction
practices, development charge processes, electric service standards, and use
our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers
Response: Noted
Department: Forestry
Contact: Christine Holtz, choltz@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/30/2021
03/30/2021: INFORMATION ONLY FOR PDP
Trees provide many environmental and socioeconomic benefits including
reduced cooling expenses, providing natural wind breaks, improving air quality,
and increasing property values.
Existing significant trees shall be preserved to the extent reasonably feasible.
Will there be construction within the critical root zone of any of the existing trees
on your property? The critical root zone is defined as 12 inches in radius per
one inch in tree diameter measured at 4.5 ft above the ground. If so, please
consider how the construction will impact the health of the nearby trees and
consider alternate scenarios to preserve them.
Response: Noted
Department: Building Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 03/29/2021
03/29/2021: Construction shall comply with adopted codes as amended.
Current adopted codes are:
2018 International Building Code (IBC) with local amendments
2018 International Existing Building Code (IEBC) with local amendments
2018 International Energy Conservation Code (IECC) with local amendments
9
2018 International Mechanical Code (IMC) with local amendments
2018 International Fuel Gas Code (IFGC) with local amendments
2018 International Swimming Pool and Spa Code (ISPSC) with local
amendments
2018 International Plumbing Code (IPC) as amended by the State of Colorado
2020 National Electrical Code (NEC) as amended by the State of Colorado
Copies of current City of Fort Collins code amendments can be found at
fcgov.com/building.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures):
· 140mph (Ultimate) exposure B or
· Front Range Gust Map published by The Structural Engineer's Association of
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code: 2018 IECC commercial chapter.
INFORMATIONAL ITEMS:
· Commercial occupancies must provide 10ft setback from property line and 20
feet between other buildings or provide fire rated walls and openings per
chapter 6 and 7 of the IBC.
· City of Fort Collins amendments to the 2018 IBC require a full NFPA-13
sprinkler system per IBC chapter 9 or when building exceeds 5000 sq.ft. (or
meet fire containment requirements).
· Prescriptive energy compliance with increased insulation values is required for
buildings using electric heat.
· A City licensed commercial general contractor is required to construct any new
commercial structure.
Building Permit Pre-Submittal Meeting:
Please schedule a pre-submittal meeting with Building Services for this project.
Pre-Submittal meetings assist the designer/builder by assuring, early on in the
design, that the new projects are on track to complying with all of the adopted
City codes and Standards listed below. The proposed project should be in the
early to mid-design stage for this meeting to be effective. Applicants of new
projects should email rhovland@fcgov.com to schedule a pre-submittal
meeting. Applicants should be prepared to present site plans, floor plans, and
elevations and be able to discuss code issues of occupancy, square footage,
type of construction, and energy compliance method being proposed.
Response: Noted
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 03/29/2021
03/29/2021: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
10
Response: Line over text issues have been addressed.
Topic: General
Comment Number: 1 Comment Originated: 03/29/2021
03/29/2021: FOR FINAL APPROVAL:
There is a question to whether there was a previous ODP for this property. If
there is a previous ODP, that ODP will need to be amended.
Response: No previous ODP has been found.