HomeMy WebLinkAbout504 S WHITCOMB STREET, CARRIAGE HOUSE - FDP210006 - DOCUMENT MARKUPS - ROUND 2 - DRAINAGE REPORT
Highland Development Services, Inc.
6355 Fairgrounds Avenue, Suite 100 | Windsor, CO 80550 | 970.674.7550
Memorandum
TO: Robert Kirkpatrick
FROM: Jason Claeys, P.E.
DATE: 3/29/21
PROJECT: 504 S. Whitcomb St.
HDS JOB NO: 20-1039-00
SUBJECT: Drainage Summary
This memo has been prepared to describe the existing conditions at 504 S. Whitcomb St, the
adjacent alley, and the drainage impacts of the proposed alley house and change in impervious
area. Below is a vicinity map showing the general location of the property:
The property is approximately 9,000 sqft (50’ wide by 180’ deep, 0.21 acres) and is located along
the east side of S. Whitcomb St and south of W. Mulberry St. A shared alley is located along the
east property line and single-family residences are adjacent to the north and south. The existing
single-family residence is located toward the west side of the lot with a 300 sqft shed adjacent
to the alley to the east and a small garden shed along the south property line. The 300 sqft shed
is proposed to be removed, along with portions of the existing sidewalk, to accommodate the
proposed addition of a detached 600 sqft alley house, and 300 sqft of additional gravel parking
area. Attached is the provided Site Development Plan for reference.
504 S. Whitcomb St.
3/29/21
Page 2 of 3
The existing property has approximately 2,870 sqft of impervious area, comprising of roof,
concrete sidewalk/patio, and gravel parking areas. The weighted percent impervious of the
existing improvements is approximately 26%. Based on aerial topography and a site visit, it
appears there is a highpoint approximately midway of the existing single-family residence, with
approximately 1/3rd of the site draining west to Whitcomb St and 2/3rd of the site drainage east
to the alley. The alley within the area of 504 S. Whitcomb St appears to be paved with asphalt,
though the surface is degrading and there are a few potholes. The alley is estimated to have an
approximate slope of 1.5% draining to the north, and an approximate cross slope of 1.5% draining
to the west side of alley. An existing residence is located adjacent to the alley along the east side,
and it appears the alley is sloped away from the building foundation. Below is are photos for
reference and you will notice the direction of the snow melt away from the building:
Accounting for the existing improvements to remain, removal of the existing 300 sqft shed, and
the addition of the 600 sqft alley house and 300 sqft gravel parking area, the site has
504 S. Whitcomb St.
3/29/21
Page 3 of 3
approximately 3,902 sqft of impervious area, with a weighted percent impervious of 35%. This is
a 1,032 sqft impervious area increase and weighted percent impervious increase of 8%. (Please
note that the impervious areas include the gravel parking area which is considered to be 40%
impervious.) Attached is an impervious area summary for reference.
Based off of aerial topography, it appears that the basin draining to the north end of the alley is
approximately 0.59 acres and estimated to be approximately 30% impervious. With the addition
of the alley house and gravel parking, it is estimated that the basin would be approximately 31%
impervious. The runoff rates were determined using general assumptions of the basin based on
aerial photos/topography and the rational method. The 100-yr runoff rate within the alley is
estimated to be 2.36 cfs for the existing condition and 2.42 cfs for the proposed condition, a 0.06
cfs increase.
Referencing these flows and general assumptions about the alley, the hydraulics of the alley were
analyzed using Hydraflow. The existing flow depth within the alley during a 100-yr storm is
estimated to be 0.17 ft deep. Under the proposed conditions, it is estimated that the 100-yr storm
flow depth is 0.18 ft deep, a 0.01 ft (or 1/8”) increase.
Based on this analysis, the runoff from proposed improvements at 504 S. Whitcomb St will remain
within the alley and not inundate the downstream residences adjacent to the shared alley. It is
recommended with the construction of additional gravel area, the depression/flowline along the
west side of the alley be maintained, if not enhanced while maintaining positive drainage to the
north, to ensure that runoff remains along the west side of the alley. Please do not hesitate to
call (970.674.7550) or email (jclaeys@highland-ds.com) if there are any additional questions.
504 S. Whitcomb St
Impervious Area Summary
Design Engineer:
Design Firm:
Project Number:
Date:
Summary
Total Site Area (50'Wx180'D)9,000 sqft
Description
Area
(sqft) % Impervious
Ex House & Sheds 1,834 90%
Ex Conc Sidewalk 336 90%
Ex Gravel Parking 700 40%
Remaining Turf/Landscape 6,130 2%
Total Impervious Area &
Weigthed %2,870 26%
Description
Area
(sqft) % Impervious
Ex House & Sheds 1,534 90%
Ex Conc Sidewalk 176 90%
Ex Gravel Parking 700 40%
Prop Alley House 784 90%
Prop Sidewalk/Patio 408 90%
Prop Add Gravel Parking 300 40%
Remaining Turf/Landscape 5,098 2%
Total Impervious Area &
Weigthed %3,902 35%
Description
Impervious
Area (sqft)
Weighted %
Impervious
Existing 2,870 26%
Proposed 3,902 35%
Difference 1,032 8%
Proposed Impervious Area
Comparison Summary
J.Claeys
Highland Development Services
21-1039-00
March 22, 2021
Existing Impervious Area
W. MULBERRY ST.S. WHITCOMB ST.504 S. WHITCOMB ST.ALLEYHIGHLANDDEVELOPMENT SERVICES6355 FAIRGROUNDS AVENUE, SUITE 100 | WINDSOR, CO 80550PHONE: 970.674.7550 | EMAIL: Info@Highland-DS.com | www.Highland-DS.comOFSHEET
DRAWN BY
CHECKED BY
DATE
SCALE (H)
HDS PROJ #
SCALE (V)504 S. WHITCOMB ST.ALLEY DRAINAGE EXHIBIT3/29/21
1" = 30'
N/A
JTC
JTC
21-1039-00
DR
1 1
N
W E
S
0
SCALE: 1" = 30'
3015
BASIN COEFFICIENT (100-YR)
BASIN DESIGNATION
BASIN AREA
DESIGN POINT
DRAINAGE FLOW ARROW
DRAINAGE BASIN BOUNDARY
LEGEND
EX CONTOUR
(AERIAL TOPOGRAPHY)
Design Engineer:
Design Firm:
Project Number:
Date:
%
Impervious
Runoff
Coefficient C
Return
Period
Frequency
Adjustment
Factor (Cf)
100% 0.95
2-year to
10-year 1.00
90% 0.95 100-year 1.25
90% 0.95
40% 0.50
5% 0.25
* Lawn area assumed to be 5% to account for misc walks
C2 to C10 C100
Ex Alley 25,603 0.588 2,502 3,963 0 1,618 17,520 29.7% 0.44 0.55
Prop Alley 25,603 0.588 2,502 4,263 0 1,918 16,920 31.1% 0.45 0.57
504 S. Whitcomb Street
DEVELOPED IMPERVIOUS AREA CALCULATION
DESIGN CRITERIA:
Fort Collins Stormwater Criteria Manual
BASINS:
J.Claeys
Highland Development Services
21-1039-00
March 29, 2021
% Impervious values from Table 3.2.2 in the Fort Collins Stormwater Criteria Manual
Land Use
Paved
Roof
Walks
Runoff Coefficients and Frequency Adjustment Factors for City of Fort Collins - Storm Water Criteria Manual
Gravel/Pavers
Lawns*
(Heavy, 2-7% Slope)
Sub-basin
Designation
Atotal
(sq feet)
Atotal
(acres)
Weighted %
Impervious
COMPOSITEApaved
(sq feet)
Aroof
(sq feet)
Awalk
(sq feet)
Agravel/pavers
(sq feet)
Alawn
(sq feet)
504 S. Whitcomb St - Rational Calcs.xlsx Page 1 of 4 Highland Development Services
Design Engineer:
Design Firm:
Project Number:
Date:
EQUATIONS:
-Equation 5-3 -Equation 5-4 -Urbanized Check Equation 3.3-5
- CoFC Overland Flow
CONSTRAINTS:
300 ft - Overland flow shall not exceed for developed condition
500 ft - Overland flow shall not exceed for undeveloped condition
Final t c = minimum of t i + t t and urbanized basin check
recommended minimum t c = 5 min for urbanized basins
Time of Concentration (2-yr to 10-yr)
Ex Alley Ex Alley 29.7% 0.44 0.588 140 0.0150 12.71 171 0.0100 0.14 0.025 1.61 1.77 14.49 311 11.73 11.73
Prop Alley Prop Alley 31.1% 0.45 0.588 140 0.0150 12.50 171 0.0100 0.14 0.025 1.61 1.77 14.27 311 11.73 11.73
March 29, 2021
504 S. Whitcomb Street
DEVELOPED TIME OF CONCENTRATION
J.Claeys
21-1039-00
Highland Development Services
LENGTH
(ft)
DESIGN CRITERIA:
City of Fort Collins Stormwater Criteria Manual
Overland Flow Equations for City of Fort Collins Stormwater Criteria Manual
SUB-BASIN DATA INITIAL/OVERLAND
TIME (ti)TRAVEL TIME (tt)
tc=ti+tt
(min)
Urban Check Final
tc
(min)DESIGN
POINT Sub-basin %
Impervious C2-10
AREA
(acres)
tt
(min)
OVERALL LENGTH
(ft/ft)
tc
(min)
SLOPE
(ft/ft)
ti
(min)
LENGTH
(ft)
SLOPE
(ft/ft)
VELOCITY
(ft/s)
ROUGHNESS
COEFFICIENT
HYDRAULIC
RADIUS
(ft)
ticttt+=
V
Ltt60
=1.871.1
10
180
+=LtcV.R2/3 S 1/2
504 S. Whitcomb St - Rational Calcs.xlsx Page 2 of 4 Highland Development Services
Design Engineer:
Design Firm:
Project Number:
Date:
EQUATIONS:
-Equation 5-3 -Equation 5-4 -Urbanized Check Equation 3.3-5
- CoFC Overland Flow
CONSTRAINTS:
300 ft - Overland flow shall not exceed for developed condition
500 ft - Overland flow shall not exceed for undeveloped condition
Final t c = minimum of t i + t t and urbanized basin check
recommended minimum t c = 5 min for urbanized basins
Time of Concentration (100-yr)
Ex Alley Ex Alley 29.7% 0.55 0.588 140 0.0150 10.57 171 0.0100 0.14 0.025 1.61 1.77 12.35 311 11.73 11.73
Prop Alley Prop Alley 31.1% 0.57 0.588 140 0.0150 10.30 171 0.0100 0.14 0.025 1.61 1.77 12.08 311 11.73 11.73
March 29, 2021
504 S. Whitcomb Street
DEVELOPED TIME OF CONCENTRATION
J.Claeys
21-1039-00
Highland Development Services
LENGTH
(ft)
DESIGN CRITERIA:
City of Fort Collins Stormwater Criteria Manual
Overland Flow Equations for City of Fort Collins Stormwater Criteria Manual
SUB-BASIN DATA INITIAL/OVERLAND
TIME (ti)TRAVEL TIME (tt)
tc=ti+tt
(min)
Urban Check Final
tc
(min)DESIGN
POINT Sub-basin %
Impervious C100
AREA
(acres)
tt
(min)
OVERALL LENGTH
(ft/ft)
tc
(min)
SLOPE
(ft/ft)
ti
(min)
LENGTH
(ft)
SLOPE
(ft/ft)
VELOCITY
(ft/s)
HYDRAULIC
RADIUS
(ft)
ROUGHNESS
COEFFICIENT
ticttt+=
V
Ltt60
=1.871.1
10
180
+=LtcV.R2/3 S 1/2
504 S. Whitcomb St - Rational Calcs.xlsx Page 3 of 4 Highland Development Services
Design Engineer:
Design Firm:
Project Number:
Date:
EQUATIONS:I = rainfall intensity (in/hr)
Q n = n -yr peak discharge (cfs)P 1 = one-hour point rainfall depth (in)
C n = n -yr runoff coefficient t c = time of concentration (min)
I n = n -yr rainfall intensity (in/hr) P 1-2yr =0.82 in
A n = Basin drainage area (ac)P 1-10yr =1.40 in
P 1-100yr 2.86 in
BASIN SUMMARY:
tc (min)
Runoff
Coeff
(C2-10)
C(A)
(acres)
Intensity
(in/hr)
Q2
(ft3/s)
tc (min)
Runoff
Coeff
(C2-10)
C(A)
(acres)
Intensity
(in/hr)
Q10
(ft3/s)
tc (min)
Runoff
Coeff
(C100)
C(A) (acres)Intensity
(in/hr)
Q100
(ft3/s)
Ex Alley Ex Alley 0.588 29.7% 11.73 0.44 0.26 2.07 0.54 11.73 0.44 0.26 3.54 0.92 11.73 0.55 0.33 7.23 2.36
Prop Alley Prop Alley 0.588 31.1% 11.73 0.45 0.27 2.07 0.55 11.73 0.45 0.27 3.54 0.94 11.73 0.57 0.33 7.23 2.42
Q2 Delta:0.01 Q10 Delta:0.02 Q100 Delta:0.06
10-yr Peak Runoff 100-yr Peak Runoff
504 S. Whitcomb Street
DEVELOPED PEAK RUNOFF
DESIGN CRITERIA:
Design
Point Sub-basin Area
(acres)
J.Claeys
Highland Development Services
21-1039-00
February 19, 2021
2-yr Peak Runoff
City of Fort Collins Stormwater Criteria Manual
%
Impervious
nnnnAICQ=
(0.786651)
1
)10(
5.28
ct
PI
+
=
504 S. Whitcomb St - Rational Calcs.xlsx Page 4 of 4 Highland Development Services
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Monday, Mar 29 2021
Existing Alley
User-defined
Invert Elev (ft) = 100.00
Slope (%) = 1.50
N-Value = 0.025
Calculations
Compute by: Known Q
Known Q (cfs) = 2.36
(Sta, El, n)-(Sta, El, n)...
( -10.00, 100.20)-(20.00, 100.30, 0.025)
Highlighted
Depth (ft) = 0.17
Q (cfs) = 2.360
Area (sqft) = 1.69
Velocity (ft/s) = 1.40
Wetted Perim (ft) = 19.84
Crit Depth, Yc (ft) = 0.16
Top Width (ft) = 19.83
EGL (ft) = 0.20
-5 0 5 10 15 20 25
Elev (ft)Depth (ft)Section
99.75 -0.25
100.00 0.00
100.25 0.25
100.50 0.50
100.75 0.75
101.00 1.00
Sta (ft)
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Monday, Mar 29 2021
Proposed Alley
User-defined
Invert Elev (ft) = 100.00
Slope (%) = 1.50
N-Value = 0.025
Calculations
Compute by: Known Q
Known Q (cfs) = 2.42
(Sta, El, n)-(Sta, El, n)...
( -10.00, 100.20)-(20.00, 100.30, 0.025)
Highlighted
Depth (ft) = 0.18
Q (cfs) = 2.420
Area (sqft) = 1.89
Velocity (ft/s) = 1.28
Wetted Perim (ft) = 21.00
Crit Depth, Yc (ft) = 0.17
Top Width (ft) = 21.00
EGL (ft) = 0.21
-5 0 5 10 15 20 25
Elev (ft)Depth (ft)Section
99.75 -0.25
100.00 0.00
100.25 0.25
100.50 0.50
100.75 0.75
101.00 1.00
Sta (ft)