August 19, 2021
James Prelog
Galloway and Company
5265 Ronald Reagan Blvd Suite 210
Johnstown, CO 80534
RE: Mars Landing, PDP190013, Round Number 5
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Mars Landing. If you have questions about any comments,
you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Tenae Beane via phone at 970-224-6119 or via email
at tbeane@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Tenae Beane, 970-224-6119, tbeane@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/29/2021
06/29/2021: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Comment Number: 2 Comment Originated: 06/29/2021
06/29/2021: INFORMATION:
As part of your resubmittal you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
2
been addressed, when applicable, avoiding responses like noted or
acknowledged.
Comment Number: 3 Comment Originated: 06/29/2021
06/29/2021: INFORMATION:
Please follow the Electronic Submittal Requirements and File Naming
Standards found at https://www.fcgov.com/developmentreview/files/electronic
submittal requirements and file naming standards_v1_8 1 19.pdf?1566857888.
File names should begin with the file type, followed by the project information,
and round number. Example: UTILITY PLANS_PROJECT
NAME_PDP_Rd2.pdf
Comment Number: 4 Comment Originated: 06/29/2021
06/29/2021: INFORMATION:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are ready to resubmit your
plans, please notify me advanced notice as possible.
Comment Number: 5 Comment Originated: 06/29/2021
06/29/2021: INFORMATION:
Temporary Service Changes - City of Fort Collins Development Review
In order to continue providing thorough reviews and giving every project the
attention it deserves, the City of Fort Collins is implementing temporary
changes in how we serve our development customers. As you may be aware,
we are experiencing staff shortages in a number of key departments, which has
begun to impact the timeliness of our reviews. We recognize that development
and construction play a critical role in our community’s vibrancy and economic
recovery, and we have been exploring options for mitigating impacts to our
customers. As a result, we will be making some temporary service changes.
Beginning Monday May 10th one additional week of review time will be added
to all 1st and 2nd round submittals (increase from 3 weeks to 4 weeks).
Comment Number: 7 Comment Originated: 06/29/2021
06/29/2021: INFORMATION:
LUC 2.211(D) Project Development Plan and Plat. Following the approval of a
project development plan and upon the expiration of any right of appeal, or upon
the final decision of the City Council following appeal, if applicable, the
applicant must submit a final plan for all or part of the project development plan
within three (3) years... If such approval is not timely obtained, the project
development plan (or any portion thereof which has not received final approval)
shall automatically lapse and become null and void.
Comment Number: 8 Comment Originated: 06/29/2021
06/29/2021: FOR HEARING:
This proposed project is processing as a Type 2 Development Plan. The
decision maker for Type 2 is the Planning and Zoning (P&Z) Board. For the
hearing, we will formally notify surrounding property owners within 800 feet
(excluding public right-of-way and publicly owned open space). Staff would
need to be in agreement the project is ready for Hearing approximately 3-5
weeks prior to the hearing. I have attached the P&Z schedule, which has key
dates leading up to the hearing.
3
Department: Planning Services
Contact: Pete Wray, 970-221-6754, pwray@fcgov.com
Topic: General
Comment Number: Comment Originated: 08/09/2021
FOR HEARING:
All of my comments are resolved and I am ready for hearing.
Department: Traffic Operation
Contact: Steve Gilchrist, 970-224-6175, sgilchrist@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 09/28/2020
10/01/2019: BY FINAL PLAN:
CDOT has provided a review and comments back. They are indicating that no
changes are needed along College (their jurisdiction) and that an access permit
for change in use will be needed at Skyway. That can be completed at final.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 15 Comment Originated: 06/29/2021
08/16/2021: REMINDER COMMENT:
06/29/2021: FOR FINAL COMPLIANCE:
Please add building roof sub-basins for each design point that enters a roof
drain to ensure the 12-inch pipe size conveys the 100-year storm.
Department: Light And Power
Contact: Luke Unruh, 9704162724, lunruh@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/01/2019
10/01/2019: INFORMATION ONLY:
There is currently 3-phase power located on the southern frontage of Skyway Dr
with conduits stubbed to the north east corner of the site.
Comment Number: 3 Comment Originated: 10/01/2019
10/01/2019: INFORMATION ONLY:
The services to the buildings will be considered a commercial service;
therefore, the service lines from the transformers to the meters are required to
be installed, owned and maintained by the property owner.
Comment Number: 5 Comment Originated: 10/01/2019
10/01/2019: FOR FINAL APPROVAL:
A commercial service information form (C-1 form) and a one-line diagram for all
commercial services will need to be completed and submitted to Light & Power
Engineering for review prior to Final Plan. A link to the C-1 form is below:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
4
Comment Number: 6 Comment Originated: 10/01/2019
10/01/2019: INFORMATION ONLY:
Electric capacity fees, development fees, building site charges and any system
modification charges necessary to feed the site will apply to this development.
Please contact me or visit the following website for an estimate of charges and
fees related to this project:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Comment Number: 7 Comment Originated: 10/01/2019
10/01/2019: INFORMATION ONLY:
L&P has an above ground vault on the corner of Skyway and College Ave. If any
existing electric infrastructure needs to be relocated or underground as part of
this project, it will be at the expense of the developer and will need to be
relocated within a dedicated easement. Please coordinate relocations with
Light and Power Engineering.
Comment Number: 9 Comment Originated: 06/22/2021
06/22/2021: AFTER HEARING AND BEFORE 1ST ROUND OF FINAL:
Please contact me to coordinate streetlight locations and finalize the electrical
layout.
Department: Environmental Planning
Contact: Kelly Smith, ksmith@fcgov.com
Topic: General
Comment Number: 5 Comment Originated: 06/30/2021
06/30/2021: FOR FINAL
Your project is not meeting the quantitative natural habitat buffer zone
requirements for .581 ac of low quality uplands habitat. Staff understands you
have worked with adjacent property owners to mitigate off site who are unwilling
to allow you to mitigate on their properties. Staff also recognizes that the
applicant has removed buildings to enlarge the buffer zone. Staff will work with
City Natural Areas Department to develop a fee in lieu to ensure the resource
value lost by this development is replaced.
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: General
Comment Number: 31 Comment Originated: 08/17/2021
8/17/2021: FOR FINAL APPROVAL
Redlines are provided that detail tree-utility conflicts. Please respond to
comments/questions and revise for final plan.
5
Department: Building Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 10 Comment Originated: 06/28/2021
06/28/2021: Construction shall comply with adopted codes as amended.
Current adopted codes are:
2018 International Building Code (IBC) with local amendments
2018 International Existing Building Code (IEBC) with local amendments
2018 International Energy Conservation Code (IECC) with local amendments
2018 International Mechanical Code (IMC) with local amendments
2018 International Fuel Gas Code (IFGC) with local amendments
2018 International Swimming Pool and Spa Code (ISPSC) with local
amendments
2018 International Plumbing Code (IPC) as amended by the State of Colorado
2020 National Electrical Code (NEC) as amended by the State of Colorado
Copies of current City of Fort Collins code amendments can be found at
fcgov.com/building.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Loads: Risk Category II (most structures):
· 140mph (Ultimate) exposure B or
· Front Range Gust Map published by The Structural Engineer's Association of
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code:
· Multi-family and Condominiums 3 stories max: 2018 IECC residential chapter.
· Commercial and Multi-family 4 stories and taller: 2018 IECC commercial
chapter.
INFORMATIONAL ITEMS:
· 10% of all parking spaces must be EV ready (conduit in place)
· This building is located within 250ft of a 4 lane road or 1000 ft of an active
railway, must provide exterior composite sound transmission of 39 STC min.
· R-2 occupancies must provide 10ft setback from property line and 20 feet
between other buildings or provide fire rated walls and openings per chapter 6
and 7 of the IBC.
· City of Fort Collins amendments to the 2018 IBC require a full NFPA-13
sprinkler system in multifamily units with an exception to allow NFPA 13R
systems in buildings with no more than 6 dwelling units (or no more than 12
dwelling units where the building is divided by a 2 hour fire barrier with no more
than 6 dwelling units on each side).
· Bedroom egress windows required below 4th floor regardless of fire-sprinkler.
All egress windows above the 1st floor require minimum sill height of 24”.
· Prescriptive energy compliance with increased insulation values is required for
buildings using electric heat.
· A City licensed commercial general contractor is required to construct any new
multi-family structure.
6
Stock Plans:
When residential buildings will be built at least three times with limited
variations, a stock plan design or master plan can be submitted for a single
review and then built multiple times with site specific permits. More information
can be found in our Stock Plan Guide at
fcgov.com/building/res-requirements.php.
Building Permit Pre-Submittal Meeting:
Please schedule a pre-submittal meeting with Building Services for this project.
Pre-Submittal meetings assist the designer/builder by assuring, early on in the
design, that the new projects are on track to complying with all of the adopted
City codes and Standards listed above. The proposed project should be in the
early to mid-design stage for this meeting to be effective. Applicants of new
projects should email rhovland@fcgov.com to schedule a pre-submittal
meeting.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/20/2019
08/11/2021: FOR FINAL PLAN-UNRESOLVED:
We will confirm at FDP.
06/29/2021: FOR FINAL PLAN-UNRESOLVED:
We will confirm at FDP.
03/22/2021: FOR FINAL PLAN:
We acknowledge the response that the Benchmark Statements have been
updated, and we will confirm that at FDP.
09/20/2019: FOR FINAL PLAN:
The Benchmark Statements shown on the Site & Utility Plan cover sheets will
need to match the following. Please provide the following information for the
Benchmark Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
7
FORT COLLINS DATUM) = NAVD88 DATUM - X.XX’.
09/25/2020: FOR FINAL PLAN:
The Benchmark Statements shown on the Site & Utility Plan cover sheets will
need to match the following. Please provide the following information for the
Benchmark Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM - X.XX’.
09/20/2019: FOR FINAL PLAN:
The Benchmark Statements shown on the Site & Utility Plan cover sheets will
need to match the following. Please provide the following information for the
Benchmark Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM - X.XX’.
Comment Number: 2 Comment Originated: 09/20/2019
08/11/2021: INFORMATION ONLY:
Unless required during PDP, a complete review of all plans will be done at
8
FDP.
06/29/2021: INFORMATION ONLY:
Unless required during PDP, a complete review of all plans will be done at
FDP.
03/22/2021: INFORMATION ONLY:
Unless required during PDP, a complete review of all plans will be done at
FDP.
09/25/2020: INFORMATION ONLY:
Unless required during PDP, a complete review of all plans will be done at
FDP.
09/20/2019: INFORMATION ONLY:
Unless required during PDP, a complete review of all plans will be done at
FDP.
Department: Outside Agencies
Contact: CDOT, Gloria Hice-Idler, gloria.hice-idler@state.co.us, 970-381-8629,
Topic: General
Comment Number: 1 Comment Originated: 09/30/2019
09/30/2019: We agree with the findings of the TIS, but because the traffic
volumes generated by this proposal increase traffic at the intersection by more
than 20%, the applicant should be required to obtain a new access permit. No
highway improvements will be required.
Contact: Randy Starr, 970-667-1029, randy@starrwestbrook.com,
Topic: General
Comment Number: 5 Comment Originated: 06/28/2021
06/28/2021: Please see attached letter from North Loudon Ditch Company.