Loading...
HomeMy WebLinkAboutDIAMOND SHAMROCK CORNER STORE #1100 PUD - FINAL - 14-89A - CORRESPONDENCE - STAFF'S PROJECT COMMENTSDeveoment Services • Planning Department Citv of Fort Collins April 20, 1989 Mr. Ken Baca _ Mr. Ed Kress Diamond Shamrock 520 East 56th Avenue Denver, CO. 80216 Dear Gentlemen: Staff has reviewed the request for Final P.U.D. for the Diamond Shamrock Corner Store and offers the following comments: 1. As one of the conditions of preliminary approval, the canopy lighting must be fully recessed. Please provide new cut sheets on this recessed specification. 2. The landscape plan does not indicate whether detention area will be seeded with a grass mix or sodded. Please specify. 3. Staff would like to re-emphasize the comment that the large hard surface paved area would be well served with planters under the canopy. Other gas stations have used planters with shade tolerant shrubs. Under straight zoning, parking lots are required to be provided with 6% landscaping. As a P.U.D., the project has greater design flexibility but should, nonetheless, try to meet or exceed the minimum requirements of the Zoning Code. 4. The southwest corner of the site needs additional easement area to accommodate the water utility. 5. The easement width along West Elizabeth should be 15 feet not 12 feet. 6. The site plan shows a logo on the east elevation of the canopy. This logo should also be added to "rear" elevation on the Elevation sheet. 7. The elevations should be labeled west, south, north, east. Not front, right, left, rear. This will assist our zoning inspectors. 8. Due to the number of proposed signs in various locations, it will assist our zoning inspectors and the sign permitting process to list, in table form, all the signs on the property. Other than the monument sign, the way I understand it, the proposed signage would be as follows: 300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 Page 2 West Elevation: canopy logo building logo "Corner Store" South Elevation: building logo North Elevation: building logo East Elevation: • canopy logo Carwash: fascia logo "Carwash" 9. The Drainage Report needs revising to account for off -site flooding from the southwest portion of the site. 10. The plat should show the area of the lot. 11. Please indicate the building envelopes and show the distance to the property lines. 12. The canopy and carwash must be within building envelopes. 13. Please add a note to the site plan stating: "All signs to comply with Sign Code". This concludes Staff comments at this time. Please note the following deadlines for the May 22, 1989 Planning and Zoning Board hearing: Plan revisions are due May 3, 1989. PMT,s, colored renderings, and 10 prints are due May 15, 1989. Final mylars, Site and Landscape Covenants, Development Agreement are due on May 18, 1989. Please feel free to call the Planning Department to discuss these comments. Sincerely: Ted Shepard, City Planner Enc. cc: Joe Frank, Assistant Planning Director Mike Herzig, Development Engineer