Loading...
HomeMy WebLinkAboutDIAMOND SHAMROCK CORNER STORE #1100 PUD - FINAL - 14-89A - SUBMITTAL DOCUMENTS - ROUND 1 - LANDSCAPE PLAN2D' G 2G WEST ELIZABETH STREET �--(3) PT /�(2) 9: 3; AJ TELE RISER BOX �\ N EYI$TING V WATER N HT r - O EXISTING FIRE O HYDRANT I ZI I I 1 I I L I I ` II I I I I I I �+ 1P 2A' 21': L+ 99.91' CHO + N OS' 17' "' E 99.77' R + S50.00' ,.ST. PORER TRAN"K. BERM r------ -- ---I(3) on BAG A�� u) Ge j(2yiC I I I I (tpISA TI HI(�T1II k W� 00 ___ BEPT VJ" I � vss I 10 0 42)CB -C v (I)PT O WSA (2)81 ALL BEDS) NG "= QzQ DoeI (zp* L I 1 ' E ROB pv •� I _lN I - OTI� F zo= EMERGAFDR xmMdTs THEE "� EYERGEnN ormRoe 77 Isar. n EmNVY v.rm T Awm 1a > Koro s.anN-••�" �6� I`- ���V ,1O awMA,. TYNt. Aw n s .N. I P1oM "" MYML me.o P,n .w, 'TREE PWTTBAG DETAIL SHRUB PLANTING DETAIL POP CITY OF FORT COLLINS NOTES: PLANT SCHEDULE: ©�m000 loom®"®" U®® ©m�s®® CC=3= m—= ' �BrEii"wiA�ll�®� ')BT Iz)B, (3)Sw(2)PT r-----------� I I I I BM XIING SOD ---- IAS . SLIDS (2)SHL ES L DU (z) + I I I • U) Bce H *.LEGEND �4I L__________-__— I __ • ` TFy£PHDNE RISER BO% > PR FMX C� �a c.+*r L1N.. .wAsva�A -R[Wuws >wR O -N-• PREPARED BY NOTES: 1. THE CONTRACTOR IS TO WREY FIELD CONDIIIONS AND NOTIFY THE LANDSCAPE ARCHITECT O ANY DSCREPANCRS PRN1R TO PROCEEDING AITH THE NOT.. 2. THE CONTRACTOR IS TO RMST AND INSTALL PLANT MATERIALS AS NOTED. ALL PLANT MATERIAL MUST EQUAL OR EXCEED THE CODE O STANDARDS CURRENTLY RE- COMMENDED BY THE COLORADO NURSERY ACT, AND IS SLB.ECT TO APPROVAL OF THE LANDSCAPE ARCHITECT. 3, PRIOR TO ANY PLANTING OPERATIONS. THE AREA TO BE PLANTED 15 TO BE PREPARED MTH 5 YARDS/1 000 QU SARE FEET l ORGAMC MATERIAL. ROTOTILLED A WNIWM OF 5- DEEP. X. EXCAVATE PLANTNNG PIT TRICE AS MDE AS IDOT BALL. PREPARE PLANT BACAFIL TO BE 1/3 ORGANIC MATERIAL AND 2/3 CEAN TCPSOL STAKE ALL EVERGREEN TREES AND ALL DECIDUOUS TAMES OVER 3' CAJPER MTH THREE GIY 'HIRES AND CANVAS STRAPS MTN GROMMETS. STAKE AL DECIOUWS TREES UNDER 3" CALPER MTH T-BAP METHOD (TWO STARES PER TREE). x0 EIIPOSED HIRES SHOULD COME INTO CONTACT MTH THE TRUNK FOR EITHER ' ING METHOD. TREE RRAP ALL DECIDUQUS TREES TO FIRST BRANCH. 5, ALL INEES AND SHRUBS ARE TO BE PLANTED AFTER RQUGN MADNG AND PRIOR TO PLACING O GROUND COVER MATERIAL I. SOD SHALL BE BLUEGRASS BLEND APPROVED BY OMNER AND SHALL BE LAID ON A FIRM BED MTH TIGHT JGNIS ANO NO VOIDS SETWEN S—S, SOD TO BE FERTAJZED MTH GRANULAR OAMMONIUM PHOSPHATE (13-N6-0) AT RAZE OF SX (6) POUNDS PER 1.000 SQ. FT. T. CONTRACTOR TO uA,NTAIN AL PLANTINGS INSTALLED UNDER THIS CONTRACT UNTIL FINAL ACCEPTANCE AND TURNOVER TO ONNER. B. PLANTS SHALL BE GUARANTEED FOR OIE GROMING SEASON. SPRING PIANTWGS XIL BE GUARANTEED THRWGN OCTOBER O 11E SAME YEAR. ANY PLANTINGS AFTER TINE MONTH CT, AUGUST NIL. BE CLARANTFED THROUON MAY THE FOLLONING SPRING. ANY PLANT MATERIAL THAT IS ION QUESTIONABLE CONOIION MAY RECEIVE AN EXTENDED GUARANTEE AT THE REOEST OF THE LANDSCAPE CON ACTOR AND APPROVAL OF THE LANDSCAPE ARCHITECT. ALL GUARANTEES ON PLANTS ARE IDOL NCI -LONG MATERIALS AND LABOR BASED UPON A ONE-TIME REPLACEMENT. 9. ALL BEDS TO MULCHED 'MTH PO.E PEELINGS, SUB - SAMPLE TO LANDSCAPE ARCHITECT FOR APPROVAL NULCH ALL PLANTING KIDS AT A S OEPTH. ID. PLANING KID EDGER TO BE RYERSON STEEL EDGER, 1/B" X 4- % 10. OR EQUAL AS APPROVED BY THE LANDSCAPE ARCHITECT. it. CONTRACTOR TO REPAIR OR REPLACE ANY SOD. MULCH OR S M IMPROVEMENTS DISTURBED OR DAMAGED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE ONNER. 12. CONTRACTOR TO PROVIDE FOR PROTECTION O' ALL LITIES, UTIPRIVATE OR PUBLIC PROPERTY. AND PUBLIC FOR TfE DURATION OF THE CONTRACT AND SH- REPAIR OR REPLACE ANY DAMAGES TO SAME MTHQUT ADDITIONAL COST TO THE OMFER. 13. CONTRACTOR SHALL SECURE AND PAY AL APPLICABLE TAXES PERMITS AND FEES N CONNECTION MYN THE WO1IX UNDER THE CONTRACT. 1A CONTRACTOR SMALL KEEP THE PREMISES CLEAN AND ORDERLY AND SHALL DISPOSE O ALL WASTE AND DEBRIS AT AN APPROVED LOCATION OFF -SITE PRIOR TO FNAL ACCEPTANCE 15. PLACE GEOTEXTILE FABRIC (Mat- 1140-S OR EWAU LINGER ALL ROdt AND PLANTING BEDS. 16. LANDSCAPE INSTALLATION TO BE COMPLETED PRIOR TO ISSUANCE OF CENTFlCATE OF OCWPANCY. 17. IRRIGAYOH SYSTEM SHALL HAVE SHRUB BEDS AND LATIN AREAS ZONED SEPARATELY. LAWN AREAS TO BE POP-IP SPRAY SYSTEM. SHRUB BEDS TO HAVE Fl L COVERAGE MTH EITHER A POP-UP STRAY SYSTEM. MICRO-ONI ER, OR GRIP SYSTEM. 18. ALL NERDS TO BE A STED TO PREVENT oWISPRAY ONTO BLIIDINGS AND NMX-WAYS 19. BACNM . PREVENTION DEVICE SHALL BE IN ACCORDANCE MTH Ott SPEC6KATLXNS. GALLCRAY. ROMEPO A SEED: - CCNSL0.ONG ENGINEERS 2445 E. -P AVE. #502 DERVEP, CO 80239 (303) 311-5105 I 11 DIAMOND SHAMROCK I (Tl 9830 COLONADE eLVD /V SAN ANTONIO, TEXAS ]8230 ANDSCAPE PLAN IAMOND S AMBOCA CO TORE NO.— P.U.D. 1 OF t