HomeMy WebLinkAboutDIAMOND SHAMROCK CORNER STORE #1100 PUD - PRELIMINARY - 14-89 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTrFINAL DRAINAGE REPORT
•
DIAMOND SHAMROCK GAS STATION, CONVENIENCE STORE AND CAR WASH
LOT 2, FAIRVIEW SHOPPING CENTER II
1515 W. ELIZABETH STREET
FORT COLLINS, COLORADO
FEBRUARY 6, 1989
This drainage report has been based on and is in compliance
with "Storm Drainage Design Criteria and Construction Standards"
manual issued by the City of Fort Collins dated May, 1984.
-.1, 5�z�
Roge A. Barringer, P.E.
Galloway, Romero & Associates
Prepared For:
Diamond Shamrock Refining And Marketing Company
520 E. 56th Avenue
Denver, Colorado 80216
Attn: Ed Kress
Prepared By:
Galloway, Romero and Associates, Inc.
• 12449 E. 39th Avenue
Denver, Colorado 80239
Attn: Roger Barringer
• FINAL DRAINAGE REPORT
DIAMOND SHAMROCK GAS STATION, CONVENIENCE STORE AND CAR WASH
LOT 2, FAIRVIEW SHOPPING CENTER II
1515 W. ELIZABETH ST.
FORT COLLINS, COLORADO
FEBRUARY 6, 1989
General Location and Description
The site is located on the south side of Elizabeth Street,
just west of Shields and contains 1.465 acres. It is part of
Fairview Shopping Center with existing stores on either side and
vacant property to the south. Planned for this site is a Diamond
Shamrock gasoline station, convenience store and car wash.
Drainage Design Criteria
• This drainage study has been prepared using the Rational
Method since the site is relatively small and less than 200
acres. Calculations have been performed for the 2, 10 and 100
year storms. Flows offsite have been limited to historic rates.
Drainage Facility Design
The site has been divided into two subbasins: A and B.
Subbasin A contains 1.304 acres and has again been subdivided
into Al and A2. Subbasin Al contains 0.793 acres and includes
most of the landscaping, about half the paving and the car wash.
Subbasin A2 contains 0.511 acres which includes the remainder of
the paving, the store and some landscaping to the north.
Subbasin B contains 0.161 acres and includes the remainder of the
landscaping to the north and east.
Runoff will be as follows: runoff from subbasin Al (2 yr:
1.56 cfs, 100 yr: 4.56 cfs) will be captured in a trench drain at
the southeast access point, and directed through PVC pipe into a
detention pond (maximum volume: 4500 cu. ft.) at the south side
of the site. Runoff from subbasin A2 (2 yr: 1.26 cfs, 100 yr:
3.67 cfs) will also be captured by a trench drain, at the
• northeast access, and directed to the same detention pond. This
flow will not include car wash discharge which will be routed
into a sand trap located within the car wash building, and then
into the sanitary sewer. Detained water from the pond will then
be released through a restricting orifice and 12 inch pipe at a
100 year rate of 1.35 cfs. Discharge will be into an existing
storm sewer to the north of the site.
Runoff from subbasin B (2 yr: 0.21 cfs, 100 yr: 0.61 cfs)
will be nominal since the subbasin is mostly grass covered, and
will be directed offsite to the north and east.
Total runoff after detention will be 2.74 cfs for the 100
year event which is less than the historical value of 2.76 cfs.
The buried fuel tanks, to be located to the east of the
proposed convenience store, will be anchored to concrete deadmen
placed at the bottom of the tank farm excavation. The anchorage
for these tanks will be designed to withstand all buoyancy loads.
• Conclusions
This design and the accompanying plan is in compliance with
the City of Fort Collins storm drainage requirements, and
provides sufficient drainage control to mitigate any effects to
downstream sites. Sufficient detention has been provided onsite
to reduce total developed runoff to the historic rate.
•
•
A P P E N D I X
•
•
-.VICINITY MAP
.... I
mmx
•
RUNOFF
CALCULATIONS
RATIONAL
METHOD
PROJECT:
DIAMOND SHAMROCK - 1515 W ELIZABETH
MUNICIPALITY: CITY FORT COLLINS
DATE:
06-Feb-89
INPUT
STORM FREQUENCY SELECTION:
2,5,100 (1); 2,10,100 (2); 5,10,100
(3)
SELECTION ==—> 2
....................................................................................................
LAND AREAS
;
RUNOFF COEFFICIENTS
HIST EXIST
DEVEL.
2y
l0y
100y
IMP.
GRASS 57511 NA
22124
0.20
0.20
0.20
0
PAVING 6290 NA
39326 ;
0.95
0.95
0.95
100
ROOFS 0 NA
2351 ;
0.95
0.95
0.95
90
SOILS 0 NA
0 ;
0.00
0.00
0.00
0
TOTALS (SQ FT) 63801 NA
63801 ;
•
(ACRES) 1.465 NA
....................................................................................................
1.465 ;
HISTORIC
EXISTING
DEVELOPED
SHEET FLOW
LENGTH WATERCOURSE (L)
240
NA
233
ft
< site plan
SLOPE WATERCOURSE (S)
1.67
NA
1.72
%
< site plan
CHANNEL FLOW
C100
0.34
NA
0.86
< calc from below
LENGTH CHANNEL (Lc) =
0.00
0.00
58.00
ft
SLOPE CHANNEL (Sc) =
0.00
0.00
0.01
%
VELOCITY IN CHANNEL (Vc)
0.00
0.00
4.66
fps
< velocity curves
CALCULATIONS
RUNOFF COEFFICIENTS (SUM C*A/SUM A)
STORM FREQUENCY HIST EXIST DEVE L
2y
0.27
NA
0.69
10y
0.
NA
0.69
100y = C(1.25) =
0
0.34 34
- -
NA
- -
0.8686
-
10
10
I*
CALCULATED RUNOFF
HIST
--------------------------------------------------------
INITIAL TIME (Ti) (sheet flow)
LENGTH WATERCOURSE (L)
240
SLOPE WATERCOURSE (S)
1.67
C100 =
0.34
a) Ti = 1.87(1.1-C100)(L".5)/(S".33)
18.50
b) Ti = L/180 + 10 =
N/A
USE Ti =
18.50
TRAVEL TIME (Tt) (channel flow)
LENGTH CHA,`NEL (Lc) =
0.00
SLOPE CHANNEL (Sc) =
0.00
RUNOFF VELOCITY (Vc) =
0.00
Tt = Lc/Vc(60) =
0.00
TIME OF CONCENTRATION (Tc)
Tc = Ti + Tt =
18.50
USE
18
RAINFALL INTENSITY (I) - from time -intensity -duration curves
12
1.95
I10
3.42
I100
5.50
2 YEAR STORM:
A
1.465
C
0.27
1
1.95
RUNOFF (Q) = A*C*I
0.78
10 YEAR STORM:
------------------------------------------------------------
A
1.465
C
0.27
1
3.42
-----------------------------------------------
RUNOFF (Q) = A*C*I
1.37
100 YEAR STORM:
-------------------------------------------------------------
A
1.465
C
0.34
1
5.50
------------------------------------------------------
RUNOFF (Q) = A*C*I
2.76
EXIST
-------------------------------------
DEVEL
UNITS
NA
233
ft
NA
1.72
%
NA
0.86
NA
5.56
min
NA
11.29
min
NA
5.56
min
0.00
58.00
ft
0.00
0.01
%
0.00
4.66
fps
0.00
0.21
min
NA
5.87
min
NA
6
min
NA
3.00
in/hr
NA
5.25
in/hr
NA
8.75
in/hr
NA
1.465 acres
NA
0.69
NA
3.00 in/hr
NA
3.03 cfs
NA 1.465 acres
NA 0.69
NA 5.25 in/hr
NA 5.31 cfs
NA
1.465 acres
NA
0.86
NA
8.75 in/hr
NA
11.05 cfs
0
REQUIRED DETENTION VOLUME
TIME
MIN
SEC
I100
A
--------------------------------
0
0
NA
1.46
5
300
NA
1.46
10
600
NA
1.46
15
900
5.95
1.46
20
1200
5.18
1.46
25
1500
4.60
1.46
30
1800
4.17
1.46
35
2100
3.80
1.46
40
2400
3.50
1.46
45
2700
3.24
1.46
50
3000
3.00
1.46
55
3300
2.79
1.46
60
3600
2.60
1.46
0
D E
V E L O P
E D
HISTORIC
REQ'D
C100
Q100
VOLUME
Q100
VOLUME
DET'N
0.86
NA
NA
2.76
0
NA
0.B6
NA
NA
2.76
828
NA
0.86
NA
NA
2.76
1655
NA
O.B6
7.52
6754
2.76
2483
4281
0.86
6.54
7852
2.76
3310
4542
0.86
5.81
8716
2.76
4138
4578
0.86
5.27
9481
2.76
4965
4516
0.86
4.80
10080
2.76
5793
4287
0.86
4.42
10610
2.76
6620
3990
0.86
4.09
11050
2.76
744E
3602
0.86
3.79
11368
2.76
8275
3093
0.86
3.52
11630
2.76
9103
2527
0.86
3.28
11623
2.76
9931
1892
REQUIRED DETENTION = 4578
mmx
� 0
S U B B A S I N CALCULATIONS
INPUT
.ul
SUBBASINS: Al A2 A tot B E F
GRASS
13474
3800
17274
4850
0
0
PAVING
20285
16886
37171
2155
0
0
ROOFS
784
1567
2351
0
0
0
SOILS
0
0
0
0
0
0
TOTALS (SQ FT)
34543
22253
56796
7005
0
0
(ACRES)
0.793
0.511
1.304
0.161
0.000
0.000
TOTAL SITE AREA (ac) 1.465
CALCULATIONS
• RUNOFF COEFFICIENTS (SUM C*A/SUM A)
STORM FREQUENCY Al A2 A tot B E F
2y
0.66
0.82
0.72
0.43
BRR
ERR
l0y
0.66
0.82
0.72
0.43
ERR
ERR
100y
0.66
0.82
0.72
0.43
ERR
BRR
C
Al
•
•
CALCULATED RUNOFF
Al
A2
A tot
B
E
F
UNITS
TIME OF CONCENTRATION
(Tc) (overall site)
USE
5.87
5.87
5.87
5.87
5.87
5.87
min
RAINFALL INTENSITY (I)
- from time -intensity -duration
curves
12
3.00
3.00
3.00
3.00
3.00
3.00
in/hr
I10
5.25
5.25
5.25
5.25
5.25
5.25
in/hr
I100
8.75
8.75
8.75
8.75
8.75
8.75
in/hr
2 YEAR STORM:
A
0.793
0.511
1.304
0.161
0.000
0.000
acres
C
0.66
0.82
0.72
0.43
ERR
ERR
1
3.00
3.00
3.00
3.00
3.00
3.00
in/hr
RUNOFF (Q) = A*C*I 1.56
1.26
2.82
0.21
ERR
ERR
cfs
10 YEAR STORM:
A
0.793
0.511
1.304
0.161
0.000
0.000
acres
C
0.66
0.82
0.72
0.43
ERR
ERR
1
5.25
5.25
5.25
5.25
5.25
5.25
in/hr
RUNOFF (Q) = A*C*I
100 YEAR STORM:
A
C
I
2.74 2.20 4.94 0.36 ERR ERR cfs
0.793
0.511
1.304
0.161
0.000
0.000
0.66
0.82
0.72
0.43
ERR
ERR
8.75
8.75
8.75
----------
8.75
8.75
8.75
acres
in/hr
-------------------
RUNOFF (Q) = A*C*I 4.56 3.67 8.24 0.61 ERR ERR cfs
DETENTION POND DESIGN
SUBBASIN
SUBBASIN
AREA
POND
MAX.
ORIFICE
POND
SLOPE
PIPE
10.
AREA
RATIO
AREA
DEPTH
HEAD(h)
VOLUME
PIPE(s)
N.
Al
34543
0.541
0
0.0
0.00
0
0.000
0.000
A2
22253
0.349
0
0.0
0.0
0
0.000
0.000
A tot
56796
0.890
4600
3.0
3.0
4600
0.005
0.013
B
7005
0.110
0
0.0
0.0
0
0.000
0.000
E
0
0.000
0
0.0
0.0
0
0.000
0.000
F
0
0.000
0
0.0
0.0
0
0.000
0.000
TOTALS 63801 1.000 4600 4600
•
•
•
ALLOWABLE RELEASE RATE COMPUTATION
------- —----------------------- —
SUBBASIN A
--------------------------------------------------------------------------------
AREA RATIO
=
0.B9
TIME
TOT DEV
AREA
DEV VOL
REQ'D
MIN
SEC
VOLUME
RATIO
BASIN
DET'N
DIFF
RELEASE
------------------------------------------------------------------------
0
0
NA
0.89
NA
4600
NA
NA
5
300
NA
0.39
NA
4600
NA
NA
10
600
NA
0.89
NA
4600
NA
NA
15
900
6764
0.89
6021
4600
1421
1.579
20
1200
7852
0.89
6990
4600
2390
1.991
25
1500
8716
0.89
7759
4600
3159
2.106
30
1800
9481
0.89
8440
4600
3840
2.133
35
2100
10080
0.89
8973
4600
4373
2.082
40
2400
10610
0.89
9445
4600
4845
2.019
45
2700
11050
0.89
9837
4600
5237
1.940
50
3000
11368
0.89
10120
4600
5520
1.840
55
3300
11630
0.89
10353
4600
5753
1.743
60
3600
11823
0.89
10525
4600
5925
1.646
MAXIMUM REQUIRED RELEASE RATE = 2.133
ORIFICE SIZE
USE "Cd" = 0.62
REQUIRED AREA = Q / Cd*(29h)".5
35.65 sq in
CIRCULAR: 6.74 inches diameter
SOUARS: 5.97 inches square
PIPS SIZE
--------------------
Q = 2.941(s".5)(r-2.67) / n
Q = 2.133 cfs
slope (s) = 0.005
n = 0.013
r = 0.47 ft
diameter (min) = 11.28 inches
•
1�
•
RELEASE SUMMARY
--------------
SUBBASIN
A
B
TOTAL
REQUIRED
PIPE SIZES
RELEASE UNITS
2.13 cfs
0.61 cfs
2.74 cfs
---------------
2.76 cfs
Q = 2.941(s".5)(r"2.67) / n Al A2 units
Q =
8.236
3.674
cfs
slope (s) =
0.010
0.010
length =
58.00
96.00
n =
0.013
0.013
r =
0.68
0.51
ft
diameter (min) =
16.43
12.14
in
use:
18.00
12.00
in
velocity =
4.66
4.68
fps