December 13, 1988
Diamond Shamrock
c/o Ken Baca
520 E. 56th Ave.
Denver, CO 80216
Dear Sirs:
For your information, attached is a copy of the Staf f's comments concerning
Diamond Shamrock Gas Station and Convenience Store, which was presented
before the Conceptual Review Team on December 12, 1988.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Ted Shepard
Projc:.t Planner
TS/bh
Attachment
xc: Tom Peterson, Director of Planning
Mike Herzig, Development Coordinator
Jim Faulhaber, Civil Engineer I
Project Planner
✓File
300 LaPorte Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
CONCEPTUAL IREVIEIV STAFF COMMENTS
MEETING DATE: December 12, 1988
ITEM: Gas station and convenience store
APPLICANT: Diamond Shamrock, c/o Mr. Ken Baca, 520 E. 56th Ave., Denver,
CO 80216.
LAND USE DATA: Request for a 1,654 sq. ft. convenience store, 4 gas pump
islands, gas pump canopy, detached one -bay automatic carwash, on 63,881 sq. ft.
site located at 1515 W. Elizabeth Street between Taco Bell and Potts Restaurant in
the Fairview subdivision.
COMMENTS:
1. The request will be evaluated under the Auto Related and Roadside Commer-
cial point chart. At present, the project achieves a score of 62.9% and
therefore exceeds the 50% minimum. The point score could be higher upon
presentation of evidence that the facilities will exceed the Model Energy Code
as adopted by the City of Fort Collins.
2. Three phase power is available from the oversized transformer located on the
Taco Bell site. This power should be sufficient for your operation.
3. A 6 inch water main is available in the private access road. A sewer main is
available on the south side of the site. Taps will be made to these lines.
4. At present, the Street Oversizing Fee is $14,926 per acre. With 63,881 sq. ft.,
the fee would be approximately $24,000. Please be aware that the City
Council is considering a reduction to about $14,005 per acre. If adopted, the
new fee would be effective in Spring of 1988.
5. The site must provide at least one handicap parking space and ramps. Direc-
tional signage must not exceed 4 sq. ft. per sign. Circulation and stacking for
the carwash must be striped or controlled to avoid conflicts.
6. The detached automatic carwash will require separate water and sewer taps.
7. A Traffic Impact Analysis will be required. This study should look at two
primary areas. First, the impact and the operation of the private access road
must be addressed. This aspect should address the interfacing with Taco Bell,
the distance of the curb cut from the intersection with Elizabeth, and the
width of the curb cut. Second, the Study should look at the cross traffic
with Potts restaurant. This aspect should address the location of the
connecting drive, turning radii for fire equipment, overflow parking, and,
generally, how it all works together.
8. A Drainage Report will be required. Basically, storm flows will be required
to detain onsite and release through controlled outlet structures into the storm
sewer that is onsite. The Drainage Report, along with a grading and drainage
plan, must meet the criteria of the Stormwater Utility of the City of Fort
Collins.
9. Use the administrative plat process to vacate old casements and dedicate new
ones as necessary.
10. Please be aware that the private access drive will also serve as a secondary
access for Phase IV of the Matador Apartments.
11. The development agreement for Carl's Jr. restaurant will be researched to sec
if any public improvements are obligated with the development of this prop-
erty.
12. Street trees
will
be expected to be
planted along both frontages. These
deciduous trees
are expected to be
a minimum of 2 inch in caliper, and
planted on
30 to
35 foot centers.
Berms along West Elizabeth Street arc
expected to
be of
sufficient height to
block headlights. Both the convenience
store and the
carwash
are expected
to have foundation plantings and other
features to
soften
the transition from
the asphalt surface. Shrub beds should
be designed
to be
covered in 3 to 4 years
growth.
13. The large landscaped area on the south indicates that a greater setback could
be afforded along Elizabeth Street.
14. The two curb cuts on the access road look exceptionally large. This reduces
the potential landscaped area.
15. Have you considered placing the gas pumps and canopy at an angle to the
street' This would create a more interestin. look and may facilit:.,, urning
movements within the site.
16. Have you considered placing the access to the Potts parking lot towards the
rear of the site? This would create less traffic in front of the pumps
reducing conflicts.
17. Ground mounted signs are preferred over pole signs.
18. In general, all signage will be reviewed as a design element of the P.U.D.
As a P.U.D., the site will not be allowed all the signage area allowed by
the Sign Code.