HomeMy WebLinkAboutTIMBERLINE - INTERNATIONAL - FDP210020 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY (2)DELICH ASSOCIATES Traffic & Transportation Engineering
2272 Glen Haven Drive Loveland, Colorado 80538
Phone: (970) 669-2061 Fax: (970) 669-5034
MEMORANDUM
TO: Shawn Palinkas, Ziggi’s Coffee
Devin Ferrey, FR Corp
Steve Steinbicker, Architecture West
Steve Gilchrist/Nicole Hahn, Fort Collins Traffic Operations
FROM: Matt Delich
DATE: September 4, 2020
SUBJECT: Ziggi’s at Timberline Transportation Impact Study
(File: 2057ME02)
This memorandum constitutes a transportation impact study (TIS) for the Ziggi’s
Coffee Shop at Timberline. The Ziggi’s at Timberline site is located in the northwest
quadrant of the Timberline/International intersection in Fort Collins. The site location is
shown in Figure 1. The site plan for Ziggi’s at Timberline is shown in Figure 2. The
scope of this memorandum was discussed with Steve Gilchrist, City of Fort Collins Traffic
Operations. A base assumptions form and related information is provided in Appendix
A.
Existing Streets
This is a developing area of the City of Fort Collins. Therefore, much of the
engineering street criteria do not meet current Fort Collins standards. The existing
geometry at the Timberline/International intersection is shown in Figure 3.
Timberline Road is classified as a four-lane arterial street on the Fort Collins
Master Street Plan. Currently, Timberline Road has a two-lane cross section (with
center median lane), south of International Boulevard. North of International Boulevard,
Timberline Road has a two-lane cross section with no center median lane, for
approximately 700 feet. There is a center median lane north of Crusader Street. At the
Timberline/International intersection, Timberline Road has a northbound left-turn lane,
one through lane in each direction, and a southbound right-turn lane. The
Timberline/International intersection has stop sign control on International Boulevard.
The existing speed limit in this area is 40 mph.
International Boulevard is classified as a two-lane arterial street. Currently,
International Boulevard only exists to the west of Timberline Road. At the
Timberline/International intersection, International Boulevard has an eastbound left-turn
lane and an eastbound right-turn lane. However, there is provision for an eastbound
through lane at the intersection. There is no posted speed limit on International
Boulevard.
DELICH Ziggi’s at Timberline, September 2020 ASSOCIATES Page 2
Existing Traffic/Operation
The peak hour traffic at the Timberline/International intersection is shown in
Figure 4. Traffic counts at the Timberline/International intersection were obtained in
August 2020. Raw traffic count data is provided in Appendix B.
Using the volumes shown in Figure 4, the current peak hour operation at the
Timberline/International intersection is shown in Table 1. Calculation forms for these
analyses are provided in Appendix C. The Timberline/International intersection was
analyzed using the unsignalized intersection techniques from the 2016 Highway
Capacity Manual, 6th Edition (2016 HCM). A description of level of service for
unsignalized intersections from the 2016 HCM is provided in Appendix C. Table 4-3
showing the Fort Collins Motor Vehicle LOS Standards (Intersections) is also provided
in Appendix C. At unsignalized intersections, acceptable operation during the peak
hours is defined as level of service D overall and level of service F for any approach leg
for an arterial/collector, arterial/local, collector/local, and local/local intersection. As can
be seen in Table 1, the Timberline/International intersection is currently meeting the Fort
Collins operational criteria with existing control and geometry.
Trip Generation/Trip Distribution/Trip Assignment
In a memorandum dated August 12, 2020, trip generation for the Ziggi’s coffee
shop was analyzed. It was determined that Ziggi’s Coffee franchise data should be
used for trip generation purposes. This cited memorandum is provided in Appendix D.
Trip Generation, 10th Edition, ITE was used to estimate the daily and peak hour trip
generation for the Retail portion of the Ziggi’s at Timberline development. From these
sources, the daily and peak hour trip generation as shown in Table 2. The trip
generation resulted in 568 daily trip ends, 67 morning peak hour trip ends, and 33
afternoon peak hour trip ends. Passby trips were applied using the techniques in the
Trip Generation Handbook, 3rd Edition. The trip distribution for the Ziggi’s at Timberline
development is shown in Figure 5. Figure 6 shows the site generated peak hour traffic
at the Timberline/International and Timberline/Site Access intersections.
Background/Total Traffic Projections
Background traffic projections for the short range (2025) future horizon were
obtained by factoring the recent traffic volumes on Timberline Road and International
Boulevard by two percent per year. Figure 7 shows the short range (2025) background
peak hour traffic at the Timberline/International intersection.
The traffic volumes generated by the proposed Ziggi’s at Timberline development
were added to the background traffic volumes to produce the total traffic volume
forecasts. Figure 8 shows the short range (2025) total peak hour traffic at the
Timberline/International and Timberline/Site Access intersections.
DELICH Ziggi’s at Timberline, September 2020 ASSOCIATES Page 3
Operation Analysis
Table 3 shows the short range (2025) background morning and afternoon peak
hour operation at the Timberline/International intersection. The Timberline/International
intersection will meet the Fort Collins operational criteria with existing control and
geometry. Calculation forms for these analyses are provided in Appendix E.
Table 4 shows the short range (2025) total morning and afternoon peak hour
operation at the Timberline/International and Timberline/Site Access intersections. The
Timberline/International and Timberline/Site Access intersections will meet the Fort
Collins operational criteria with existing/recommended control and geometry.
Calculation forms for these analyses are provided in Appendix F.
Geometry
As an arterial street, Timberline Road needs to be widened from International
Boulevard north to Crusader Street, to include a center median lane. Widening this area
of Timberline Road could have significant impacts to properties to the north on both sides
of Timberline Road. Widening would require right-of-way and cooperation from a number
of property owners. As such, no center median lane is expected to be built in this segment
in the near future. Figure 9 shows the recommended geometry at the Timberline
/International and Timberline/Site Access intersections. Not having a left-turn lane on
Timberline Road approaching the Site Access means that northbound left turns must be
executed from the through lane. This can cause possible conflicts (rear-end accidents)
with the northbound through traffic on Timberline Road. According to the analyses in
Appendix F, the northbound left-turn queue at the Timberline/Site Access intersection is
calculated at less than one vehicle during both peak hours. This means that only the one
left-turning vehicle will conflict with the northbound through traffic on Timberline Road.
The average delay for a left-turning vehicle is 9.8 seconds in the morning peak hour and
8.4 seconds in the afternoon peak hour. If this delay increases, the chance for a conflict
with the northbound through traffic increases.
Queuing Analysis for Ziggi’s Drive-thru Coffee Shop
Figure 10 shows the queuing diagram for the drive-thru coffee shop. The highest
trip generation occurs in the morning peak hour. According to the site plan, there will be
one drive-thru window and two order boards. The single lane drive-thru aisle is
approximately 160 feet long and can accommodate seven vehicles at a spacing of 23.5
feet per vehicle (front bumper to front bumper). The double drive-thru aisle with the two
order boards is approximately 120-125 feet long (inside lane) and 145-150 feet long
(outside lane), and can accommodate 11 vehicles total. A total of 18 vehicles can be in
the queue without impacting the main parking lot.
DELICH Ziggi’s at Timberline, September 2020 ASSOCIATES Page 4
Service time data in the morning peak hour was obtained from a Ziggi’s Coffee
Shop in the northwest quadrant of the College/Trilby intersection. This Ziggi’s Coffee
Shop had one drive-thru window and one order board. Ziggi’s Coffee has a goal of
three minutes between ordering and finishing the transaction (exiting). At this location,
the time between ordering and exiting was approximately 3.15 minutes. During the time
spent between the order board and arriving at the window, the order will be prepared
and be available at the window when the vehicle arrives. The service time with respect
to the queuing analysis is the time spent at the service window. The data indicates that
the average service time at the window is 79.6 seconds (1.33 minutes).
In order to determine if the available 18 vehicle length queue is adequate, a
queuing analysis, as described in Chapter 8 of Transportation and Land Development,
ITE, 1988, was conducted. The results of the queuing analysis indicated that the 95th
percentile longest queue, during the morning peak hour, would need to accommodate
eight vehicles (7.58592 vehicles) at one time. The probability that there would be one
or more vehicles in the queue is approximately 26.8 percent. Since the available length
can accommodate 18 vehicles with no impact to the site, it is concluded that the drive-
thru lane will accommodate the 95th percentile queue. Therefore, the queue will not
extend out to the main parking lot, nor will it impact Timberline Road.
Pedestrian/Bicycle Level of Service
There are sidewalks along the east side of Timberline Road, south of
International Boulevard. There are sidewalks on the north side of International
Boulevard. There are no other sidewalks in the immediate area. However, the Ziggi’s
at Timberline development is unlikely to produce much pedestrian traffic.
There are bicycle lanes along Timberline Road. There are no designated bicycle
lanes along International Boulevard. However, there is enough width in International
Boulevard for approximately 700 feet from Timberline Road that bicycles can operate
safely.
Transit Level of Service
Currently, this area is served by Transfort Route 14 along Timberline Road.
There is a bus stop south of International Boulevard near Donella Court and to the north
near Annabel Avenue.
Conclusions
It is concluded that the Timberline/International and Timberline/Site Access
intersections will meet the Fort Collins operational criteria with existing/recommended
control and geometry. As an arterial street, Timberline Road should have a center
DELICH Ziggi’s at Timberline, September 2020 ASSOCIATES Page 5
median lane to accommodate left-turning vehicles. However, this improvement will not
likely occur in the near future. As such, no center median lane is expected to be built in
the near future. Since the northbound vehicles entering the site will be in the northbound
through lane, there will be some delay to the through traffic. The results of the queuing
analysis for the drive-thru lane indicated that the longest queue (95th percentile), during
the morning peak hour would need to accommodate eight vehicles at one time. Since
the combined minimum available length can accommodate 18 vehicles, it is concluded
that the back of the queue will not conflict with the on-site circulation of the site or
Timberline Road. It is respectfully requested that no further transportation analyses
related to the proposed development of Ziggi’s at Timberline be required at this time.
BURLINGTON NORTHERN RAILROAD
Mulberry TimberlineVine
International
Lincoln
14
SCALE: 1"=1000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES Ziggi's at Timberline TIS, September 2020
Page 6
SCALE: 1"=40'
SITE PLAN Figure 2
DELICH
ASSOCIATES Ziggi's at Timberline TIS, September 2020
Page 7
EXISTING INTERSECTION GEOMETRY Figure 3
DELICH
ASSOCIATES Ziggi's at Timberline TIS, September 2020
Page 8TimberlineInternationalSTOP- Denotes Lane
AM/PM
RECENT PEAK HOUR TRAFFIC Figure 4
DELICH
ASSOCIATES Ziggi's at Timberline TIS, September 2020
Page 9TimberlineInternational154/156278/57061/25622/41133/14
225/135
DELICH Ziggi’s at Timberline, September 2020 ASSOCIATES Page 10
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/International
(stop sign)
EB LT F (50.3 secs) D
EB RT D B
EB APPROACH D B
NB LT B A
OVERALL A A
TABLE 2
Trip Generation Using Ziggi’s Franchise Data
Code Use Size AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
820 Shopping Center 2.545 KSF 37.75 94 0.58 1 0.36 1 1.83 5 1.98 5
N/A Ziggi’s Coffee 0.624 KSF N/A 474 N/A 33 N/A 32 N/A 12 N/A 11
Total 568 34 33 17 16
TimberlineInternational
14
10%55%35%SCALE: 1"=600'
TRIP DISTRIBUTION Figure 5
DELICH
ASSOCIATES Ziggi's at Timberline TIS, September 2020
Page 11
AM/PM
SITE GENERATED
PEAK HOUR TRAFFIC Figure 6
DELICH
ASSOCIATES Ziggi's at Timberline TIS, September 2020
Page 12
International
2/30/11/20/1 Timberline11/9-9/-523/8-20/-312/10
21/6
Site Access
AM/PM
SHORT RANGE (2025) BACKGROUND
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES Ziggi's at Timberline TIS, September 2020
Page 13TimberlineInternational170/172307/62967/28688/45436/15
248/149
AM/PM
SHORT RANGE (2025) TOTAL
PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES Ziggi's at Timberline TIS, September 2020
Page 14
International
170/172309/63267/29689/45636/16
248/149 Timberline11/9334/63923/8735/47912/10
21/6
Site Access
DELICH Ziggi’s at Timberline, September 2020 ASSOCIATES Page 15
TABLE 3
Short Range (2025) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/International
(stop sign)
EB LT F (76.4 secs) E (41.5 secs)
EB RT E (39.7 secs) B
EB APPROACH E (44.4 secs) C
NB LT B A
OVERALL A A
TABLE 4
Short Range (2025) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Timberline/International
(stop sign)
EB LT F (77.8 secs) E (42.3 secs)
EB RT E (40.0 secs) B
EB APPROACH E (44.8 secs) C
NB LT B A
OVERALL A A
Timberline/Site Access
(stop sign)
EB LT/RT C C
NB LT/T A A
OVERALL A A
AM/PM
RECOMMENDED GEOMETRY Figure 9
DELICH
ASSOCIATES Ziggi's at Timberline TIS, September 2020
Page 16
International TimberlineSite Access
STOPSTOP
SCALE: 1"=30'
QUEUING DIAGRAM Figure 10
DELICH
ASSOCIATES Ziggi's at Timberline TIS, September 2020
Page 17