DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 99-41 Issuance Date: I h z f z0 cb
Project Name: Townhomes at Timber Creek
Project A.K.A.:
Project Location: Northeast corner of Timberline Drive and Timber Creek Drive
Permittee: KEM Company, LLC, a Colorado Limited Liability Company
City and developer contacts: See attached Exhibit "A "for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $000.001 paid RR
Construction Inspection Fee (paid prior to issuance of this permit) $ 6,412.20
Total $ 6,712.20
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 78,820.50
Form of security deposited with the City: L,6T �� �'F �K"F.oi T
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: AJ A"
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans and the
"as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
N
•
•
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: 0-
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and authority
the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's
Approval for issuance:
0
City Engineer Approval: Date: Z Z 000
(Permit fssuance Date)
3
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Townhomes at Timber Creek, P.U.D.
Project A.K.A.:
City Staff Contact Persons:
Development Engineer: Marc Virata
281 N. College Avenue, Fort Collins; CO 80524
(970) 221-6605 x7188
mvirata@ci.fort-collins.co.us
Construction Inspector: Rhonda Henson
281 N. College Avenue, Fort Collins, CO 80524
(970) 221-6605 x7903
Cell (970) 217-4089
Pager (970) 622-1690
Current Planner: Ted Shepard
281 N. College Avenue, Fort Collins, CO 80524
(970) 221-6343
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, CO 80521
(970) 221-6854
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, CO 80521
(970) 224-6063
Natural Resources: Kim Kreimeyer
281 N. College Avenue, Fort Collins, CO 80524
(970) 221-6641
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, CO 80524
(970) 224-6062
Street Closures: Syl Mireles
625 Ninth Street, Fort Collins, CO 80524
(970) 221-6815
Exhibit "A" Page 1 of 3
r
Transportation Planning: Kathleen Reavis
210 E. Olive, Fort Collins, CO 80524
(970) 224-6140
Forestry: Tim Buchanan
281 N. College Avenue, Fort Collins, CO 80524
(970) 221-6641
Light and Power: Janet McTague
700 Wood Street, Fort Collins, CO 80521
(970) 224-6154
Developer's Contact Persons:
Project Manager: David S. Brown
KEM Company, LLC
3000 S. College Avenue, STE 103, Fort Collins, CO 80525
(970) 223-4900 (office)
(970) 223-4901 (fax)
Developer/Owner: KEM Company, LLC
C/o William Krug, Manager
3000 S. College Avenue, STE 103, Fort Collins, CO 80525
(970) 223-4900 (office)
(970) 223-4901 (fax)
Architect/Planner: Brad Massey
Aller-Lingle Architects
748 Whalers Way, Fort Collins, CO 80525
(970) 223-1820 (office)
(970) 223-1833 (fax)
Project Engineer: Patricia Kroetch, P.E.
North Star Design
1200 Carousel Drive, Suite 201, Windsor, CO 80550
(970) 686-6939
northstar@uswest.net
General Contractor: William T. Nicholl
Gerrard Excavating, Inc.
1739 S. County Road 13C, Loveland, CO 80537
(970) 669-1463 (office)
(970) 669-1964 (fax)
Exhibit "A" Page 2 of 3
•
C
Landscape Contractor: Gary Olsen
Waterboy Sprinklers & Landscape
1216 N. Shields Street, Fort Collins, CO 80521
(970) 484-4202 (office)
(970) 416-0277 (fax)
Surveyor: King Surveyors, Inc.
9299 Eastman Park Drive, Windsor, CO 80550
(970) 686-5011 (office)
(970) 686-5821 (fax)
Exhibit "A" Page 3 of 3
TOWNHOMES AT TIMBER CREEK- Proposed Development Schedule
MON TUES WED T1411P FRI a A-r
SUN
JAN
3
4
5
6
7
8
9
finalize paperwork for PC
P issuance
JAN
10
11
12
13
14
15
16
GERRARD: begin overlol---------------------
----------------------
KING: stake foroverlot -----------------
JAN
17
18
19
20
21
22
23
MLK, JR, DAY
GERRARD:overlot ---
----------------------
GERRARD: begin sewer
----------------------
KING: stake for sewer-----------------
JAN
24
25
26
27
28
29
30
GERRARD:sewer -----
--------------------------------------------CITYINSPECT
GERRARD: begin wateri
istall ----
--------
KING:stakeforwater ---
-------------
JAN
31
FEB 1
2
3
4
5
6
Construction Coord Mtg
or joint trenching
GERRARD:water ------
----------------------
----------------------
----------------------
------------------------
FEB
7
8
9
10
11
12
13
Pull construction permit
or first building
CITYINSPECT
Begin joint trench: City, USW,
AT&T------------
----------------------
KING:stake forjointtren
h-----------------
FEB
14
15
16
17
18
19
20
KING: stake for first build
ng-----------------
Continuejoint trench---
------------------------
PuSCoinstall--------
----------------------
KING:stakeforPuSCo-
------------------------
CITYENERGIZE
FEB-
21
22
23
24
25
26
27
Excavate for first building
---------------
Foundation for first buildi
g-----------------
PREStDENVS DAY
PuSCoinstall---------
----------------------------------------------
KING: stake for cletachec
garages
FEB
28
29
R 1
2
3-4-
5
Foundation for first buildi
g----------------- Plumbing underground,
rstbuilding-----------
-------------------_--
GERRARD:excavate forfoundations/slabs
detached garages --------------------------------------------------------
Pull (F&F) permits fords
ached garage buildings
•
12/29/99 - Page 1 of 2
TOWNHOMES AT TIMBER CREEK- Proposed Development Schedule
MON TUES WED THUR FRI CAT
SUN
MAR
6
7
8
9
10
11
12
GERRARD: backfillfirst
foundations/slabs detact,
uilding
edgarages----------
floors/slabs, first building
--------------------------------------------------------------------
----------------------
------------------------
MAR
13
14
15
16
17
18
19
floorsIslabs, firstbuilding----------------------
KING: stake for curb/gutter
-----------------
Begin framing on firstbulding
GERRARD: grade for cur
-----------------
/gutter---------------
------------------------
----------------------
MAR
20
21
22
23
24
25
26
GERRARD: grade for cut/gutter---------------
GERRARD: install curb/clutter
-----------------
------------------------
MAR
27
28
29
30
31
APR 1
2
GERRARD: install curb
utter -----------------
--------------------------------------------------------------------
APR
3
4
5
6
7
8
9
Grade for paving -------
----------------------
----------------------
PAVE AS WEATHER
ALLOWS
APR
10
11
12
13
14
15
16
•
•
12/29/99 - Page 2 of 2
DEC-02-99 THU 13:14 KEM WS INC FAX NO, 970#901
P.02
TOWNHOMES at TIMBER CREEK,
P.U.D.
Project Quantities and Cost Estimate Sheet
DZription e�l �i� Units of -'.Es_tirnated Total
Co nqtrucflon
Total
:Lsggc - ion mg-a-;qrqQuantit.y '
j�-��-
jqsnit ,�a
-Measure
Fee Fee
of
. .. ......... . .
STORM SEWER
...............
- --------------
....... . . ... ... . ............ . .... .. .. . . . .. .....
JRqinforced Conc P 0.60
. .................... LF 0
....... . . . $0.00
.............
$o-00;; .............
. .
Tr...-....
ench 0.60 LF 0 $0.004
. ...... . . . . .. . ............... ... . . .................. ........
$000
-
.... ...................... . . . . ......
ConcreteHeadwall 3.0 ............ ... ... ....... . .......... Cy 1 0 $0.00i $0. ...... ................... .
L4
.... ... ...........
Water Quality gmtjq: Structures 3.00 Cy 0 $0.W
......... ... ........ . .............
. ....................
$0.
$0.0,
0
All -Inlet Typ 90-00 EA 0 $0.00 i
$0-0 0
. . ... . ......................................................
$0.001
. .
Manholes 90.00 EA . ...... ....................... .. . . . ............... $0.00;
....... ....... ........ 0
'Pan
$0.001
$0.00!
.. . .. ....................... . ........
i--l'Soncrete LF 1830 $1098.00:
.. . . ..... ..... .................................. . . . . . .
2' Sidewalk Meta!) ... ..... .... ......9-0-.00 EA 3 $270.00:'
00,00
$5,400.00
SUBTOTALS STORM SEWER>>I$l . . . .. . . .............. ------------ - - .... ............... ..
. ............... . .....
$20,040.00
.
[�KAER
........ . . ............ . .......... . ...... . .......................... . .. .... ................. . ..... ................
: .......
.............. ..... ....... ... 8" Main 60 LF
. . . ........... . . .............. 0,$417.00: .
. . . ............ . ............
$23.001
. ............ .. . .
. .15.... . .... . ............
$,985.00 i
Manholes 8 $720-00;
(._..;.Manholes............ . . .................................. ... . EA ...... .. .. . . . ..... I ............. . .....................
. . ..................
$
.. L500-00
. . . . .............
$12.000,00;
4" Services 60-00 13
.. . ........ ..... ........... . .... $780.00
$475.00
$G, 175.001
Service Lines 0.00 LF 661 ................. ...... ...........
. . .. . .................. ............... ............ . .......... ..... $0.00�
--------------- .. . . . ........... .... . -4 ..
$13.00 i
........ . ...................... ....... .......................
$8,593-00!�
. . .... ..
+ Trench 0.00 LF 1356 $0,00
.......... ............ ......... ... .. ............
............................ . SUBTOTALS i�,917.001
$8.50: $11,526-00
54,2
..... . .. ................ ---------
WATER ....... .. . ..... . ........... ..................
.... . ..................
. . . ......... .................. .... . ............. .............. . ...
..:I" Services . ........ 30.00 6 $180.00.
........
$1,200-001
.............
$7,200.001
:1 1/2" Services i 30.00 EA .. ...... ......................... .... . ..... . ................... ... . . ...... . . ................... 4 8 $240.00 i
.... .......... ..... ... ........... .......
$2,000.00!
$16 000 00
....... . ...
i Wat!�r,.q" DIP
.................... . ..... .... . ....... .......... ..... 0-60 LF 761 $456.60!
.... . ..... .. . ............ . . .
$20.00i
... .. ...................................
$15,220-001
:-8----"- --2---2------1--1----2---- Elbow30-00 EA 4 $.1..2.0....0..0.. t1 .............
.....................
. $.2..00..0...01
.........
$800-001
. ........
8" Valve and Box 2 $120.00�
60.00 EA .................. . .........
.......... .......... . . .. ...... .. . .... ........ .......... . ................
$700-00
$1,!100.00i
. .... . ...................... . .. . ......................... 7
18" 45 Elbow EA 4 ................. ......... . . . . .................. 3 . o : 20.001
... .........
........ ...
$200-00:
..... .. .... ............... I
$800.00
i8 x 6 Tee EA 3
...$90.00�:
........$30.00�
7.---0-
8 x 6 Reducer ------ 30-00 EA
. ......... . .......... . ........... -
.- ........
$100.00.......
.$.2-.-..
....$810-00
00!!
:Water, G" DIP 0.60 L.F 270 1 $162�00;:
. ............... ... . ......................... . . ............... ; %
... .........
:6"
$16-00� ..................
$4,320.00
. ...
Valve and Box
. .. . ... . . ............................. ....... ................ EA 4 $240.W:
........... . . ..
$190.00:
.. . . .................
$
j G" 90 Elbow 30.00 EA
......... . .. ... ............ - $30.00i
•........... . ................... . . .. .................. ......
$130.00:
. . ......
$130.00!
........................... . .....
Fire Hydrants $300-00:
EA ................................ ....... 4 ................... ... .. . . ... ....... 5
......... ....
$Z,350.00'
...... . ..... .....
:Trench 0.60 LF -....1031 $618.60
.... ........ . ....
.... . . ...................
$5.501
$5.670.501
SUBTOTALS .... ....... WATER>> 1 $2.707-20
*STREET SYSTEM
insi. c
U 4yg�,46 is 4.6
ow art-mpec. 19 ifv t
I&OS101f. dltk
..... ......... .........
$ 12.00!
$60,852,00
G, tb Is
U.
$8.00L
.0
$10. 00:
.$16,320-00
..........
$2,820.00
. .. ..
.................. .. . ... ..........
$ 6.001
...................... . ...........
$12,240.001
..
t
.................... ...........
$18-00'
. . . .............. ............
. ....... .
.$1 080.00.
0,242
.
$2.00:
. .............................
$4,120.00
$127p256.00:
..................... . .. ............ ... ..............
. . .....................................
3ie.uu
..... ....... . . ............
. .. ........... ............... . ........
: .. ............... ............. . . .............
Pavement in
public
.q�!i right-of-wa Sy 980 $294.00: $12.0
...................... .. ........ ........... . ......... . ........ ....... .... ... ..... ........ . . . ............ . ........... ....... ........ ...... .oL $11,760.00
'Crosswalks in p .��qc -y�a o.so SF
_.qgt.pf _y . 210 $12 6.00:t
... .... $10.001 $2,100-00
. ................. . ..... ........ S.U..S.TOTALS - STREET SYSTEM (PUBLIP)��j $420.001
...... $13860.00
SUBTOTALS - STREET _SYSTEM .. .SUBTOTALS ..... . ............... STREET ............... ................ E ...(ALL)>>j $420.001 $141 116.00
. ............. 2 -1 $733,020.50
. .. . ............ .......
INSPECTION FEE TOTAL -,-�$6,412. 9,11 ---------
. ..........
. . ....... ........... .. . .....
. .... .. . ............... .... . ......... .
. .................. . . ...... ------------ TOTAL INFRASTRUCTURE COST >1 $280395.50
.......... .
.. . . .........
.. . .................
..... . ..... . ......
.... .. . ........... ... . ...............
+ denotes items added/changed relative to cqVi al submission dated 11 /9/99