HomeMy WebLinkAboutTOWNHOMES AT TIMBER CREEK PUD - FINAL - 16-89O - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY•
0
����Q• n��� (IQC TECTS QC.
748 WHALERS WAY • BLDG E, SUITE 200 • FORT COLLINS • COLORADO 80525 • (303) 223-1820
Memorandum
DATE: 9-14-99
TO: Ted Shepard
FROM: Brad Massey
PROJECT NAME: Townhomes at Timber Creek
PROJECT NO.: 9736
C MMENTS:
Dear Ted:
This memo is to request a waiver of the requirement for an updated Transportation Impact Study as is
normally required for submittal of the final P.U.D. In our opinion, there have been no significant
changes to the site layout or density that would warrant an update. The TIS submitted during
preliminary was based on 68 units and our current layout has 66 units with the private access drive in
the same alignment.
Thank you for your consideration of this request.
Brad
cc. Dave Brown - KEM Homes / Bueno Development