Loading...
HomeMy WebLinkAboutTOWNHOMES AT TIMBER CREEK PUD - FINAL - 16-89O - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY• 0 ����Q• n��� (IQC TECTS QC. 748 WHALERS WAY • BLDG E, SUITE 200 • FORT COLLINS • COLORADO 80525 • (303) 223-1820 Memorandum DATE: 9-14-99 TO: Ted Shepard FROM: Brad Massey PROJECT NAME: Townhomes at Timber Creek PROJECT NO.: 9736 C MMENTS: Dear Ted: This memo is to request a waiver of the requirement for an updated Transportation Impact Study as is normally required for submittal of the final P.U.D. In our opinion, there have been no significant changes to the site layout or density that would warrant an update. The TIS submitted during preliminary was based on 68 units and our current layout has 66 units with the private access drive in the same alignment. Thank you for your consideration of this request. Brad cc. Dave Brown - KEM Homes / Bueno Development