Loading...
HomeMy WebLinkAboutBLOOM - PHASE 1 - PDP210014 - SUBMITTAL DOCUMENTS - ROUND 1 - VARIANCE REQUEST5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 •GallowayUS.com August 18, 2021 City of Fort Collins Engineering Department 281 North College Avenue Fort Collins, CO 80522 RE: Mulberry Delozier Connection Variance Dear Marc Virata, A variance is requested for the connection of Delozier and International Blvd. The variance requested is to create a temporary radius connection. The ultimate condition is to be a tee intersection between Delozier and International Blvd. The Right of Way is being dedicated to for this ultimate condition, in addition to the proposed area need for the radial connection. The inside flowline radius is 100’ . The justification for this variance is the connectivity provided during the interim condition for the proposed development in addition to the existing Mosaic development. There will be no additional Right of way requirements from these properties at the time of the International Blvd construction. Sincerely, GALLOWAY James Prelog, PE Civil Engineering Project Manager JamesPrelog@GallowayUS.com cc: