Loading...
HomeMy WebLinkAboutSTETSON CREEK, FIFTH FILING - PRELIMINARY - 16-89K - SUBMITTAL DOCUMENTS - ROUND 2 - HAZMATSI�IIII t1a ios Landscape ArcYutec~ture Site Plar ring • GrapYucs 719 Pear Street Fort C 7lhris, C D 80521 • 970.472.9125 • FAX 970.493.8634 MEMORANDUM To: Ron Gonzales, Poudre Fire Authority Steve Olt, Current Planning, City of Fort Collins From: Terence C. Hoaglund, ASLA Project: Stetson Creek Fifth Filing Re: Swimming Pool Hazardous Materials Summary Date: November 17, 1998 Hazardous Materials Used: Chlorine Tablets, solid form Likelihood of Release: It is possible that a tablet may be dropped, which would likely break. It is not anticipated that this would happen on a regular basis. Action Plan: The broken tablets would be swept up and reused, or disposed of properly. Since this form of chlorine is solid, the impact of a spill on the environment is minimal. All storage and handling would be done per current Poudre Fire Authority and Health Department Regulations.