Loading...
HomeMy WebLinkAboutSTETSON CREEK, FIFTH FILING - PRELIMINARY - 16-89K - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTStuc[os LaricLscape ArcYutecture •Site Plar,r�ir,g CYra�Yucs 719 Pear Street Fort CAllin_s, CO 80521 - 970.472.9125 • FAX 970.493.8634 MEMORANDUM To: Steve Olt, City of Fort Collins Current Planning Darwin Horan, The Writer Corporation Bill Mayer, Rocky Mountain Consultants Kim Straw, Cityscape urban design From: Terence C. Hoaglund, ASLA -T--4 Project: Stetson Creek Fifth Filing Re: Staff comments received 12/15/98 Date: January 11, 1999 Staff Review • Trickle Pans — Clark Mapes suggested that we use a darker colored concrete in lieu of the cobbles, to reduce the visual impact of the trickle pans. Writer has agreed • Maintenance of Storm Drainage Facilities — HOA will maintain methods to be discussed at hearing. • Off site Temporary easements — were provided to the city on 12/18/98 Zoning • Handicap Parking spaces — non -issue, garages count towards the requirements, no action required. • Building lot lines and setbacks — After much discussion with Jenny and Gary over the interpretation of the code is as follows: • Setback from public ROW is 15' as measured from the right-of-way line, regardless of where the lot line is. No action required on front lot lines. • Rear setback is 6' when garages face an alley - We will need to adjust the rear lot lines accordingly, and provide a utility and access easement where the back of the lots encroach into the driveway. • Side setbacks are 5' — We will adjust the lot lines accordingly. • Square footage of each lot needs to be shown on the final plat. • While not a formal comment, it was determined that the code does not allow covered porches to encroach into the setback, while allowing nearly everything else including balconies, terraces, bay windows, uncovered porches, etc. This will require us to shift some buildings slightly including Building 2 (shift <6" to the West), Buildings 6, 8, &10 (shift < 3' to the north), Building 13 (<3' to the northeast), Building 15 (<3' to the t1a LancLSc�pe ArcYiitecture Site Plarimil g Graphics 719 Pear Street Fort Coll iris, CO 80521 - 970.472.9125 - FAX 970.493.8634 southeast), Building 25 (<3' to the south), and Building 26 (<6" to the east). These will be completed prior to final compliance. • Larger site plan of clubhouse — Not required, will need to show stripped parking lines on the street with at least one handicap parking stall. No off-street parking required. • Landscape Note — Will modify note #9 as suggested. • Height dimensions on elevations — these dimensions were on the elevations submitted. Was confirmed by Jenny. No action required. • Plat — appropriate quantities were provided to planning with revision submittal. • Mail Box Kiosk Locations — Will show mail box locations on Final Compliance Plans • Sound Proofing along Timberline — Zoning concurred that the landscaping shown is sufficient for their requirements. No action required. • Street tree and sight lines — The street standards state that canopy trees are to be placed no closer than 30' to a street intersection. The plans meet or exceed that requirement. No action required. Police • Street name change — the name was changed on the site plan from Alder Creek Drive to Copper Creek Drive, but was not changed on the plat. This will be changed on the plat prior to final compliance. US West • No comments requiring action TCI Broad band utility easement required — Will obtain as required prior to filing of plat