HomeMy WebLinkAboutSTETSON CREEK, FIFTH FILING - PRELIMINARY - 16-89K - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETf+,Ah,L
Project: -1
Planner:I-
Wneer:
jj
TraM( Operations:
Items Requested
Site land Plat I Utility Drainage Rpt Other Items Required
Engineering x X X
Redlined It(
Site [and Plat
Stormwater
Water/Wastewate
Traffic Operations
x
x
x
x
x
x
x
Trans. Planning
X
K
TranOrt
Natural Resources
Park Planning
Totals
A
-3
Note: All redlined items should be returned with the resubmittal/ revisions.
Date: A T
ms Being Returned I .
0
6